Electrical (TRD) work in connection with construction of machine siding at 8 stations -BGND,BDLN, SRPN, SPTR, SMCP,LMY,MZS and NMGY Station
Ministry of Railways
Divisional Railway Manager s office Electrical Department Tinsukia
Delivers to
Guwahati
Overview
22 facts from the tenderMinistry of Railways published this works tender on eProcure on 7 Oct 2026, for Guwahati. The estimated value is ₹69.6 L and the EMD is ₹1.4 L. It closes on 30 Oct 2026, 1:00 pm IST. Tender ID 92578277 · Ref LV-T-14-TSK-TRD-10-R4.
Timeline
- Published7 Oct 2026 · 4:25 pm
- Bidding startsin 5d 13h16 Oct 2026
- Closes30 Oct 2026 · 1:00 pm
Bidding
- Bid type
- Open/Advertised
- Contract type
- Works - General · Expenditure
- Tender type
- Open
- Tendering section
- TRD SECTIO
- Bidding system
- Single Packet System
- Bidding style
- Single Rate for Tender
- Validity of offer
- 60 days
- Completion period
- 12 Months
- Tender document cost
- None
- JV / consortium
- Not allowed
- Ranking order
- Lowest to Highest
- Expenditure type
- Capital (Works)
- Pre-bid meeting
- None
Buyer
- Inviting authority
- TINSUKIA DIVISION-ELECTRICAL/N F RLY
- Organisation type
- Central Govt. Ministry/Department
- Product category
- Railway related Products
- Location
- Guwahati
- Portal
- eProcure
- Inviting officer
- Divisional Railway Manager-ElectTINSUKIA DIVISION-ELECTRICAL/N F RLY
Important dates
- Published
- 7 Oct 2026, 4:25 pm IST
- Bidding starts
- 16 Oct 2026
- Closes
- 30 Oct 2026, 1:00 pm IST
Declarations by the buyer
- Complies with the Public Procurement (Make in India) Order 2017
- The tender inviting authority confirms this tender does not violate the GFR rules on procurement through GeM
- Bidders from a country sharing a land border with India must be registered with the competent authority
Schedule of work
59 items| Item | Quantity | Railways’ estimated rate | Amount |
|---|---|---|---|
| Schedule A · Supply & Erection of Items required for Electrical (TRD) work | |||
| 001Supply of materials for termination of double overhead equipment conductor (excluding 9 Tonne | 8 Numbers | ₹7,985.06 | ₹63,880.48 |
| 002Erection of materials for termination of double overhead equipment conductor (excluding 9 Tonne | 8 Numbers | ₹1,098.97 | ₹8,791.76 |
| 003Supply of Porcelain type 9 tonne insulator | 8 Numbers | ₹4,114.51 | ₹32,916.08 |
| 004Providing and Laying of Concrete for foundation and plinth in all types of Soils and Soft Rock using M10 grade concrete for main foundation and M-15 grade concrete for grouting and muffing including nominal reinforcement wherever required as per RDSO drawings | 120 cum | ₹8,403.73 | ₹10,08,447.60 |
| 005Supply of all Rolled/Fabricated mast, portal & TTC for OHE. | 13.56 MT | ₹1,28,144.81 | ₹17,37,643.62 |
| 006Erection of all Rolled/Fabricated mast, portal & TTC for conventional OHE. | 13.56 MT | ₹10,513.06 | ₹1,42,557.09 |
| 007Supply of Fabricated steel work, DA, SPS etc. | 4.80 MT | ₹1,28,806.54 | ₹6,18,271.39 |
| 008Erection of Fabricated steel work, DA, SPS etc. | 4.80 MT | ₹11,176.02 | ₹53,644.90 |
| 009Supply of Longitudinal bond (including black painted MS Flat and required nut, bolts spring washer | 40 Numbers | ₹532.10 | ₹21,284 |
| 010Erection of Longitudinal bond (including black painted MS Flat and required nut, bolts spring washer | 40 Numbers | ₹429.55 | ₹17,182 |
