Est. value ₹99.9 L · EMD ₹2 L · Closes 29 Oct 2026, 3:00 pm
Ministry of Railways published this works tender on eProcure on 6 Oct 2026, for Mumbai. The estimated value is ₹99.9 L and the EMD is ₹2 L. It closes on 29 Oct 2026, 3:00 pm IST. Tender ID 92529002 · Ref DRM-RJT-2026-27-E-43R.
Timeline
- Published6 Oct 2026
6:07 pm - Bidding starts15 Oct 2026
- Closes29 Oct 2026
3:00 pm
Key figures
Estimated value₹99.9 L
EMD₹2 L
Closing date29 Oct 20263:00 pm IST
Key facts
- Contract type
- Works - General · Expenditure
- Tender type
- Open
- Tendering section
- SR.DENC
- Bidding system
- Single Packet System
- Bidding style
- Single Rate for Each Schedule
- Validity of offer
- 60 days
- Completion period
- 6 Months
- Tender document cost
- None
- JV / consortium
- Not allowed
- Ranking order
- Lowest to Highest
- Expenditure type
- Capital (Works)
- Pre-bid meeting
- None
- Inviting officer
- Sr DEN Co.- RJT W. RailwayRAJKOT DIVISION-ENGG/WESTERN RLY
Complies with the Public Procurement (Make in India) Order 2017
The tender inviting authority confirms this tender does not violate the GFR rules on procurement through GeM
Bidders from a country sharing a land border with India must be registered with the competent authority
About this tender
For complete description and other details, please refer to tender
- Reference
- DRM-RJT-2026-27-E-43R
- Tender ID
- 92529002
- Bid type
- Open/Advertised
- Product category
- Railway related Products
- Organisation type
- Central Govt. Ministry/Department
- Location
- Mumbai
- Portal
- eProcure
- Inviting authority
- RAJKOT DIVISION-ENGG/WESTERN RLY
Schedule of work
| Item | Quantity | Railways’ estimated rate | Amount |
|---|---|---|---|
| Schedule A · CPWD DSR ITEMS | |||
| 1Please see item breakup for details.Escalation -32% | ₹68,59,738.68 | ||
| Schedule B · DSR-Horticulture | |||
| 1Please see item breakup for details. | ₹19,71,051.69 | ||
| Schedule C · NS ITEMS | |||
| 1Preparation of the ashplt coat for the tennis court. | 1 Job | ₹6,45,000 | ₹6,45,000 |
| 2Providing and lying syanthetic acrelic cusion syasye 5 layer | 1 Job | ₹4,75,000 | ₹4,75,000 |
| 3Proviging and fixing best quality net post set. | 1 Set | ₹26,000 | ₹26,000 |
| 4Providing poly uretha foam roller light weight width 36 inch. | 1 Each | ₹18,000 | ₹18,000 |
| Total | ₹99,94,790.37 | ||
Bids quote a percentage above, below or at par with these rates · The total matches the advertised value.
