Browse all bids
eProcureOpenWorks

TPJ Division -Extension of Shunting necks at BG complex at Tiruchchirappalli Junction- Electrical Traction Arrangements

Ministry of Railways

Senior Divisional Electrical Engineer Electrical Branch, Southern Railway,Tiruchchirappalli Tiruchchirappalli

Delivers to

Chennai

Overview

22 facts from the tender

Ministry of Railways published this works tender on eProcure on 6 Oct 2026, for Chennai. The estimated value is ₹22.5 L and the EMD is ₹45,100. It closes on 2 Nov 2026, 3:00 pm IST. Tender ID 92576703 · Ref TPJ-TRD-2026-2027-19.

Timeline

  1. Published6 Oct 2026 · 6:16 pm
  2. Closes2 Nov 2026 · 3:00 pm

Bidding

Bid type
Open/Advertised
Contract type
Works - General · Expenditure
Tender type
Open
Tendering section
TRD
Bidding system
Single Packet System
Bidding style
[ Decision at Schedule level ]
Validity of offer
84 days
Completion period
6 Months
Tender document cost
None
JV / consortium
Not allowed
Ranking order
Lowest to Highest
Expenditure type
Capital (Works)
Pre-bid meeting
None

Buyer

Inviting authority
TRICHCHIRAPPALLI DIVISION-ELECTRICAL/SOUTHERN RLY
Organisation type
Central Govt. Ministry/Department
Product category
Railway related Products
Location
Chennai
Portal
eProcure
Inviting officer
Sr.DEE/TRD/TPJTRICHCHIRAPPALLI DIVISION-ELECTRICAL/SOUTHERN RLY

Important dates

Published
6 Oct 2026, 6:16 pm IST
Bidding starts
19 Oct 2026
Closes
2 Nov 2026, 3:00 pm IST

Declarations by the buyer

  • Complies with the Public Procurement (Make in India) Order 2017
  • The tender inviting authority confirms this tender does not violate the GFR rules on procurement through GeM