| 011Supply of Structure bond (including black painted MS Flat and required nut, bolts spring washer | 50 Numbers | ₹854.77 | ₹42,738.50 |
| 012Erection of Structure bond (including black painted MS Flat and required nut, bolts spring washer | 50 Numbers | ₹373.06 | ₹18,653 |
| 013Supply of Cross/ transverse bond (including black painted MS Flat and required nut, bolts spring washer) | 20 Numbers | ₹843.82 | ₹16,876.40 |
| 014Erection of Cross/ transverse bond (including black painted MS Flat and required nut, bolts spring washer) | 20 Numbers | ₹546.81 | ₹10,936.20 |
| 015Supply of single bracket assembly with accessories and stay & bracket insulator Porcelain type | 40 Each | ₹28,083.10 | ₹11,23,324 |
| 016Erection of single bracket assembly with accessories and stay & bracket insulator Porcelain type | 40 Each | ₹2,413.81 | ₹96,552.40 |
| 017Supply of a guy rod assembly. | 4 Each | ₹9,548.42 | ₹38,193.68 |
| 018Erection of a guy rod assembly. | 4 Each | ₹1,733.49 | ₹6,933.96 |
| 019Supply of regulating equipment (3 pulley type) with counter weight assembly for conventional OHE. | 4 Each | ₹69,408.38 | ₹2,77,633.52 |
| 020Erection of regulating equipment (3 pulley type) with counter weight assembly for conventional OHE. | 4 Each | ₹4,642.74 | ₹18,570.96 |
| 021Supply of 25 KV Single Pole Isolator with/without earth contact assembly | 4 Numbers | ₹62,664.41 | ₹2,50,657.64 |
| 022Erection of 25 KV Single Pole Isolator with/without earth contact assembly | 4 Numbers | ₹3,463.20 | ₹13,852.80 |
| 023Supply of 18 mm dia Solid Copper bus-bar | 24 Metre | ₹1,224.49 | ₹29,387.76 |
| 024Erection of 18 mm dia Solid Copper bus-bar | 24 Metre | ₹220.22 | ₹5,285.28 |
| 025Dead Section Caution Board (Retroreflective Type) Caution unwired turnouts as per RDSO spec. ETI/OHE/33A rev.6 or latest. | 8 Each | ₹3,156.21 | ₹25,249.68 |
| 026Supply of Retro-reflective structure number plate | 32 Each | ₹1,052.58 | ₹33,682.56 |
| 027Erection of Retro-reflective structure number plate | 32 Each | ₹186.04 | ₹5,953.28 |
| 028Transfer of equipment from one mast or support to another | 32 Each Span | ₹1,875.38 | ₹60,012.16 |
| 029Supply of 25 KV Post Insulator | 8 Numbers | ₹9,878.17 | ₹79,025.36 |
| 030Erection of 25 KV Post Insulator | 8 Numbers | ₹584.91 | ₹4,679.28 |
| 031Dismantling of OHE Mast/structure by cutting from ground level | 32 Each | ₹4,836.74 | ₹1,54,775.68 |
| 032Dismantling of Cantilever Assembly / OHE support | 32 Numbers | ₹805.14 | ₹25,764.48 |
| 033Dismantling of Single Pole Isolator | 2 Numbers | ₹3,212.04 | ₹6,424.08 |
| 034Dismantling of Guy Rod assembly | 4 Numbers | ₹702.10 | ₹2,808.40 |
| 035Dismantling of termination fittings | 4 Numbers | ₹535.17 | ₹2,140.68 |
| 036Dismantling of number plate / caution board with | 32 Numbers | ₹46.98 | ₹1,503.36 |
| 037Dismantling of 9-tonne insulator | 8 Numbers | ₹556.37 | ₹4,450.96 |
| 038Dismantling of jumpers | 8 Numbers | ₹319.14 | ₹2,553.12 |
| 039Dismantling of SPS | 1.20 MT | ₹4,693.08 | ₹5,631.70 |
| 040Dismantling of Portal/TTC boom including cutting of upright | 8 Numbers | ₹12,532.24 | ₹1,00,257.92 |
| 041Dismantling of Regulating equipment with counter weight assembly | 8 Numbers | ₹5,423.58 | ₹43,388.64 |
| Schedule B · Extra payment for power block activity for above erection work | |||
