HYDRAULIC PRESS VERTICAL WITH AMC , CAPACITY 4-COLUMN 300T (On Turnkey Basis) as per ANNEXURE
- Warranty
- 30 Months after the date of delivery
- Stock category
- Non Stock
- Inspection agency
- TPI Agency
Ministry of Railways
Office of the Dy.CMM, RWSS/R SOUTH EAST CENTRAL RAILWAY RAIPUR
Delivers to
Raipur, Chhattisgarh
Ministry of Railways published this goods tender on eProcure on 9 Oct 2026, for Raipur, Chhattisgarh. The EMD is ₹1.6 L. It closes on 2 Nov 2026, 10:30 am IST. Tender ID 107209765 · Ref 22265223.
1 item · 1 delivery location
SSE(CBC)/WRS/R, SECR
ChhattisgarhPlease enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Firm should attach satisfactory performance of last 3 year from any unit of Indian Railways or any Central Govt. Organization. Firm should submit only performance certificate with respective PO copies of last 3 years only.
Special condition for CMC Comprehensive Maintenance Charges (CMC) will not be considered in awarding the contract and the same shall be abide by all bidders. The CMC period will come to effect after warranty period is over.
The minimum offer validity should be 90 days.
OEM-
Firms are requested to read carefully of Technical specification attached with this tender before quoting and uploaded the same with signature and seal please else offer will be summarily rejected.
Firm should have own local service center or manufacturing unit within the state of consignee (i.e. Chhattisgarh). documentary evidence like GST in the name of Service Center/Manufacturing Unit to be submitted along with the offer. or Firm should give undertaking that in the event of warranty breakdown firm's service engineer will report to consignee site within 24 hrs of breakdown intimation and Firm should also give undertaking that it will establish Service Center in Consginee State (i.e. Chhattisgarh) within 1 month from date of issue of PO"
Check each criterion against the tender notice before you bid.
80% payment of the machine shall be done after successful commissioning of the machine and remaining 20% after issue of PTC on submission of 10% PG
Any changes in GST due to changes shall be allowed during the original delivery period against documentary evidences. However, same will not be allowed due to increase in turnover or misclassification.
The contract shall be governed by IRS condition of contract latest version, SECR General Tender Condition 2019 (along with all correction slips and all other terms and conditions incorporated in tender documents attached with this tender.
FOR Destination. Firm are advised to quote with delivery term FOR Destination. If firm will offer with delivery term FOR ex-Works and delivery by Road/Rail then firm shall dispatch the stores in such a way that it shall reach the ultimate consignee before terminal date of delivery mentioned in the contract. In such cases merely the dispatch of material within contractual delivery period does not mean that the firm has supplied the material within contractual delivery period but it shall reach to ultimate consignee on or before contractual delivery period as date of supply of material.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items.The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Supplier shall furnish their GSTIN No and the HSN Code for the items quoted.
Purchaser shall not be responsible for any misclassification of HSN number or incorrect GST rate if quoted by the bidder.
Inspection by TPI Agency
GSTIN No. of SECR:- Madhya Pradesh- 23AAAGM0289C1ZR, Maharashtra- 27AAAGM0289C2ZI, Odisha- 21AAAGM0289C1ZV and Chhattisgarh- 22AAAGM0289C1ZT.
All the bidders/tenderers should ensure that they are GST compliant and their quoted tax structure/rates are as per GST Law.
Material unloading should be done by firm at consignee location.
Consequence of Failure
If vendor quotes delivery period as range bound period then the lower value of that range will be considered for delivery period.
Supply, Installation and Commissioning to be done by the firm.
Firm may visit WRS/Raipur at his own cost for assessing the scope of work before quoting the bid. Unloading of Machine and placing the machine at required location of WRS/R shall be within the Scope of Supplier.
I/We agree to supply the tendered stores at the rates quoted by me/us in accordance with the IRS Conditions of Contract.
I/We also confirm that Rates and other financial terms quoted in relevant columns of financial bid will only be ruling terms for acceptance. Such terms quoted anywhere else should be ignored.
Search similar in the explorerFind this tender in the explorer