Schedule of work

42 items
ItemQuantityRailways’ estimated rateAmount
Schedule SW1 · OHE Items : Schedule -1 - Section-1 of CORE SOR-2025 : General
01Preparation o f designs and drawings for overhead equipment and verification of purchaser's pegging plan.5 Per Track KM₹23,562₹1,17,810
02Marking/Painting of temperature & 'Y'- Measurement of ONE mast atBWA locations.1 Each₹180₹180
03Supply without insulator and erection of material fortermination of Single conductor of Over Head Equipment orterminating wire.- supply only2 Each₹5,234₹10,468
04Supply without insulator and erection of material fortermination of Single conductor of Over Head Equipment orterminating wire.-Erection Only2 Each₹1,445₹2,890
05Supply without insulator and erection of materials for termination oftramway type OHE (Regulated)-supply only2 Each₹3,913₹7,826
06Supply without insulator and erection of materials for termination oftramway type OHE (Regulated)-Erection Only2 Each₹1,445₹2,890
07Supply without Insulator and erection of cut-in (9-Tonne) Insulator - supply only2 Each₹1,627₹3,254
08Supply without Insulator and erection of cut-in (9-Tonne) Insulator - Erection only2 Each₹1,017₹2,034
09Transfer of equipment from one mast or support another - supply only5 Each₹2,302₹11,510
10Transfer of equipment from one mast or support another - Erection only5 Each₹4,319₹21,595
11Unloading of all types of Steel Structures.8 MT₹235₹1,880
12Loading of all types of Steel Structures.8 MT₹372₹2,976
13Unloading of all types of Copper & Aluminium conductors.1.50 MT₹179₹268.50
14Loading of all types of Copper & Aluminium conductors.1.50 MT₹179₹268.50
Schedule SW2 · OHE Items : Schedule -1 - Section-2 of CORE SOR-2025 - Concrete
01Concrete for foundation and plinth In other than hard soil and rock - supply only81 cum₹6,227₹5,04,387
02Concrete for foundation and plinth In other than hard soil and rock - Erection only81 cum₹2,339₹1,89,459
Schedule SW3 · OHE Items : Schedule -1- Section-3 of CORE SOR-2025 - Ferrous
01Supply and erection of Structure steel (traction masts) fabricated andgalvanised of all Type : B-Series Mast - supply only8 MT₹97,468₹7,79,744
02Supply and erection of Structure steel (traction masts) fabricated andgalvanised of all Type : B-Series Mast - Erection only8 MT₹3,393₹27,144
03Supply and erection of a Guy Rod Assembly - supply only2 Each₹8,497₹16,994
04Supply and erection of a Guy Rod Assembly - Erection only2 Each₹1,731₹3,462
05Supply and erection of 25kV Caution Board /PIate.-Supply Only15 Each₹374₹5,610
06Supply and erection of 25kV Caution Board /PIate.-Erection Only15 Each₹139₹2,085
07Supply without Insulator and erection of Single bracket assemblysuitable for tramway type OHE (Regulated)-supply only15 Each₹9,258₹1,38,870
08Supply without Insulator and erection of Single bracket assemblysuitable for tramway type OHE (Regulated)-Erection Only15 Each₹1,389₹20,835
09Supply and erection of Regulating Equipment (3-Pulley type) withcounter weight assembly for tramway type OHE (Regulated)-Supply only1 Each₹52,667₹52,667
10Supply and erection of Regulating Equipment (3-Pulley type) withcounter weight assembly for tramway type OHE (Regulated)-Erection only1 Each₹4,955₹4,955
11Supply and erection of a structure bond - supply only15 Each₹812₹12,180
12Supply and erection of a structure bond - Erection only15 Each₹424₹6,360
13Supply and erection of a longitudinal bond - supply only10 Each₹477₹4,770
14Supply and erection of a longitudinal bond - Erection only10 Each₹382₹3,820
15Supply & erection of a transverse and special bond - supply only5 Each₹1,041₹5,205
16Supply & erection of a transverse and special bond - Erection only5 Each₹455₹2,275
Schedule SW4 · OHE Items : Schedule-1 - Section-4 of CORE SOR-2025 - Non- Ferrous
01Supply and Erection of contact wire only (Regulatedwith bridle wire)-supply only0.75 Kilometre₹74,762₹56,071.50
02Supply and Erection of contact wire only (Regulatedwith bridle wire)-Erection Only0.75 Kilometre₹31,095₹23,321.25
03Supply & erection of large copper jumpers-Supply only2 Each₹7,801₹15,602
04Supply & erection of large copper jumpers-Erection only2 Each₹589₹1,178
Schedule SW5 · OHE Items : Schedule-1 - Section-5 of CORE SOR-2025 - Insulator
01Supply of Insulators for items 4(a)(i) & 4(a)(iii)Stay Arm Porcelain (CD-1050 mm)15 Each₹4,311₹64,665
02Supply of Insulators for items 4(a)(i) & 4(a)(iii)Bracket Porcelain (CD-1050 mm)15 Each₹4,136₹62,040
03Supply of 9-Tonne insulators for items 8(b)(i), (ii), (iii), (vi), (vii), (viii) & (ix)Porcelain (CD-1050 mm)4 Each₹5,673₹22,692
Schedule SW6 · NON-SOR Items
01Hiring of stone demolition machine using tractor compressor breaker for breaking hard concrete foundation / Rocks & StonesBids quote a rate in rupees for each item15 Hour₹1,000₹15,000
02Transporting of OHE structures/ Mast /Materials /equipment to the workspotsBids quote a rate in rupees for each item100 MT-Km₹138.61₹13,861
03Dismantlement of OHE mast / structure by cuttingBids quote a rate in rupees for each item2 Each₹6,014.86₹12,029.72
Total₹22,53,132.47

Bids quote a percentage above, below or at par with these rates · The total matches the advertised value.

Documents

10 files

Documents to submit

Commercial-Compliance

  • If the work executed by the firm, either during the execution stage or at the completion stage, is found to be unsatisfactory by the Field In-charge or by Sr. DEE/TRD/TPJ, Sr. DEE/TRD/TPJ shall have the right to impose a penalty of up to maximum extend of 10% of the Bill value.

