Provision/Modification of OHE in connection with (1) Chhulha: Construction of Long Loop Line (CAL-750m, DS-PT) with bi-directional 03rd line by extending DE of loop line no.-5 at APR end. (2) AAL: Ex…
Ministry of Railways
Office of Sr.DEE/RS and G/BSP DRM office complex, SEC Railway, Bilaspur-495004 Bilaspur
Delivers to
Bilaspur, Chhattisgarh
Overview
22 facts from the tenderMinistry of Railways published this works tender on eProcure on 10 Oct 2026, for Bilaspur, Chhattisgarh. The estimated value is ₹2.9 Cr and the EMD is ₹5.8 L. It closes on 9 Nov 2026, 3:00 pm IST. Tender ID 92277848 · Ref TRD-BSP-324-26-27-17.
Timeline
- Published10 Oct 2026 · 7:36 pm
- Bidding startsin 9d 7h26 Oct 2026
- Closes9 Nov 2026 · 3:00 pm
Bidding
- Bid type
- Open/Advertised
- Contract type
- Works - General · Expenditure
- Tender type
- Open
- Tendering section
- TRD BSP
- Bidding system
- Single Packet System
- Bidding style
- Single Rate for Each Schedule
- Validity of offer
- 60 days
- Completion period
- 18 Months
- Tender document cost
- None
- JV / consortium
- Not allowed
- Ranking order
- Lowest to Highest
- Expenditure type
- Capital (Works)
- Pre-bid meeting
- None
Buyer
- Inviting authority
- BILASPUR DIVISION-ELECTRICAL/SOUTH EAST CENTRAL RLY
- Organisation type
- Central Govt. Ministry/Department
- Product category
- Railway related Products
- Location
- Bilaspur, Chhattisgarh · the inviting office's place
- Portal
- eProcure
- Inviting officer
- Sr.DEE/TRD/BSPBILASPUR DIVISION-ELECTRICAL/SOUTH EAST CENTRAL RLY
Important dates
- Published
- 10 Oct 2026, 7:36 pm IST
- Bidding starts
- 26 Oct 2026
- Closes
- 9 Nov 2026, 3:00 pm IST
Declarations by the buyer
- Complies with the Public Procurement (Make in India) Order 2017
- The tender inviting authority confirms this tender does not violate the GFR rules on procurement through GeM
- Bidders from a country sharing a land border with India must be registered with the competent authority
Schedule of work
335 items| Item | Quantity | Railways’ estimated rate | Amount |
|---|---|---|---|
| Schedule A · Chhulha: Construction of Long Loop Line (CAL-750m, DS-PT) with bi- directional 03rd line by extending DE of loop line no.-5 at APR end. | |||
| 1Supply: Preparation of Design and Drawing for OHE (a) Preparation & supply of GAD ,sectiondiagram,LOP & CSD | 2 Per Track KM | ₹9,056 | ₹18,112 |
| 2Supply: Preparation of Design and Drawing for OHE (b) Preparation & supply of SED & as erected drawing | 2 Per Track KM | ₹8,355 | ₹16,710 |
| 3Erection:- Concrete for Foundation & Plinth in Hard soil | 10 cum | ₹8,227 | ₹82,270 |
| 4Erection:- Concrete for Foundation & Plinth in Rocky soil | 10 cum | ₹8,551 | ₹85,510 |
| 5Erection:- Concrete for Foundation & Plinth in other than Hard and Rocky soil | 185 cum | ₹7,060 | ₹13,06,100 |
| 6Supply:- Galvanised Traction Mast (Rolled or Fabricated) | 21.28 MT | ₹1,29,959 | ₹27,65,527.52 |
| 7Erection/NPB: Galvanised Traction Mast (Rolled or Fabricated) | 10 MT | ₹5,842 | ₹58,420 |
| 8Erection/PB:Galvanised Traction Mast (Rolled or Fabricated) | 11.28 MT | ₹11,683 | ₹1,31,784.24 |
| 9Supply: portal structure (b) Drop Arms complete set including all fittings | 0.44 MT | ₹1,26,228 | ₹55,287.86 |
