FOR DESTINATION Firm are advised to quote with delivery term FOR destination, if firm will offer with delivery term FOR ex Works and delivery by Road/Rail than firm shall dispatch the stores in such a way that it shall reach the ultimate consignee before terminal date of delivery mentioned in the contract. In such cases merely the dispatch of material within contractual delivery period does not mean that firm has supplied the material within contractual delivery period but it shall reach to ultimate consignee on or before contractual delivery period as date of supply of material.