    Document optional
  • PAYMENT OF BID SECURITY (EMD) The Bid Security shall be deposited either in cash through e-payment gateway or submitted as Bank Guarantee bond (BG) from a scheduled commercial bank of India or as mentioned in tender document. The BG shall be valid for a period of 90 days beyond the bid validity period. The BG for the value of Bid Security mentioned in tender document, shall be drawn in favour of "Senior Divisional Finance Manager, DRM office, Southern Railway, Tiruchchirappalli", on account of the contractor and the original Bank Guarantee should be delivered in person to "The Senior Divisional Electrical Engineer (Traction Distribution branch), DRM office, Southern Railway, Tiruchchirappalli", before closing date for submission of bids, excluding the last date of submission of bids. Scanned copy of Bank Guarantee submitted for Bid Security shall be uploaded. It is mandatory to upload the copy of BG if it is chosen to submit the Bid Security in the form of Bank Guarantee. Non submission of scanned copy of Bank Guarantee with the bid on e-tendering portal (IREPS) and/or non- Submission of original Bank Guarantee within the specified period shall lead to summary rejection of bid.

    Document optional
  • PAN COPY Copy of PAN Card shall be uploaded.

    Document required
  • GST REGISTRATION CERTIFICATE Copy of GST Registration Certificate shall be uploaded.

    Document required
  • NEFT MANDATE :Bank official certified, filled-in copy of 'Electronic Fund Transfer Mandate form' (NEFT Form) containing tenderer's bank account details such as Name of the Bank, Bank Branch Code, Account Number, IFSC Code, etc., shall be uploaded. ( Click here to download Format)

    Document required
  • CERTIFICATE OF TRUTHFULNESS A copy of certificate stating that all their statements / documents submitted along with bid are true and factual. Standard format of certificate to be submitted by the bidder is enclosed as Appendix-V. In Addition to Appendix-A, in case of other than Company / Proprietary firm, Appendix-VA shall also be submitted by each member of a partnership firm / Joint Venture (JV) / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc. as the case may be. Non submission of above certificate(s) by the bidder shall result in summarily rejection of his / their bid. ( Click here to download Format)

    Document required
Show all 21
  • ASSOCIATION WITH RETIRED RAILWAY EMPLOYEE The Contractor shall abide by the instructions contained in the Clause No.16 of Annexure I of Part I and Clause No. 59(9) of Part II of Indian Railways Standard General Conditions of Contract, April 2022. In this connection, the contractor shall clearly furnish the details of employment / partnership, etc., of retired Railway employees, if any. In case of no retired railway employee associated with the firm, a statement as per the sample format at Annexure - C. ( Click here to download Format)

    Document required
  • CONSTITUTION OF THE TENDERER'S FIRM The tenderer shall clearly specify whether the tender is submitted on his own (proprietary firm) or on behalf of a partnership Firm / Company / Joint Venture(JV) / Registered Society / Registered Trust / HUF / LLP etc. Based on their constitution of the firm, they must submit the mandatory documents mentioned hereunder, as applicable and if same is not submitted the offer will be summarily rejected. The tenderer(s) shall enclose the attested copies of constitution of their concern, and copy of PAN card along with their tender. Tender Documents in such cases are to be signed by such persons as may be legally competent to sign them on behalf of the Firm, Company, Association, Trust or Society, as the case may be.

    Document required
  • a)If the tenderer is a Sole Proprietorship Firm, they shall submit the notarized copy of an affidavit in this regard along with copy of their Pan card and they shall submit all the relevant documents in terms of Para 10 of the Tender Form (Second Sheet) of GCC. ( Click here to download Format)

    Document required
  • b)If the tenderer is a Hindu Undivided Family (HUF), they shall submit a copy of notarized affidavit on Stamp Paper declaring that he who is submitting the tender on behalf of HUF is in the position of 'Karta' of Hindu Undivided Family (HUF) and he has the authority, power and consent given by other members to act on behalf of HUF.

    Document optional
  • c)If the tenderer is a Partnership Firm, they shall submit

    1. a notarized copy of the Partnership Deed or a copy of the Partnership deed registered with the Registrar,
    2. a notarized or registered copy of Power of Attorney in favour of the individual to tender for the work, sign the agreement etc. and create liability against the firm,
    3. an undertaking by all partners of the partnership firm that they are not blacklisted or debarred by Railways or any other Ministry / Department of the Govt, of India from participation in tenders / contracts as on the date of submission of bids, either in their individual capacity or in any firm / LLP in which they were / are partners / members. Any Concealment / wrong information in regard to above shall make the bid ineligible or the contract shall be determined under Clause 62 of the Standard General Conditions of Contract and
    4. all documents as mentioned in para 18 of the Tender Form (Second Sheet) of GCC.
    Document optional
  • d) If the tenderer is a Joint Venture (JV) - (If Applicable), they shall submit all the relevant documents as mentioned in para 17 of the Tender Form (Second Sheet) of GCC. (A tender from JV shall be considered only where permissible as per the tender conditions)