| 10Erection/PB Portal structure (b) Drop Arms complete set including all fittings | 0.44 MT | ₹20,777 | ₹9,100.33 |
| 11Supply: T.T.C. complete | 2.53 MT | ₹1,24,485 | ₹3,15,196.02 |
| 12Erection/PB:T.T.C. complete | 2.53 MT | ₹21,780 | ₹55,146.96 |
| 13Supply: FIXTURE S(C1) Fabricated Steel work other than Mast (including super masts for feeder wire) | 2 MT | ₹1,30,946 | ₹2,61,892 |
| 14Erection/NPB: FIXTURES (C1) Fabricated Steel work other than Mast (including super masts for feeder wire) | 1.50 MT | ₹7,619 | ₹11,428.50 |
| 15Erection/PB:FIXTURES (C1) Fabricated Steel work other than Mast (including super masts for feeder wire) | 0.50 MT | ₹15,155 | ₹7,577.50 |
| 16Supply:FIXTURES (C2) Supply of GI fastners | 1.20 MT | ₹1,38,875 | ₹1,66,650 |
| 17Supply: CANTILEVER & INSULATORS (a) Single Bracket assembly for Conventional OHE with SPS | 45 Numbers | ₹21,366 | ₹9,61,470 |
| 18Erection/NPB:CANTILEVER & INSULATORS (a) Single Bracket assembly for Conventional OHE with SPS | 35 Numbers | ₹1,053 | ₹36,855 |
| 19Erection/PB: CANTILEVER & INSULATORS (a) Single Bracket assembly for Conventional OHE with SPS | 10 Numbers | ₹2,080 | ₹20,800 |
| 20Supply: INSULATORS & COMPONENTS (E1) Stay Arm Insulator | 45 Numbers | ₹5,147 | ₹2,31,615 |
| 21Supply: INSULATORS & COMPONENTS (E2) Bracket Insulator | 45 Numbers | ₹5,060 | ₹2,27,700 |
| 22Supply: INSULATORS & COMPONENTS (b) Assorted Components for conventional OHE | 1.50 Kilometre | ₹69,273 | ₹1,03,909.50 |
| 23Erection/NPB: (ii) Erection of OHE OHE (Conventional) | 1 Kilometre | ₹42,784 | ₹42,784 |
| 24Erection/PB: (ii) Erection of OHE OHE (Conventional) | 0.50 Kilometre | ₹85,568 | ₹42,784 |
| 25Supply: Extra on item 22,23 & 24 for Supply and Erecrion of additional fitting at a turnout Diamand Crossing or Overlap | 4 Numbers | ₹3,499 | ₹13,996 |
| 26Erection/PB: Extra on item 22, 23 & 24 for Supply and Erecrion of additional fitting at a turnout Diamand Crossing or Overlap | 4 Numbers | ₹1,865 | ₹7,460 |
| 27Supply: Solid Core Cut-in-Insulator a) (i) 9 Ton Insulator | 4 Numbers | ₹7,489 | ₹29,956 |
| 28Supply: Solid Core Cut-in-Insulator (ii) Component | 4 Set | ₹1,982 | ₹7,928 |
| 29Erection/NPB: Solid Core Cut-in-Insulator b) Erection | 2 Set | ₹1,305 | ₹2,610 |
| 30Erection/PB: Solid Core Cut-in-Insulator b) Erection | 2 Set | ₹2,611 | ₹5,222 |
| 31Supply: Section Insulator assembly (for Con. OHE) a) (i) 9 Ton Insulator | 4 Numbers | ₹7,610 | ₹30,440 |
| 32Supply: Section Insulator assembly (for Con. OHE) (ii) S / I assembly | 4 Numbers | ₹49,154 | ₹1,96,616 |
| 33Supply: Section Insulator assembly (for Con. OHE) (iii) Core Insulator | 4 Numbers | ₹9,011 | ₹36,044 |
| 34Erection/NPB: Section Insulator assembly (for Con. OHE) (b) Erection | 2 Numbers | ₹3,782 | ₹7,564 |
| 35Erection/PB: Section Insulator assembly (for Con. OHE) (b) Erection | 2 Numbers | ₹7,563 | ₹15,126 |
| 36Supply: TERMINATION (a) Guy Rod assembly including Mast Anchor / Guy Rod attachment | 4 Set | ₹11,416 | ₹45,664 |
| 37Erection/NPB: TERMINATION (a) Guy Rod assembly including Mast Anchor / Guy Rod attachment | 2 Set | ₹921 | ₹1,842 |
