BULK ORDER Bulk Order (Bulk Order is defined as minimum 80 % of net procurable quantity in a tender) shall be ordered on established sources having proven past supply performance as define below. For placement of bulk quantity order, the manufacturer firm must have successfully supplied minimum 20 % of the tendered quantity of the tendered item/Drawing/specification in a single purchase order or contract of Zonal Railways/ PUs/CORE during the period of three previous completed financial year and current financial year up to date of tender Closing. Successful supply shall mean acceptance of supply by consignee. (1b) DEVELOPMENTAL ORDER ON THE BASIS OF PAST PERFORMANCE: If such past supply performance level is lower than as required for bulk order (i.e.minimum20%), then the offer may be considered for placement of developmental order not exceeding to 20% of the net procurable quantity. For establishing above past Supply Performance (1a & 1b above), firms should submit documentary evidence certifying proof of supply performance, which shall be scanned copies of receipt notes or inspection certificates along with self-declaration by the bidder that supply has been accepted by consignee, Furnishing of false declaration shall render termination of contract and further action as per terms and conditions of contract or Consignee Receipt & Acceptance Certificate or Consignee Receipt Note or Supply Performance issued by Gazetted Officer of consignee along with offer. (1c) DEVELOPMENTAL ORDER ON THE BASIS OF OTHER CREDENTIALS: The tenderer who have no past performance as above may also be considered for such developmental order not exceeding 20% of the net procurable quantity), but for consideration of such offers, Tenderers must be able to demonstrate their Capacity cum Capability to manufacture the tendered item. For this, tenderer must submit the details of M&P, testing facility, QAP and ISO 9000 / 14000 / 18000 certificates if available, technical manpower available with them registration with other Government agencies or PSUs etc. or any other details as may be warranted as per the technical specification and drawing. Tenderers are to note that non submission of the documents to establish their eligibility for (1a) or (1b) or (1c) shall be taken as they are not having any such documents. Their offer shall be considered based on whatever documents are submitted by them with the offer and no back reference in this regard will be made to them.