    Document optional
  • e)If the tenderer is a Company registered under Companies Act 2013, they shall submit

    1. the copies of MOA (Memorandum of Association) and AOA (Articles of Association) of the company,
    2. a copy of Certificate of Incorporation and
    3. a copy of Authorization / Power of Attorney issued by the Company (backed by the resolution of Board of Directors) in favour of the individual to sign the tender on behalf of the company and create liability against the company and
    4. all the other relevant documents mentioned in the Para 10 of the Tender Form (Second Sheet) of GCC.
    Document optional
    1. If the tenderer is a LLP (Limited Liability Partnership), they shall submit
      1. a copy of LLP Agreement,
      2. a copy of Certificate of Incorporation,
      3. a copy of Power of Attorney / Authorization issued by the LLP in favour of the individual to sign the tender on behalf of the LLP and create liability against the LLP,
      4. an undertaking by all partners of the LLP that they are not blacklisted or debarred by Railways or any other Ministry / Department of the Government of India from participation in tenders / contracts as on the date of submission of bids, either in their individual capacity or in any firm / LLP or JV in which they were / are partners/members. Concealment / wrong information in regard to above shall make the contract liable for determination under Clause 62 of the Standard General Conditions of Contract and
      5. all other relevant documents in terms of Para 10 of the Tender Form (Second Sheet) of GCC.
    2. If the tenderer is a Registered Society & Registered Trust, they shall submit
    3. a copy of Certificate of Registration,
      1. a copy of Memorandum of Association of Society/Trust Deed,
      2. a copy of Power of Attorney in favour of the individual to sign the tender documents and create liability against the Society/Trust,
      3. a copy of Rules & Regulations of the Society and
      4. all other relevant documents in terms of Para 10 of the Tender Form (Second Sheet) of GCC.
    Document optional
  • POWER OF ATTORNEY The tenderer whether sole proprietor / a company or a partnership firm / joint venture (JV) / registered society / registered trust / HUF / LLP etc if they want to act through agent or individual partner(s), should submit along with the tender, a copy of power of attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he/they be partner(s) of the firm or any other person, specifically authorizing him/them to sign the tender, submit the tender and further to deal with the Tender/ Contract up to the stage of signing the agreement except in case where such specific person is authorized for above purposes through a provision made in the partnership deed / Memorandum of Understanding / Article of Association/Board resolution, failing which tender shall be summarily rejected.

    Document optional
  • INSTRUCTIONS REGARDING LC - PART 1 :