| 001Erection of materials for termination of double overhead equipment conductor (excluding 9 Tonne | 8 Numbers | ₹1,098.97 | ₹8,791.76 |
| 002Erection of all Rolled/Fabricated mast, portal & TTC for conventional OHE. | 13.56 MT | ₹10,513.06 | ₹1,42,557.09 |
| 003Erection of Fabricated steel work, DA, SPS etc. | 4.80 MT | ₹11,176.02 | ₹53,644.90 |
| 004Erection of single bracket assembly with accessories and stay & bracket insulator Porcelain type | 40 Each | ₹2,413.81 | ₹96,552.40 |
| 005Erection of a guy rod assembly. | 4 Each | ₹1,733.49 | ₹6,933.96 |
| 006Erection of regulating equipment (3 pulley type) with counter weight assembly for conventional OHE. | 4 Each | ₹4,642.74 | ₹18,570.96 |
| 007Erection of 25 KV Single Pole Isolator with/without earth contact assembly | 4 Numbers | ₹3,463.20 | ₹13,852.80 |
| 008Transfer of equipment from one mast or support to another | 32 Each Span | ₹1,875.38 | ₹60,012.16 |
| 009Dismantling of OHE Mast/structure by cutting from ground level | 32 Each | ₹4,836.74 | ₹1,54,775.68 |
| 010Dismantling of Cantilever Assembly / OHE support | 32 Numbers | ₹805.14 | ₹25,764.48 |
| 011Dismantling of Single Pole Isolator | 2 Numbers | ₹3,212.04 | ₹6,424.08 |
| 012Dismantling of Guy Rod assembly | 4 Numbers | ₹702.10 | ₹2,808.40 |
| 013Dismantling of termination fittings | 4 Numbers | ₹535.17 | ₹2,140.68 |
| 014Dismantling of 9-tonne insulator | 8 Numbers | ₹556.37 | ₹4,450.96 |
| 015Dismantling of jumpers | 8 Numbers | ₹319.14 | ₹2,553.12 |
| 016Dismantling of SPS | 1.20 MT | ₹4,693.08 | ₹5,631.70 |
| 017Dismantling of Portal/TTC boom including cutting of upright | 8 Numbers | ₹12,532.24 | ₹1,00,257.92 |
| 018Dismantling of Regulating equipment with counter weight assembly | 8 Numbers | ₹5,423.58 | ₹43,388.64 |
| Total | ₹69,61,628.05 | ||
The total matches the advertised value.
Documents
6 files- PDFNotice inviting tenderviewNitPdf_5575718.pdf (opens in a new tab)
- PDFTender documentTenderdocumentmachinesiding8stationsbranchlines_10- R4.pdfNo direct link in the notice; see the notice, page 11
- PDFAnnexuresAnnexures.pdfNo direct link in the notice; see the notice, page 11
- PDFGCC worksGCC-2022-ACS10_merged_compressed.pdfNo direct link in the notice; see the notice, page 11
- PDFGCC ACS 11GCCACS11_compressed.pdfNo direct link in the notice; see the notice, page 11
- PDFAnnexure-V(A)Annexure-V(A).pdf (opens in a new tab)
Documents to submit
Commercial-Compliance
- Document optional
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Custom
- Document required
Tender Form (First Sheet) as per 'Annexure-I'
- Document optional
Firm details as per 'Annexure-II'
- Document optional
Certificate as per proforma given in 'Annexure-III'(Annexure-V in tender Documents)
- Document required
Certificate as per Performa Given In Annexure V-A. (this certificate is to be submitted by attorney/authorized signatory/each member of Partnership firm/Joint Venture(JV)/Hindu Undivided family(HUF)/Limited Liability Partnership(LLP) etc.)
- Document required
Valid Electrical Contractors License issued by Govt. Licensing Authority.
Show all 14
- Document optional
Valid Electrical Supervisor's License of 25KV system or more. The Contractor has to submit documentary proof of electrical supervisor being employed by the contractor holding valid electrical supervisor License prior to commencement of work.