Documents
- Notice inviting tenderOpen document
- Proforma of Annexure VIBProformaofAnnexure-VIB.pdfDirect link not supplied in the PDFView reference in PDF ↗
- ACS 01 to 09 of IRGCC 2022ACS1to9ofGCC2022.pdfDirect link not supplied in the PDFView reference in PDF ↗
- Annexure VIAnnexure-VI.pdfDirect link not supplied in the PDFView reference in PDF ↗
- Annexure VAAnnexure-VA.pdfDirect link not supplied in the PDFView reference in PDF ↗
- Revised Format for CertificatesAnnexure-VVARevisedFormatForCertificate.pdfDirect link not supplied in the PDFView reference in PDF ↗
- PBG FORMATPBGFORMAT.pdfDirect link not supplied in the PDFView reference in PDF ↗
- Proforma of MOU for JVProformaofMOUforJV_1.pdfDirect link not supplied in the PDFView reference in PDF ↗
- Bank DetailsBankDetails.pdfDirect link not supplied in the PDFView reference in PDF ↗
- No Relative CertificateNoRelativeCertificate.pdfDirect link not supplied in the PDFView reference in PDF ↗
- Certificate for Railway EmployeeCertificateforRailwayEmployeeRe-engagement.pdfDirect link not supplied in the PDFView reference in PDF ↗
- Letter of Credit as Mode of PaymentLetterofCreditasModeofPayment.pdfDirect link not supplied in the PDFView reference in PDF ↗
- Procedure for PaymentProcedureforpaymentofcontractorbillImplementationofGST.pdfDirect link not supplied in the PDFView reference in PDF ↗
- Procedure For Ensuring Safety At WoProcedureForEnsuringSafetyAtWorkSite.pdfDirect link not supplied in the PDFView reference in PDF ↗
- Safety RulesSafetyRules.pdfDirect link not supplied in the PDFView reference in PDF ↗
- ACS 01 to 11 of IRGCC APRIL 2022GCCACS1to11.pdfDirect link not supplied in the PDFView reference in PDF ↗
- ACS 10 of IR GCC 2022ACS10ofIRGCC2022.pdfDirect link not supplied in the PDFView reference in PDF ↗
- IRSGCC APRIL 2022GCC_April-2022_2022_CE-I_CT_GCC- 2022_POLICY_27.04.22.pdfDirect link not supplied in the PDFView reference in PDF ↗
- Annexure-V(A)Annexure-V(A).pdfOpen document
Documents to submit
Commercial-Compliance
- Document optional
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Technical-Compliances
- Document required
The tenderer shall clearly specify whether the tender is submitted on his own (Proprietary Firm) or on behalf of a Partnership Firm / Company / Joint Venture (JV) / Registered Society / Registered Trust / HUF etc. The tenderer(s) shall enclose the attested copies of the constitution of their concern, and copy of PAN Card along with their tender. Tender Documents in such cases are to be signed by such persons as may be legally competent to sign them on behalf of the firm, company, association, trust or society, as the case may be.(Para 14.1 Page 17 of IRGCC April 2022).
- Document optional
Documents to be Submitted Along with Tender shall be as per Para-14, 17 & 18 (Annexure-I, Tender Form (Second Sheet)) of IRGCC April 2022 corrected upto date.
- Document required
Certificate of Information regarding Employment/Partnership etc. of Retired Railway Employees with the tender as per the attached Performa. As per clause No 16
- and
- of IRGCC Part-I April 2022 corrected up to date. (As per IRGCC April 2022, Para 16, Page 19-20).
- Document required
Certificate of No Relative being an employee of Western Railway as per attached Performa.
- Document optional
Joint Venture (JV) in works tenders. Refer GCC para no 17.1 to 17.15.3 of Part-I IRGCC April 2022 corrected up to date. (As per GCC-April 2022, Para 17, Page -20 to 24). Joint Venture Firms Shall be applicable to the works tenders of value more than Rs. 10 Cores (Rupees ten crores) Advance Correction Slip No. 1 (Rly. Board letter No.2022/CE-I/CT/GCC-2022/Policy date 14.07.2022).
Show all 11
- Document optional
Participation of Partnership Firm in works tenders. Refer IRGCC para no 18.1 to 18.11 of Part-I April 2022 corrected up to date. (As per IRGCC April 2022, Para 18, Page 25 to 27).
- Document required
The tenderer should upload the scan copy of EPFO and ESI registration number. However EPFO and ESI registration would be mandatory and documents towards EPFO and ESI registration must be submitted before execution of the agreement.
- Document optional
The tenderer shall be required to submit Bid Security with the tender for due performance with the stipulation to keep the offer open till such date as specified in the tender, under condition of tender. (GCC April 2022 Part I Instructions to tenderers (ITT) para 5 Bid Security (1) (a,b,c),(2) (3)(i-viii).
- Document required
As per ACS-2, ACS -3 & ACS-4 of IRSGCC April 2022, in case of other than Company/ Proprietary firm, Annexure - V(A) shall be submitted by the each member of a Partnership Firm/ Joint Venture (JV)/ Hindu Undivided Family (HUF)/ Limited Liability Partnership (LLP) etc. as the case may be. Non submission of above certificate(s) by the bidder shall result in summarily rejection of his/ their bid. Proforma of Annexure-V(A) attached in documents
Custom
- Document required
Bank details in the format attached in document uploaded.