| 38Erection/PB: TERMINATION (a) Guy Rod assembly including Mast Anchor / Guy Rod attachment | 2 Set | ₹1,833 | ₹3,666 |
| 39Supply: TERMINATION (b) BC Anchor loop | 5 Numbers | ₹1,224 | ₹6,120 |
| 40Supply: TERMINATION Regulating Equipment 3 Pulley type with Counter Weight assembly, guide tube for Conventional OHE | 3 Set | ₹1,12,008 | ₹3,36,024 |
| 41Erection/NPB: TERMINATION Regulating Equipment 3 Pulley type with Counter Weight assembly, guide tube for Conventional OHE | 1 Set | ₹3,499 | ₹3,499 |
| 42Erection/PB: TERMINATION Regulating Equipment 3 Pulley type with Counter Weight assembly, guide tube for Conventional OHE | 2 Set | ₹6,998 | ₹13,996 |
| 43Supply: Termination of Double Conductor of OHE (a) (i) 9 Ton Insulator | 5 Numbers | ₹7,252 | ₹36,260 |
| 44Supply: Termination of Double Conductor of OHE (ii) Component | 5 Numbers | ₹11,267 | ₹56,335 |
| 45Erection/NPB: Termination of Double Conductor of OHE (B) Erection | 2 Numbers | ₹1,055 | ₹2,110 |
| 46Erection/PB: Termination of Double Conductor of OHE b) Erection | 3 Numbers | ₹2,073 | ₹6,219 |
| 47Supply: Termination of 25 KV Alluminium Feeder / Return Conductor (Single Spider) a) (i) 9 Ton Insulator | 2 Numbers | ₹7,861 | ₹15,722 |
| 48Supply: Termination of 25 KV Alluminium Feeder / Return Conductor (Single Spider) (ii) Component | 2 Numbers | ₹7,402 | ₹14,804 |
| 49Erection/PB: Termination of 25 KV Alluminium Feeder / Return Conductor (Single Spider) b) Erection | 2 Numbers | ₹2,585 | ₹5,170 |
| 50Supply: 25 Kv Post Insulator a) (i) Post Insulator | 4 Numbers | ₹8,463 | ₹33,852 |
| 51Supply: 25 Kv Post Insulator (ii) Component | 4 Numbers | ₹780 | ₹3,120 |
| 52Erection/NPB: 25 Kv Post Insulator b) Erection | 2 Numbers | ₹697 | ₹1,394 |
| 53Erection/PB: 25 Kv Post Insulator b) Erection | 2 Numbers | ₹1,298 | ₹2,596 |
| 54Supply: Single Pole Isolator with Earth Contact assembly a) (i) SP Isolator assembly | 1 Numbers | ₹63,445 | ₹63,445 |
| 55Supply: Single Pole Isolator with Earth Contact assembly (ii) Earth Contact assembly | 1 Numbers | ₹10,191 | ₹10,191 |
| 56Erection/PB: Single Pole Isolator with Earth Contact assembly b) Erection | 1 Numbers | ₹7,415 | ₹7,415 |
| 57Supply: Double Pole Isolator with Earth Contact assembly a) (i) DP Isolator assembly | 1 Numbers | ₹1,24,964 | ₹1,24,964 |
| 58Supply: Double Pole Isolator with Earth Contact assembly (ii) Earth Contact assembly | 1 Numbers | ₹10,229 | ₹10,229 |
| 59Erection/PB: Double Pole Isolator with Earth Contact assembly b) Erection | 1 Numbers | ₹14,769 | ₹14,769 |
| 60Supply: BONDS Structure Bondof Avg length 3.25 mtrs including fastners | 44 Each | ₹466 | ₹20,504 |
| 61Erection: BONDS Structure Bondof Avg length 3.25 mtrs including fastners | 44 Each | ₹62 | ₹2,728 |
| 62Supply: BONDS Longitudinal Bond of length 4.50 mtrs for cross over point including fatners | 10 Each | ₹617 | ₹6,170 |
| 63Erection: BONDS Longitudinal Bond of length 4.50 mtrs for cross over point including fatners | 10 Each | ₹180 | ₹1,800 |
| 64Supply: BONDS Transverse/Special Bondf Avg length 3.25 mtrs inclduing Pvc Sleeve and fastners | 4 Each | ₹492 | ₹1,968 |
| 65Erection: BONDS Transverse/Special Bondf Avg length 3.25 mtrs inclduing Pvc Sleeve and fastners | 4 Each | ₹73 | ₹292 |