- Document required
Current and valid GST Registration Certificate
- Document optional
EPF Registration Certificate
- Document optional
List of works on hand as per proforma given in 'Annexure-VI'
- Document optional
List of Plants & Machinery available on hand (own) and proposed to be inducted (own and hired to begiven separately) for the subject work in 'Annexure-VII'.
- Document optional
List of Personnel, Organization available on hand and proposed to be engaged for the subject work in 'Annexure -VIII'.
- Document required
Permanent Account Number (PAN) card issued by Income Tax Department.
- Document required
Following documents are to be submitted by tenderers as per status of their firms. These documents are listed below - 13.1 For Sole Proprietorship firm-
- Affidavit as per Annexure -X.
- Special power of Attorney as per proforma given in 'Annexure-XI' to be submitted by sole proprietor firm duly notarized. (Not required if tender documents are submitted by proprietor himself). 13.2 For Partnership firm-
- Self/Notary attested copies of Partnership deed.
- Special Power of Attorney as per proforma given in 'Annexure-XII' to be submitted by Partnership firm. (Not required if one or more partners are authorized in Partnership deed to sign on behalf of the firm.). 13.3 For Limited Company-
- Copy of Memorandum & Articles of Association of Company.
- Self/Notary attested copy of resolution passed by Board of Directors authorizing its Director/Employee to deal with tender on behalf of company.
- Attested copy of Notarized Special Power of Attorney including ratification clause duly signed by person authorized by the company vide (b) above as per proforma given in 'Annexure-XIII'.
Eligibility
Standard Financial Criteria
- Document required
Clause Regarding GST
- All the Bidders/tenderers should ensure that they are GST Compliant and their quoted tax Structure are as per GST LAW.
- Tenderer Should Furnish their GSTIN numbers representing the States in Which they are registered GST, along with address of Registered Office.
- The Contract is under GST Act and rules as applicable time to time.
Special Financial Criteria
- Document required
Financial Eligibility Criteria The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N=Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB(Annexure-IX in Annexure section), along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Special Technical Criteria
- Document required
Technical Eligibility Criteria
- The tenderer must have successfully completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender.
- In case of tenders for composite works(e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed any of the following during last 07 (seven)years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note for b(i):Separate completed works of minimum required values for each component shall also be considered for fulfillment of technical eligibility criteria. Note: Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organization, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5years prior to the date of opening of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.
- Document required
Similar Nature of Work is Defined as "Design, Supply, erection, testing & commissioning of 50 Hz, single phase 25 kV AC Over Head Equipment.".
Partnership firm/Joint Venture (JV) / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc.
Please submit a certificate in the prescribed format (please download the format from the link given below). Non submission of the certificate, or submission of certificate either not properly filled in, or in a format other than the prescribed format shall lead to summary rejection of your offer. ( Click here to download the Format of Self Certification)
Check each criterion against the tender notice before you bid.
Commercial conditions
- EMD
- ₹139,200
- Tender fee
- None
Terms & conditions
37 conditionsSpecial Conditions
The work shall be completed within 12 months after issuing of LOA.
The indenting Tenderer should have valid Electrical Contractor License issued by Govt. Licensing Authority on his own name.
Submission of Electrical Supervisor license by the tenderer at the time of tendering is optional. However, the Contractor has to submit documentary proof of electrical supervisor being employed by the contractor holding valid electrical supervisor License for working in 25 KV or more than 25 KV system prior to commencement of work.
Tenderer should have experience in "Design, supply, erection, testing & commissioning of 50 HZ single phase 25 KV AC Over Head Equipment".
The Contractor shall deploy the qualified Graduate Engineer(s) or equivalent, or qualified Diploma Engineer(s) during execution the tender works as per GCC-April/2022.
The contractors are advised to provide / mention their contact nos. (Telephone/Mobile nos. of self, their supervisor and staffs) to Railway officials as soon as Contract is awarded. The contact Telephone/Mobile no. should be working for 24 Hrs.