Eligibility
Special Financial Criteria
- Document required
The tenderer must have minimum average annual contractual turnover of V/N or "V" whichever is less ; where V= Advertised value of the tender in crores of Rupees, N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. As per IRGCC April-2022, Para 10.2 & 17.15.2 of Tender Form (Second Sheet) of Annexure I, each bidder or each member of a JV must fill Annexure-VIB separately and submit requisite information along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
As per IRGCC April-2022 Para 10.3 & 17.15.3 of Tender Form (Second Sheet) of Annexure I, for tenders having advertised value more than Rs 20 crore wherein eligibility criteria includes bid capacity also, the tenderer will be qualified only if its available bid capacity is equal to or more than the total bid value of the present tender. The tender/ technical bid will be evaluated based on bid capacity formula detailed as Annexure-VI. Proforma of Annexure-VI attached in documents.
- Document required
The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet of the previous three financial years. Non submission of above, the offer will be summarily rejected.
However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover.
Proforma of Annexure-VIB attached in documents.
Special Technical Criteria
- Document required
The tenderer must have successfully completed or substantially completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited:
- Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or
- Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or
- One similar work costing not less than the amount equal to 60% of advertised value of the tender.
In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited:
- Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or
- Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or
- One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note for b (1): Separate completed works of minimum required values shall also be considered for fulfilment of technical eligibility criteria for different components.
In such cases, what constitutes a component in a composite work shall be clearly predefined with estimated tender cost of it, as part of the tender documents without any ambiguity. Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organisation, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.
Definition of Similar Work Any Civil Engineering work
Partnership firm/Joint Venture (JV) / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc.
Please submit a certificate in the prescribed format (please download the format from the link given below). Non submission of the certificate, or submission of certificate either not properly filled in, or in a format other than the prescribed format shall lead to summary rejection of your offer. ( Click here to download the Format of Self Certification)
Terms & conditions
General Instructions
Signature on Receipts for Amount.
Every receipt for money which may become payable or for any security which may become transferable to the Contractors under these presents, shall, if signed in the partnership name by anyone of the partners of a Contractor's firm be a good and sufficient discharge to the Railway in respect of the moneys or security purported to be acknowledged thereby and in the event of death of any of the Contractor, partners during the pendency of the contract, it is hereby expressly agreed that every receipt by anyone of the surviving Contractor partners shall if so signed as aforesaid be good and sufficient discharge as aforesaid provided that nothing in this Clause contained shall be deemed to prejudice or effect any claim which the Railway may hereafter have against the legal representative of any Contractor partner so dying for or in respect to any breach of any of the conditions of the contract, provided also that nothing in this clause contained shall be deemed to prejudice or effect the respective rights or obligations of the Contractor partners and of the legal representatives of any deceased contractor partners interse. (GCC April 2022 para 53).
Applicability of rules for this tender.
IRGCC April 2022 with upto date correction slip.
CPWD DSR (Delhi Schedule of Rates) and CPWD Specifications (or latest) shall be used for all works related to Building Works, Road Works and Horticulture works and other Miscellaneous works with effect from 01.06.2021 with latest Correction Slips issued from time to time by CPWD.
Relevant IS-Codes and Railway Codes and Manuals.
In these Special Conditions of Contract the following terms shall have the meaning hereby assigned to them except where the context otherwise requires.
(a)"General Condition of Contract" shall mean General Conditions of Contract- April 2022 as contained in Western Railway, Engineering Department "Indian Railways Unified standard specifications (works and materials) Vol-I &II".
"Specifications" shall mean the Specifications for Materials and Works of the Railway as specified under the authority of the Ministry of Railways or Chief Engineer or as amplified, added to or superseded by special specifications if any, appended to the Tender Forms. (GCC April 2022 Part I para I Instructions to tenderers (ITT)).