| 66Supply: NUMBER PLATE & CAUTION BOARDS: Number Plate Retro reflective type (Mast / Structure) | 44 Numbers | ₹485 | ₹21,340 |
| 67Erection/NPB: NUMBER PLATE & CAUTION BOARDS: Number Plate Retro reflective type (Mast / Structure) | 44 Numbers | ₹120 | ₹5,280 |
| 68Supply: NUMBER PLATE & CAUTION BOARDS Caution Board for 25 KV Traction | 40 Numbers | ₹370 | ₹14,800 |
| 69Erection/NPB: NUMBER PLATE & CAUTION BOARDS: Caution Board for 25 KV Traction | 40 Numbers | ₹119 | ₹4,760 |
| 70Supply: NUMBER PLATE & CAUTION BOARDS: Danger Board for 25 KV Traction | 40 Numbers | ₹370 | ₹14,800 |
| 71Erection/NPB: NUMBER PLATE & CAUTION BOARDS: Danger Board for 25 KV Traction | 40 Numbers | ₹119 | ₹4,760 |
| 72Supply: NUMBER PLATE & CAUTION BOARDS: Public Caution Board | 40 Numbers | ₹370 | ₹14,800 |
| 73Erection/NPB: NUMBER PLATE & CAUTION BOARDS: Public Caution Board | 40 Numbers | ₹119 | ₹4,760 |
| 74Supply: NUMBER PLATE & CAUTION BOARDS: Elect. Engine Stop Board | 40 Numbers | ₹1,033 | ₹41,320 |
| 75Erection/NPB: NUMBER PLATE & CAUTION BOARDS: Elect. Engine Stop Board | 40 Numbers | ₹254 | ₹10,160 |
| 76Supply: NUMBER PLATE & CAUTION BOARDS: Working limit Board (Power Block) | 40 Numbers | ₹370 | ₹14,800 |
| 77Erection/NPB: NUMBER PLATE & CAUTION BOARDS: Working limit Board (Power Block) | 2 Numbers | ₹119 | ₹238 |
| 78Supply: NUMBER PLATE & CAUTION BOARDS: Sectioning Diagram Board | 1 Numbers | ₹11,293 | ₹11,293 |
| 79Erection/NPB: NUMBER PLATE & CAUTION BOARDS: Sectioning Diagram Board | 1 Numbers | ₹1,130 | ₹1,130 |
| 80Erection NPB: NUMBER PLATE & CAUTION BOARDS Modififcation to section diagram at stations and TPC | 1 Numbers | ₹2,946 | ₹2,946 |
| 81Under PB: MODIFICATION WORK Modification to Erected Equipmentsa) :Transfer of Equipment from one Mast/support to another | 10 Numbers | ₹7,011 | ₹70,110 |
| 82Supply: MODIFICATION WORK: Modification to Erected Equipments: (b) Splicing and Extension of Anchored OHE including PVC Sleeve under ROB | 6 Numbers | ₹4,414 | ₹26,484 |
| 83Erection/PB: MODIFICATION WORK: Modification to Erected Equipments: (b) Splicing and Extension of Anchored OHE including PVC Sleeve under ROB | 6 Numbers | ₹12,445 | ₹74,670 |
| 84Erection/PB: MODIFICATION WORK: Modification to Erected Equipments(e) Adjustment of existing OHE with Tower wagon checking | 20 Each Span | ₹1,648 | ₹32,960 |
| 85NPB: DISMANTALING WORK Dismantaling of Mast/Structure upright | 5 Numbers | ₹3,779 | ₹18,895 |
| 86PB: DISMANTALING WORK Dismantaling of Mast/Structure upright | 5 Numbers | ₹7,345 | ₹36,725 |
| 87NPB:DISMANTALING WORK Dismantaling of Cantilever | 6 Numbers | ₹913 | ₹5,478 |
| 88PB: DISMANTALING WORK Dismantaling of Cantilever | 4 Numbers | ₹1,802 | ₹7,208 |
| 89NPB: DISMANTALING WORK Dismantaling of Guy rod assembly | 1 Numbers | ₹846 | ₹846 |
| 90PB:DISMANTALING WORK Dismantaling of Guy rod assembly | 1 Numbers | ₹1,662 | ₹1,662 |
| 91NPB:DISMANTALING WORK Dismantaling of Regulating Equipment with Counter Weight assembly | 1 Numbers | ₹3,388 | ₹3,388 |
| 92PB:DISMANTALING WORK Dismantaling of Regulating Equipment with Counter Weight assembly | 1 Numbers | ₹6,776 | ₹6,776 |