No TA/DA or any sort of other traveling facility will be provided to the contractor or to his authorized staff for undertaken Railway journey in connection with this contract.
No compensation towards any accident whatsoever will be paid by the Railway.
Price Variation Clause (PVC) shall not be applicable to this work.
The Contractor shall provide necessary tools, instruments and equipment regarding the nature of scheduled work to his all labours and his employees at his own cost. Contractor shall make necessary arrangements for mast erection and other activities necessary for Electrification of the tracks at his own cost.
Show all 37
Contractor shall be liable to compensate the Railway administration for all damages and losses that may be caused to electrical (TRD) or other property belonging to the Railway Administration whether in his possession or not, through his negligence, misconduct, default or any other act of commission or omission or that of his agents, servants or employees.
Contractor has to keep their tools, instruments and equipment in their own custody at the space to be provided by railways. Theft or any unusual occurrence will be the full responsibility of the contractor.
Senior section engineer (in charge) of concern depots or their nominated representative shall be responsible for inspection of material and supervision of this contract and for certifying the quantum for purposes of payment of the contractor's bills.
Contractor must supply the materials as per RDSO Drg. /specifications & Original test/guarantee certificate of the supplied Items should be submitted to the Senior Section Engineer (in-charge) before execution of the work.
Samples of the items to be utilized in the work has to be got approved from the Electrical/TRD officer in charge before starting the work.
Railway reserves the right to demand for any particular make of fitting/equipment as mentioned in the list.
Contractor must submit authenticated purchase documents or materials are being taking on loan from reputed firm with certificate and test certificates of major items used in the work before billing
Electrical work shall be undertaken as per IE Rules. All activities shall be carried out as per extant rules, latest RDSO guidelines, IS standards etc.
Offers are to be submitted as per GST regime. GSTIN registration should be provided by the contractor.
Released materials if any, to be deposited to concern OHE cum PSI Depot in-charge by contractor's own arrangement through proper challan.
Testing of tensile load strength of insulators must be done by contractor before putting them in service and to be certified by competent authority. Also testing date to be written on the cap of insulators.
RITES Inspection of material to be done by contractor as per instruction of competent authority (Sr.DEE/TRD) at his own cost or Authorized to any person by the competent authority for inspection of materials as deemed fit and certificate to be submitted before installation of the material.
Only RDSO/CORE Approved vendor material should be used.
Firms must follow guidelines of IR Shramik Kalyan portal as per extant rule.
As per Rly Board's L. No. 2018/CE-I/CT/4 dated 17.10.2018, in order to increase transparency in payment of contract labour wages and other payments, web-based e-application has been developed and hosted on website www.shramikkalyan.indianrailways.gov.in. All contractors are required to upload details of their LOAs, engaged workmen, wage payment details, PF/ESIC details, etc. on monthly basis. The details so uploaded shall be available in public domain. The Shramik Kalyan details of engaged workmen, wage payment details, PF/ESIC details, etc. on monthly basis shall also be submitted along with every bill. Option for the contractor to take payment from Railways through a letter of credit (LC) arrangement shall be as per Railway Board's letter no. 2018/CE- I/CT/9 dated 04.06.2018.
The Contractor shall comply with the provision of the
- Contract Labour (Regulation and Abolition) Act, 1970
- Contract labour (Regulation and Abolition) Central Rules 1971 iii) provisions of Para 30 & 36-B of the Employees Provident Fund Scheme, 1952 iv) provisions of Section 12 Sub- Section (1) of the Workmen's Compensation Act 1923 and follow all Labour's law / rules as given in Standard General Conditions of Contract 2018 of Indian Railway with latest amendments.
All Tenderers should note before quoting their rate for this tender that supplier of goods and/ or services would be subjected to GST Act and rules as applicable time to time.
Only existing LOP and engineering plan will be supplied by Railways to contractor for reference in Sr. DEE/TRD's Office itself.
The actual location of casting of foundations, erection of OHE structures, shifting etc. shall be given to the successful Tenderer by respective SSE (TRD) or his Railway representative if drawing and design is of railway. Necessary existing drawings wherever required shall be given to the successful Tenderer. Site survey, all designs and drawings pertaining to this work, including modification of existing OHE, if required, shall be prepared and submitted by the contractor.