Standard Schedule of Rates (SSOR) shall mean the schedule of Rates adopted by the Railway, which includes-
- "Unified Standard Schedule of Rates of the Railway (USSOR)" i.e. the Standard Schedule of Rates of the Railway issued under the authority of the Chief Engineer from time to time, updated with correction slips issued up to date of inviting tender or as otherwise specified in the tender documents;
- "Delhi Schedule Of Rates (DSR)" i.e. the Standard Schedule of Rates published by Director General/ Central Public Works Department, Government of India, New Delhi, as adopted and modified by the Railway under the authority of the Chief Engineer from time to time, updated with correction slips issued up to date of inviting tender or as otherwise specified in the tender documents. If any dispute arises between the parties with respect to this agreement any application or suit shall be instituted only in the; court with the local limits or whose Jurisdiction, the Western Railway's Divisional Headquarters office is situated and both the parties shall be bound by this clause. (Head Quarters Letter No. CE-Circular No. 11/No. W/623/5/ARB/1 dt. 26.04.04).
Show all 55
Special Conditions
RCC / Structural design and drawing of structures shall be done by contractor as per approved GAD by Railway. the design and drawings submitted by the agency shall be checked / approved by Government Engineering College / University / NIT / IIT to Railway before starting the work at site. All the expenditure related to design, preparation of drawing, approval of Government College / University / NIT / IIT shall be borne by the agency. The decision of DEN / Sr. DEN will be final and binding. The same may scrutinized and approved by HQ Office, Churchgate, if required.
'Tenderers should submit their offer strictly in accordance with the terms and conditions of the tender document. Tenderer should not quote any deviation from the tender document and should not quote any conditions. Nevertheless, as an exception, if any unavoidable deviations or conditions are quoted by the tenderers, financial impact of each of such conditions / deviations on their quoted unit rates, in terms of Rupees per unit rate, shall be clearly mentioned by the tenderer in the tender offer. If any of the deviation / condition has no financial impact on the quoted rates, in such cases also, the tenderer must clearly mention its financial impact as 'NIL'. This is required for proper financial evaluation of such conditional / deviated offers. Conditional offers / offers with deviations, without quantified financial impact of each of the condition / deviation on the quoted rates, shall be considered as "incomplete" and shall be summarily rejected'. (In terms of CE(Works)CCG's Letter No. W.118/0/3/S.I(W6) dt. 27.06.16,). Any revision of rates / rebates submitted (quoted) through a separate letter whether enclosed with the bid (Tender Form) or submitted separately or mentioned elsewhere in the document other than specified place shall be summarily ignored and will not be considered. (Para-3 of tender form second sheet).
Special Provision in Connection with Para-26 (Page 56-57) of IRGCC April 2022 (As per Railway Bd's Letter No. 2012/CE- I/CT/0/20 dt 10/05/13).
(A) In terms of provisions of new Clause 26A.1 to the General Conditions of Contract (GCC), contractor shall also employ following Qualified Engineers during execution of the allotted work:
- One Qualified Graduate Engineer when cost of work to be executed is Rs. 200 lakh and above, and
- One Qualified Diploma Holder Engineer when cost of work to be executed is more than Rs. 25 lakh, but less than Rs. 200 lakh.
(B) Further, in case the contractor fails to employ the Qualified Engineer, as aforesaid in Para (A) above, he, in terms of provisions of Clause 26A.2 to the General Conditions of Contract, shall be liable to pay an amount of Rs. 40,000 and Rs. 25,000 for each month or part thereof for the default period for the provisions, as contained in Para A(a) and A(b) above respectively.
As per para 26 A.3 Part (II), No. of qualified Engineers required to be deployed by the Contractor for various activities contained in the works contract shall be specified in the tender documents as 'Special Condition of Contract' by the tender inviting authority." (As per GCC April 2022, Para 26-A, Page 56.
Restrictions on Arbitration Clauses. (As per IRGCC April 2022, Para 64 (I), Page 97).
Demand for Arbitration As per clause No 64, GCC part-II April 2022 corrected up-to date. Settlement of disputes-Indian railway Arbitration and Conciliation Rules:- As per clause No 63, GCC part-II April 2022 corrected up-to date.
These special conditions shall prevail over existing clauses 63 and 64 of General Conditions of Contract.