    1. For all the tenders having advertised cost of Rs. 10 lakh or above, the contractor shall have the option to take payment from Railways through a letter of credit (LC) arrangement.
    2. This option of taking payment through LC arrangement has to be exercised in IREPS (Indian Railway Electronic Procurement System - the e- application on which tenders are called by Railways) by the tenderer at the time of bidding itself, and the tenderer shall affirm having read over and agreed to the terms and conditions of the LC option.
    3. The option so exercised, shall be an integral part of the bidder's offer.
    4. The above option of taking payment through LC arrangement, once exercised by tenderer at the time of bidding, shall be final and no change shall be permitted, thereafter, during execution of contract.
    5. In case tenderer opts for payment through LC, following shall be the procedure to deal release of payment through LC:
      1. The LC shall be a sight LC.
      2. The contractor shall select his Advising/Negotiating bank for LC. The incidental cost towards issue of LC and its operation thereof shall be borne by the contractor.
      3. SBI, New Delhi, Main Branch will be the nodal branch for issue of LCs based on onlinerequests received from Railway Accounts Units for tenders opened in financial year 2018-19. SBI branches where the respective Railway Accounts Office has its Account (local SBI branch) will be the issuance/reimbursing branch for LC issued under this arrangement. The Bank shall remain same for this tender till completion of contract. The incidental cost @ 0.15 % per annum of LC value, towards issue of LC and operation thereof shall be borne by the contractor and shall be recovered from his bills.
      4. The LC shall be opened initially for duration of 180 to 365 days in consultation with contractor. The LC shall be extended time to time as per the progress of the contract, on the request of the contractor. The value of LC to be opened initially as well as extended thereafter shall be finalised by the engineer in consultation with the contractor on the basis of expected progress of work.
      5. The LC terms and conditions shall inter-alia indemnify and save harmless the Railway from and against all losses, claims and demands of every nature and description brought or recovered against the Railways by reason of any act or omission of the contractor, his agents or employees, in relation to the Letter of Credit (LC). All sums payable/borne by Railways on this account shall be considered as reasonable compensation and paid by contractor. INSTRUCTIONS REGARDING LC - PART 2 :
      6. The LC terms and conditions shall inter-alia provide that Railways will issue a Document of Authorisation after passing the bill for completed work, to enable contractor to claim the authorized amount from their bank.
      7. The acceptable, agreed upon document for payments to be released under the LC shall be the Document of Authorisation.
      8. The Document of Authorisation shall be issued by Railway Accounts Office against each bill passed by Railways.
      9. On issuance of Document of Authorisation, a copy of Document of Authorisation shall be posted on IREPS for download by the contractor. A digitally signed copy of Document of Authorisation shall also be sent by Railway Accounts Office to Railway's bank (Local SBI Branch).
      10. The contractor shall take print out of the Document of Authorisation available on IREPS and present his claim to his bank (advising Bank) for necessary payments as per LC terms and conditions. The claim shall comprise of copy of Document of Authorisation, Bill of Exchange and Bill.
      11. The payment against LC shall be subject to verification from Railway's Bank (Local SBI Branch).
      12. The contractor's bank (advising bank) shall submit the documents to the Railways Bank (Local SBI Branch0.
      13. The Railway's bank (issuing bank) shall, after verifying the claim so received w.r.t. the digitally signed Document of Authorisation received from Railway Accounts Office, release the payment to contractor's bank (advising bank) for crediting the same to contractor's account.
      14. Any number of bills can be dealt within one LC, provided the sum total of payments to contractor is within the amount for which LC has been opened.
      15. The LC shall shall be closed after the release of final payment including PVC amount, if any, to the contractor.
      16. The release of performance guarantee or security deposit shall be dealt directly by Railway with the contractor i.e., not through LC.
    Document optional
  • PAYMENT OF TENDER DOCUMENT COST The tenderer shall deposit the Tender Document Cost (If applicable) as stipulated in the tender document, ONLY through online modes as permitted in IREPS application.

    Document optional
  • Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.

    Document optional

Technical-Compliances

  • MATERIAL FROM APPROVED SOURCES All the materials / equipments / fittings / components required for the successful completion of the work shall be procured only from RDSO / CORE approved sources. If for any item, no RDSO/CORE approved sources are available, the said item conforming to relevant RDSO specification/drawing shall be procured from other sources.

    Document optional
  • Tender credentials-All the required / supporting documents should be scanned and uploaded ( Click here to download Format)

    Document required
  • The contractor should have a valid ElectricalContract License for working in HT/EHT systems,having system voltage equal to or more than 25kV, from the concerned statutory authority of anyStates of India. It must be ensured that the validityof electrical license should be valid during theentire contract period, duly renewing atappropriate time. The tenderer should submit acopy of license along with his offer. During offersubmission, in case the validity of the Electricallicense is expired, the copy of the license renewalapplication submitted to the concerned statutoryauthority shall be submitted along with the copy ofthe expired license and it will be considered foracceptance. However, if the contractor is havingexperience in Railway's 25KV OHE or PSI works(based on their submissions), his / her offer will beconsidered for acceptance based on a declarationstating that the license copy will be submittedbefore the start of the work and such declarationshall be uploaded in the required in place in IREPS.Such contractor shall avail and submit Electricallicense copy before start of the work and theagreement will be signed only on receipt of copy ofElectrical license. The electrical license should bein the name of the firm or in the name of anyauthorized person of the tenderer's firm or if thetenderer is hiring an Electrical licensee forsupervising / overseeing this work, the copy of hisElectrical license along with an authorization letterfor supervising / overseeing this work under hislicense shall be submitted.

    Document required

Commercial conditions

EMD
₹45,100
Tender fee
None

Terms & conditions

18 conditions

Commercial-Compliance

  • RATES ARE ALL INCLUSIVE All rates quoted by the tenderer for this work tenders shall be deemed to be inclusive of all taxes, duties, royalties, octroi, cess etc. payable by the contractor to the Govt. or any public body and no additional amount / rate or claim will be entertained on this account by the Railways. Also no claim whatsoever will be accepted by Railways on account of revision of tax rates, new taxes of statutory nature by State/Central Govt, unless otherwise any specific instruction from the statutory authorities as per extant rules.