Transportation of materials by loading and unloading shall be arranged by contractor at his own cost, for supplied materials by contractor and materials supplied by railway for completion of work.
At the time of digging of foundation, due care is to be taken by contractor for safety of Railway track, communication and power cable etc. and no damage should be occurred during execution of work, if damages occurred then penalty will be imposed as damaged cost.
At the time of erection of masts / portal / TTCs/Any Structure, Up-rooting of OHE masts, necessary protection is to be taken by contractor for safety of moving trains/Railway Track/Railway Property/Railway Staff / Passengers / Contractors staff etc.
All the works are to be done in the presence of Railway representative.
The contractor will be levied penalty if cable cut/ damaged due to negligence during any kind of work, and penalty will be recovered by latest JPO and relevant policy of Railways.
Tower wagon may be availed from railway administration only if available, for Contact wire replacement and OHE Adjustment and checking as when required for early execution of work free of cost with the approval of the competent authority.
Warranty -
- Items for which the warranty offered by manufacturer is more than one year, contractor will submit the warranty card of the item duly filled in all respect to consignee.
- The contractor shall warranty that all materials & equipment's to be supplied and installed as per this tender shall be free from defects and faults in design, material, workmanship and manufacture and shall be of the highest quality and consistent with the established and generally accepted standard for materials of the type ordered and in full conformity with the contract specifications.
- The contractor shall give warranty / provide maintenance for satisfactory working of all the equipment's & installations erected & commissioned by him in this tender, for a period of ONE YEAR from the date of commissioning.
- During the period of Warranty, the contractor shall keep available experienced engineer & technician and necessary equipment to attend to any defective installation. The Contractor shall bear the cost of all modifications, additions or substitutions that may be considered necessary due to faulty material, decision regarding this shall rest with the Sr.DEE/TRD/TSK.
- During the period of Warranty, the contractor shall be liable for the replacement of any equipment & any parts which may be found defective, whether such equipment be of his own manufactured or those of his sub-contractor, whether defect arising from faulty design, material, workmanship or negligence in any manner on the part of the Contractor, at his (Contractor's) own expenses. In case of defect of similar type detected in contractor's equipment & components during the warranty period, the contractor shall replace complete lot of the items irrespective of the fact that whether all such items have failed or not. The Contractor shall bear the cost of repair carried out on his behalf by the Purchaser at site due to urgent requirement. In such a case, the Contractor shall be informed in advance of the repair proposed to be carried out by the Purchaser.
- If it becomes necessary for the contractor to replace or renew any defective portion/s of the system under this clause, the provisions of this clause shall apply to the portion of equipment/component/system so replaced for further period of 12 months from the date of such replacement or renewal or until the end of the warranty period whichever may be later. If any defect is not remedied within reasonable time, the Railway may proceed to do the work at contractor's risk and expense, but without prejudice to any other rights, which the Railway may have against the contractor in respect of such defects.
- The repaired or renewed part shall be delivered and erected on site free of charge to the purchaser.
- The Railway shall have right for acceptance, rejection of materials at site if the same are not in accordance with the specifications.
- SD will be release to tenderer after completion of warranty period of 01 year.
Payment Terms Payment will be made to Contractor time to time through CC Bills for only the work/Item which are executed/installed/commissioned as certified by Concerned Engineer. On Account payment: On account payment will be made to the extent of 80% of supply rate of item after supply, inspection, testing, acceptance of material and payment of all dues in terms of Royalty charges(if chargeable minerals have been used). In case separate rate of supply is not specified in the schedule, no payment will be made against supply for example foundation etc. Balance 10% of supply and 90% of erection portion shall be paid after erection to the satisfaction of Railways. Final payment: Balance 10% will be released through final bills, after completion of all formalities like, submission of no claim certificate, submission of as erected drawing, rectification of defects/deficiencies noticed till such time, guarantee certificate and submission of Bank Guarantee or any other instrument which are acceptable as security deposit for warranty period of 10% of the contract value as per final variation statement. Security deposit for warranty period will be released after completion of warranty period on submission of no claim certificate as well as certificate for not going for any arbitration or court proceedings against this contract and rectification of defect/deficiencies during warranty period.