The provision of clause 63 & 64 to the General Conditions of Contract will be applicable only for the settlement of claims or disputes between the parties for values less than or equal to 20% of the value of the contract provisions of clause 63 & 64 and (ii)When the claim of disputes are of value more than 20% the value of the contract, other relevant clause of the General Conditions of Contract will not be applicable and arbitration will not be a remedy for settlement of such dispute. The above special conditions shall prevail over existing clause 63 of the General Conditions of Contract.
Guidelines for the Maintenance Period (As per IRGCC April 2022, Para 47, Page 82-83).
1) The tenderer/s shall be required to maintain the work effectively for a period of 06 Months. Maintenance period will commence from the date of completion as per Clause No.47 of the General Conditions of Contract. Security deposit will not be released until maintenance period is completed. For Zonal contracts, please see para below.
2) However, for a zonal work, the maintenance period shall be as under: As per Annexure-III, GCC part-I
- and
- April 2022 corrected up-to date.
- Repair and maintenance work including white/color washing: three calendar months from date of completion for each work-order.
- All new works except earth work: Six calendar months from date of completion for each work order.
3)To cover up monsoon period, the maintenance period will be extended in cases when required and contractor shall remain responsible for maintenance for this extended period also. The contractor shall make good and remedy at his own expense within such period as may be stipulated by the Engineer, any defect which may develop or may be before the expiry of this period and intimation of which has been sent to the contractor within seven days of the expiry of the said period by a letter, sent by hand delivery or by registered post. In case the contractor fails to make adequate arrangements to rectify the defects within seven days of the receipt of such notices, the Engineer without further notice may make his own arrangement to rectify the defects and the cost of such rectification shall be recovered from the Security Deposit of the contractor or from any other money due to the contractor under this or any other contract.
Special Condition for Tax Deduction:
(1) In respect of works, the contract value of which is more than Rs. 5,000/- each, a deduction of 2% on the taxable payment from each of the Contractor's bills shall be made in terms of section 194(C) of the Income Tax Act of 1961 & 1991. (From time to time TDS will also be deducted along with I. Tax as per extent rules).
(2) The Railway will deduct sales tax if leviable in a particular state where the work is going on, the gross amount of each bill while making payment to the contractor(s). The recovery shall be governed as per the guidelines & rates prescribed by the concerned State Government.
(3) Any Other taxes The Contractor shall bear in full all taxes and royalties levied by the State Government and/or Central Government from time to time. This would be entirely a matter between the contractor and State Government/or Central Government. Railway will recover the taxes and royalties through final bills if the contractor fails to pay the taxes and royalties to the Government.
Details of Inspection Register and Records to be maintained by Tenderer are as follows: 1)The Contractor/s shall maintain accurate records, plans and charts showing the dates and progress of all main operations and the Engineer shall have access to this information at all reasonable times. Records of tests made shall be handed over to the Engineer/s representative after carrying out the tests. The following registers will be maintained at site by the Contractor/s.
2)Site Order Register: The Contractor/s shall promptly acknowledge by putting his signature in the site order against any order given therein by the Engineer or his representative or his superior officers and comply with them. The Compliance shall be reported by the Contractor/s to the Engineer in good time so that it can be checked.
3)Labour Register: This register will be maintained to show daily strength of labour in different categories employed by the Contractor/s.
4) LOG book of events: All events are required to be chronologically logged in this book shift wise and date wise.
5) Cement & steel registers shall be maintained by the contractor.
Applicability of Price Variation as per IRGCC April 2022 clause 46A.
Applicability Price Variation Clause (PVC) shall be applicable only in tender having advertised value above Rs.2 Crores. Provided further that, in a contract where PVC is applicable, following shall be outside the purview of price adjustment (i.e. shall be excluded from the gross value of the work for the purpose of price variation). GCC April 2022 page 69 and Advance Correction Slip No.1(Rly. Board letter No.2022/CE- I/CT/GCC-2022/Policy date 14.07.2022).
Price Variation Clause for Annual Maintenance Contract or Zonal Contract :- The price variation Clause of General Conditions of Contract shall not apply to a works contract which is either an Annual Maintenance Contract or a Zonal Contract as per Railway Boards letter No.2013/CE/I/CT/O/10-PVC-Pt.I dtd.27.01.2015.
As per PCE/CCG Letter No. W 118/0 Vol. II (W6) date 14.06.2019 The security deposit against the contract shall be released only after the contractor has submitted the final PVC bill.
