1) Door delivery to Consignee along with Delivery Challan (i.e. Postal Address is: To, The Senior Section Engineer (Material Control Cell), Diesel Loco Shed, Chennimalai Road, Erode- 638002). 2). Material has to be strictly supplied within delivery date. Otherwise, Liquidated damage (LD) will be imposed viz. 0.5 percentage per week, upper limit being 10 percentages on delayed supply. 3) If the material is further not supplied within 3 months after the delivery due date mentioned in P.O, then this purchase order will get cancelled without intimation to firm. 4. Along with supply of material, firm has to submit the following documents in original for passing of bill:
- Delivery Challan.
- Original Tax Invoice.
- GST Annexure.
- GST Declaration.
- Warranty/Guarantee/Calibration Certificate if specified. .
- Test Certificate if specified.