Bidder declarations (12)
Undertakings
I/We have read the various condition attached/referred to in this tender document and agree to abide by the said condition
I /we also hereby agree to abide by the Indian Railways Standard General Condition of Contract-April 2022 with all correction slip up to date of closing of tender and to carry out the work according to the special conditions of contract and specification of materials and works as laid down by Railway in the attached special condition or specification, Schedule of rates with all correction slips up to date of closing of tender for the instant contract.
Certifications
I/we the tenderer (s) am/are signing this document after carefully reading the contents.
I/We the tenderer(s) also accept all the conditions of the tender and have signed all the pages in confirmation thereof.
I/we hereby declare that I/we have downloaded the tender documents from Indian Railway website www.ireps.gov.in . I/we have verified the content of the document from the website and there is no addition, no deletion or no alteration to the content of the tender document. In case of any discrepancy noticed at any stage i.e. evaluation of tenders, execution of work or final payment of the contract, the master copy available with the railway Administration shall be final and binding upon me/us.
I/we declare and certify that I/we have not made any misleading or false representation in the forms, statements and attachments in proof of the qualification requirements.
I/We also understand that my/our offer will be evaluated based on the documents/credentials submitted along with the offer and same shall be binding upon me/us.
I/We declare that the information and documents submitted along with the tender by me/us are correct and I/we are fully responsible for the correctness of the information and documents, submitted by us.
I/we certify that I/we the tenderer(s) is/are not blacklisted or debarred by Railways or any other Ministry / Department of Govt. of India from participation in tender on the date of submission of bids, either in individual capacity or as a HUF/ member of the partnership firm/LLP/JV/Society/Trust.
I/we understand that if the contents of the certificate submitted by us are found to be forged/false at any time during process for evaluation of tenders, it shall lead to forfeiture of the Bid Security and may also lead to any other action provided in the contract including banning of business for a period of upto two year. Further, I/we and all my/our constituents understand that my/our offer shall be summarily rejected.
I/we also understand that if the contents of the certificate submitted by us are found to be false/forged at any time after the award of the contract, it will lead to termination of the contract, along with forfeiture of Bid Security/Security Deposit and Performance guarantee and may also lead to any other action provided in the contract including banning of business for a period of upto two year.
I/We have read the clause regarding restriction on procurement from a bidder of a country which shares a land border with India and certify that I am/We are not from such a country or, if from such a country, have been registered with the competent Authority. I/We hereby certify that I/we fulfil all the requirements in this regard and am/are eligible to be considered (evidence of valid registration by the competent authority is enclosed)
Similar open tenders
Soonest first- 11 daysleftElectrical TRD work in connection with Various Engineering Track related work in jurisdic…Ministry of Railways · Closes 21 Oct 2026
- 12 daysleftElectrical work connection to:- (i) Provision of Toilet for SS at 10 stations in CPJ-THE…Ministry of Railways · Closes 22 Oct 2026
- 13 daysleftElectrical TRD work in connection with Various Engineering Track related work in jurisdic…Ministry of Railways · Closes 23 Oct 2026
- 13 daysleftTRD related work in connection to the work of Utility shifting for construction of ROB at…Ministry of Railways · Closes 23 Oct 2026
- 18 daysleftOHE modification work in connection with proposed machine siding at CRX Station under the…Ministry of Railways · Closes 28 Oct 2026
- 19 daysleftTRD Works in Connection with Provision of Track Machine Sidings at 06 Stations in Surendr…Ministry of Railways · Closes 29 Oct 2026
- 20 daysleftElectrical (TRD) work in connection with extension of platform under ABSS at 04 stations…Ministry of Railways · Closes 30 Oct 2026
- 20 daysleftProvision of S&T work in connection with Construction of PQRS siding at BURHPURA station.Ministry of Railways · Closes 30 Oct 2026
Search similar in the explorerFind this tender in the explorer