Disaster Management:
"All the available vehicles and equipment's of the contractor can be drafted by the Railway Administration in case of accidents/natural calamities involving human lives. The payment for such drafting shall be made according to the rates as shall be fixed by the Engineer. However, if the contractor is not satisfied with the decision of the Engineer in this respect he may appeal to the Chief Engineer within 30 Days of getting the decision of the Engineer, supported by analysis of the rates claimed. The Chief Engineer's decision after hearing both the parties in the matter would be final and binding on the contractor and the Railway".
Emergency Work:
In the event of any accident or failure occurring in the execution of work/ arising out of it which in the opinion of the Engineer requires immediate attention, the Railway may bring its own workmen or other agency/agencies to execute or partly execute the necessary work or carry out repairs if the Engineer-in-charge considers that the contractor(s) is/are not in a position to do so in time without giving any notice and charge the cost thereof, to be determined by the Engineer-in-charge, to the contractor.
Damage by Accident/ Flood/ Tides or Natural Calamities The Contractor shall take all precautions against damages from accidents, floods tides or other natural occurrences. He shall not be entitled to any compensation for his tools, plants, materials, machines and other equipment lost or damaged by any cause whatsoever. The Contractor shall be liable to make good the damage to any structure or part of a structure, plant or material of every description belonging to the Railway covered under the Contract, lost or damaged by him due to any cause during the course of execution of work. The Railway Administration will not be liable to pay the contractor any charge for rectification or repair to any damage which may have occurred from any cause what so ever.
Tender Credentials As per para no 11 of GCC April 2022 Part-I corrected up to date. Non-compliance with any of the conditions set forth therein above is liable to result in the tender being rejected clause no 12 Part-I of GCC April 2022 corrected up to date. (As per GCC April 2022, Para 11, Page 16-17).
Procedure for contractual payment after implementations of GST Act 2017 (Railway Board's letter no. 2017/CE-I/CT/4/GST dated 29/06/2017, Circulated by CE(Works) CCG vide Letter No. W118/0 VOL. IX (W6) dated 30.06.2017 for implementation of GST ACT' 2017).
Inclusion of LETTER OF CREDIT as mode of payment. In works tenders or service tenders invited by railways through E tendering on IREPS, having advertising value of Rs.10 lakhs and above (as per railway Bd's letter no 2018/CE-I/CT/9 dt 04/06/2018).
Specifications and Special Conditions for Supplying and utilizing Ordinary Portland Cement.
- The cement shall be procured in lots commensurate with the programmed progress of the work and shall be transported and stacked into IOW's godown at contractor's cost and from there the requirement for day to day use shall be drawn by the contractor against hand receipt. The cement shall not be directly taken to the site of work.
- Cement so procured by the Contractor shall be fresh conforming to IS 8112-1989 or latest IS cement code. After a receipt of each lot of at IOW's godown a sample of cement at the direction of Engineer shall be tested for initial / final setting time, compressive / Tensile strength at contractor's cost. Only on receipt of satisfactory certificates this cement shall be allowed to be used on works. The procurement of cement shall be panned by the contractor so that it does not effect the progress of works.
- The contractor shall have to submit the cash memo along with the lot of cement purchased from the various retailers / cement factory to IOW in taken proof of purchase of cement from reputed dealer. No cement shall be accepted by the IOW without cash memo.
- Although cement payment is in No. 50 Kg bags as per items total quantity so paid shall be limited to quantity actually used in works subject to further not exceeding the quantity laid down in works Hand book Part-III whichever is less. No payment shall be procured from authorized dealer / cement factory and the receipt shall be furnished on demand. All empty bags shall be taken away by the contractor after use of cement and cost of empty cement bags shall not form part of quoted rates against this items.
- The Railway will take responsible care of cement in their custody handed over by the contractor. However if the cement bags are damaged during storage while taking away for use in the work railway shall not be responsible for the same and no claim of payment shall be admissible on such damaged cement. However, contractor shall be allowed to take away this cement at his own cost.
- Cement consumption register shall be meticulously maintained giving quantity of work done / consumption of cement of each day.