  • MUTUALLY BINDING If the tenderer's offer is accepted, until the formal agreement is executed, acceptance of this tender shall constitute a binding contract between Railways and the tenderer / contractor, subject to modifications, as may be mutually agreed to between Railways and the tenderer / contractor and it will be indicated in the letter of acceptance of the tenderer / contractor's offer for this work.

  • ABIDANCE WITH GCC & ALL CONDITIONS I / We also hereby agree to abide by the Indian Railways Standard General Conditions Of Contract, with all correction slips up-to-date and to carry out the work according to the Special Conditions of Contract and Specifications of materials and works as laid down by Railway in the annexed Special Conditions of contract , General Instructions and conditions, explanatory notes for schedule of work and all the Annexures.

  • OFFER VALIDITY I/We agree to keep this offer open for acceptance, during offer validity period as mentioned in the tender document, from the date of tender opening and in default thereof I/We will be liable for forfeiture of my/our Earnest Money. I/We offer to do the work for Railway, at the rates quoted in the attached Schedule and hereby bind myself/ourselves to complete the works in all respects.

  • RIGHTS OF RAILWAYS TO INCLUDE CONDITIONS :Railways shall have the right to incorporate any such condition quoted by tenderer, in the contract, at Railway's discretion, if contract is placed on the tenderer.

  • TENDERER TO READ ALL CONDITIONS I/We have read the various conditions attached/ referred to in this tender document, and agree to abide by the said conditions.

  • I/We hereby Confirm that the rates, rebates and/or other financial terms, if any, quoted by us in the relevant fields of the Financial Bid page will only be the ruling terms for deciding the inter-se ranking, and any such condition having financial repercussions, if quoted by us anywhere else including attached documents shall not be considered for deciding inter-se ranking

General Instructions

  • Before quoting the rates for schedule items, the Schedule shall be read in conjunction with its explanatory notes for detailed description of various items included therein.

  • Indian Railways Standard General Conditions of Contract, GCC, April 2022, including all it's correction slips, upto date is applicable for this contract.

  • Provision of the GST Act is effective across the country from 1st July, 2017. Hence, this contract would be subjected to GST Act & Rules as applicable from time to time.

Show all 18
  • I f the Tenderer (s) deliberately give(s) wrong information/incorrect documents in his/their tender o r create circumstances for the acceptance of his/their tender , the Railway reserves the right to reject such tender at any stage. The entire EMD and any other dues available with Railway against that contract will be forfeited. Action will b e taken t o suspend the business with the tenderer for a period of one year . In addition, Administration reserves the right to prosecute the tenderer under suitable law.

  • All terms and conditions in the tender documents are binding on the Tenderers.

  • Railways reserves the right t o accept o r reject any or all the tenders and to award t h e work i n whole o r i n part without assigning the reason for any such action.

  • The Tenderers are advised to visit the site of work in their own interest and acquaint themselves with the site conditions and expected quantum o f work and assess all the site specific difficulties to be experienced while executing the same and the rate shall be arrived duly considering all the facts above and quoted in the tender. Any representation at a later date specifying the site difficulties shall not be considered.

  • T h e tenderer shall go through the entire tender documents thoroughly and strictly adhere the instructions and directions given at different pages.

  • Tender Document Cost once paid is non-refundable.

  • Unreleased EMD of any tenderers, if any, held with the Railway Administration, shall not be adjusted towards the EMD to be remitted.

  • Contractors are allowed TO make payments against this tender towards tender document cost (if applicable) ONLY through ONLINE payment modes available in IREPS portal, LIKE net banking, debit card, credit card etc. MANUAL payments through Demand draft, Banker cheque, Deposit receipts, FDR etc. are NOT allowed.

Bidder declarations (2)

Undertakings

  • I/We have visited the works site and I/We am/are aware of the site conditions.

  • The tenderer / contractor shall note that the benefit of subsidy, if any, should be passed on to Railway. Hence, if subsidy is available, while quoting the rate, the same shall be taken into account and indicate the amount of subsidy considered separately. If no subsidy is available, the same may also be indicated.

Similar open tenders

Soonest first

Search similar in the explorerFind this tender in the explorer

Tender notice (PDF)