- Cement bags left out after completion of work shall be taken by the contractor and the railway shall not make the payment against these bags.
Specifications of Steel Items Reinforcement Steel (TMT Bars) and Structural Steel. (A)All Reinforcement Steel (TMT Bars) and structural Steel shall be procured as per specifications mentioned in BIS's documents - IS : 1786 and IS : 2062 respectively. Independent tests shall be conducted, wherever required, to ensure that the materials procured conform to the specifications. (B)Steel shall be procured only from those firms, which are established, reliable, indigenous and Primary producers of steel, having integrated steel plants (ISP), using iron ore as the basic raw material and having in-house iron rolling facilities, following by production of liquid steel and crude steel, as per Ministry of Steel's guidelines. e.g. "SAIL/TISCO/JINDAL/RINL/ESSAR/IISCO". (C)However, only certain isolated sections of structural steel, not being rolled by ISPs, can be procured from the authorized re-rollers of ISPs or authorized licensee of BIS having traceability system and who use billets produced by ISPs. (D)The steel procured shall be reasonably free from cracks, surface flaws, laminations, rough and imperfect edges and all other harmful defects. Steel sections, shall be free from excessive rust, scaling and pitting and shall be will protected. The decision of the Engineer regarding rejecting any steel section on account of any of the above defects shall be final and binding. (E)Structural steel work shall conform to the requirement as specified in Indian Railway Unified Standard Specifications (Works and Materials) Vol. I & II . (F)Necessary purchase bill along with test certificate for steel shall be obtained and submitted to the Engineer in Charge. Steel without the test certificate from approved laboratory/ Engineering College shall not be used in the work. Certified copy of the same shall be submitted to Divisional Office along with running bills/final bills. Steel shall be tested for Tensile strength and bend test as per IS : 1599 as specified in Indian Railway Unified Standard Specifications (Works and Materials) Vol. I & II. (G)Quantity for this item shall be calculated as per nominal weight of steel section for the actually used in the work. No payment will be made for the wastage and the contractor will be allowed to take away the scrap and excess steel away from site. (H)The contractor shall be responsible for getting the measurement of steel entered in to steel register and signed by the Engineer in charge of the work before concreting is done to avoid dispute regarding quantity of steel used in the work. (I)The rates quoted for this item is deemed to be inclusive of the cost of binding wire and no separate payment shall be admissible for the same. (J)The steel shall be kept by the contractor under his custody at the site of work and Railway will not be responsible for any theft thereof. (K) The quantity so payable under relevant item shall be restricted to the quantity as per approved plan/drawing and decision of the Engineer in Charge in this regard shall be final and binding upon the contractor.
Special condition for the work attached in documents.
17B Extension of Time with Liquidated Damages (LD) for delay due to Contractor: The time for the execution of the work or part of the works specified in the contract documents shall be deemed to be the essence of the contract and the works must be completed not later than the date(s) as specified in the contract. If the Contractor fails to complete the works within the time as specified in the contract for the reasons other than the reasons specified in Clause 17 and 17A, the Railway may, if satisfied that the works can be completed by the Contractor within reasonable short time thereafter, allow the Contractor for further extension of time (Proforma at Annexure-VII) as the Engineer may decide. On such extension the Railway will be entitled without prejudice to any other right and remedy available on that behalf, to recover from the Contractor as agreed damages and not by way of penalty for each week or part of the week, a sum calculated at the rate of Liquidated Damages as decided by Engineer, between 0.05% to 0.30% of contract value of the works for each week or part of the week. [ACS No.01 of dated 14.07.2022]
The said letter is attached for reference.
Technical-Compliances
Restrictions on the Employment of Retired Engineers of Railway Services Within One Year of their Retirement: As per IRGCC April 2022, Para 59.9, Page - 91.
Performance Bank Guarantee As per Clause No. 16.(4) of GCC Part-I, April 2022 corrected up to date. (As per GCC -April 2022, Para 16.(4), Page 48-49) Performa Attached.
The tenderer shall be required to submit the Bid Security with the tender as per Para-5, Part-I of IRSGCC April 2022 corrected up to date.
Joint Venture Firms shall be applicable to the works tenders of value more than Rs.10.00 Crore.
All the members of JV shall certify that they are not black listed or debarred by Railways or any other Ministry/ Department/ /PSU (Public Sector undertaking) of the Govt. of India/ State Govt. from participation in tenders / contract on the date of opening of bids either in their individual capacity or as a member of the JV firm in which they were / are members.
Bidder declarations (12)
Undertakings
I/ We have visited the works site and I / We am / are aware of the site conditions.
I/We have read all the various condition to tender attached and also here by agree to abide by the general condition of contract and to carry out the work according to the special conditions of contract and specifications of materials and work as laid down by Railway.
I/we the tenderer (s) am/are signing this document after carefully reading the contents.
I/We the tenderer(s) also accept all the conditions of the tender and have signed all the pages in confirmation thereof.
I/we hereby declare that I/we have downloaded the tender documents from Indian Railway website www.ireps.gov.in . I/we have verified the content of the document from the website and there is no addition, no deletion or no alteration to the content of the tender document. In case of any discrepancy noticed at any stage i.e. evaluation of tenders, execution of work or final payment of the contract, the master copy available with the railway Administration shall be final and binding upon me/us.
I/we declare and certify that I/we have not made any misleading or false representation in the forms, statements and attachments in proof of the qualification requirements.
I/We also understand that my/our offer will be evaluated based on the documents/credentials submitted along with the offer and same shall be binding upon me/us.
I/We declare that the information and documents submitted along with the tender by me/us are correct and I/we are fully responsible for the correctness of the information and documents, submitted by us.
I/we certify that I/we the tenderer(s) is/are not blacklisted or debarred by Railways or any other Ministry / Department of Govt. of India from participation in tender on the date of submission of bids, either in individual capacity or as a HUF/ member of the partnership firm/LLP/JV/Society/Trust.
I/we understand that if the contents of the certificate submitted by us are found to be forged/false at any time during process for evaluation of tenders, it shall lead to forfeiture of the Bid Security and may also lead to any other action provided in the contract including banning of business for a period of upto two year. Further, I/we and all my/our constituents understand that my/our offer shall be summarily rejected.
I/we also understand that if the contents of the certificate submitted by us are found to be false/forged at any time after the award of the contract, it will lead to termination of the contract, along with forfeiture of Bid Security/Security Deposit and Performance guarantee and may also lead to any other action provided in the contract including banning of business for a period of upto two year.
I/We have read the clause regarding restriction on procurement from a bidder of a country which shares a land border with India and certify that I am/We are not from such a country or, if from such a country, have been registered with the competent Authority. I/We hereby certify that I/we fulfil all the requirements in this regard and am/are eligible to be considered (evidence of valid registration by the competent authority is enclosed)
Fees & money
- EMD
- ₹2 L
- Tender fee
- None
Important dates
- Published
- 6 Oct 2026, 6:07 pm IST
- Bidding starts
- 15 Oct 2026
- Closes
- 29 Oct 2026, 3:00 pm IST
Similar open tenders
- Rajkot Division: Improvement to various facilities at Railway Hospital Rajkot and develop…Ministry of Railways · Closes 19 Oct 2026
- Electrical TRD work in connection with Various Engineering Track related work in jurisdic…Ministry of Railways · Closes 21 Oct 2026
- Electrical TRD work in connection with Various Engineering Track related work in jurisdic…Ministry of Railways · Closes 23 Oct 2026
- (a) Rajkot Division: Providing of MEA (PA system, Cover shed, Water Taps) at various stat…Ministry of Railways · Closes 26 Oct 2026
- OHE related work during interlocking of 19 nos. LC Gates in various sections of IZN Divis…Ministry of Railways · Closes 22 Oct 2026
- TRD modification work in c/w Engineering Track related works (TBR, TRR and Extension of b…Ministry of Railways · Closes 13 Oct 2026
- Rajkot Division : Removal/Disposal of Excavated muck / malba / similar unserviceable or w…Ministry of Railways · Closes 12 Oct 2026
- Provision of various accessories and reliability improvement works for VHF equipments/ sy…Ministry of Railways · Closes 23 Oct 2026
Search similar in the explorerFind this tender in the explorer