| 93PB: DISMANTALING WORK Dismantaling of Small Steel parts | 1 MT | ₹8,548 | ₹8,548 |
| 94PB : DISMANTALING WORK Dismantaling of Dismantling of termination | 2 Numbers | ₹10,843 | ₹21,686 |
| 95Supply: MISCELLANEOUS: Single Earth Electrode | 2 Numbers | ₹3,445 | ₹6,890 |
| 96Erection/NPB:MISCELLANEOUS Single Earth Electrode | 2 Numbers | ₹2,421 | ₹4,842 |
| 97Supply: Provision of Auxilary Transformer 25KV / 230 V, 10KVA | 1 Numbers | ₹1,50,545 | ₹1,50,545 |
| 98Erection/NPB: Auxilary Transformer 25KV / 230 V, 10KVA | 1 Numbers | ₹13,680 | ₹13,680 |
| 99Supply: Large span wire (130 /Sq.mm) | 400 Metre | ₹1,204 | ₹4,81,600 |
| 100Erection/PB: Large span wire (130 /Sq.mm) | 400 Metre | ₹154 | ₹61,600 |
| 101Supply: Supply of Overhead Equipment (C) Dropper Wire (5mm) | 472.50 Metre | ₹183 | ₹86,467.50 |
| 102Supply:Supply of Overhead Equipment e) Large Jumper Wire (105 Sq.mm) | 8 Metre | ₹1,042 | ₹8,336 |
| 103Supply: Supply of Overhead Equipment f) Small Jumper Wire (50 Sq.mm) | 24 Metre | ₹485 | ₹11,640 |
| 104Supply: Hard drawn conductor for cross feeder 150 Sq.mm (37/2.25 mm) | 240 Metre | ₹1,320.42 | ₹3,16,900.80 |
| 105Erection/PB: Hard drawn conductor for cross feeder 150 Sq.mm (37/2.25 mm) | 240 Metre | ₹86 | ₹20,640 |
| 106Sypply: MISCELLANEOUS Componant of termination of 130/150 Sq.mm cross feeder wire | 4 Numbers | ₹5,776.05 | ₹23,104.20 |
| 107Erection/PB: MISCELLANEOUS Componant of termination of 130/150 Sq.mm cross feeder wire | 4 Numbers | ₹1,810.10 | ₹7,240.40 |
| 108Supply: MISCELLANEOUS Large copper jumper wire 160 Sq.mm | 60 Metre | ₹1,487 | ₹89,220 |
| 109Supplyl: MISCELLANEOUS Component of Large copper jumper wire 160 Sq.mm | 10 Numbers | ₹6,203 | ₹62,030 |
| 110Erection/NPB: MISCELLANEOUS Component of Large copper jumper wire 160 Sq.mm | 4 Numbers | ₹159 | ₹636 |
| 111Erection/PB: MISCELLANEOUS Component of Large copper jumper wire 160 Sq.mm | 6 Numbers | ₹318 | ₹1,908 |
| 112Supply: 1. Contact wire Parallel Clamp (Small)1041-2, Spec.No. ETI/OHE/P/1040-2 Rev-E. | 20 Numbers | ₹196 | ₹3,920 |
| 113Supply: MISCELLANEOUS 2. 1030-2 | 20 Numbers | ₹224 | ₹4,480 |
| 114Supply: MISCELLANEOUS 3. 1050-3 | 20 Numbers | ₹258 | ₹5,160 |
| 115Supply: MISCELLANEOUS 4. 1030-3 | 20 Numbers | ₹200.60 | ₹4,012 |
| 116Supply: MISCELLANEOUS 5. 1551 | 10 Numbers | ₹513 | ₹5,130 |
| 117Supply: MISCELLANEOUS 6. cat end fitting 65 sqmm | 4 Numbers | ₹554 | ₹2,216 |
| 118Supply: MISCELLANEOUS 7. cat splice 65 sqmm | 4 Numbers | ₹559 | ₹2,236 |
| 119Supply:8.MISCELLANEOUS Contact wire splice (Toothed type) | 4 Numbers | ₹1,292 | ₹5,168 |
| 120Supply: MISCELLANEOUS: 10.Feeder strain clamp-1600 | 10 Each Span | ₹1,879 | ₹18,790 |
| 121Erection: MISCELLANEOUS Handling,leading ,loading and transportation charges for Railway supply materials from diffrent railway site and released materails from diffrent railway site ,if any tothe concerned depot | 1.50 MT | ₹11,517.70 | ₹17,276.55 |
| 122Supply: MISCELLANEOUS Battery operated Impact Wrench Tool holder 1/2 inch external square with one number of spare battery as per specification No load speed: 0-1900rpm, Max. Torque: 650 Nm, Impact rate: 0-2100 BPM, Battery voltage: 18V, Screw diameter: M12-M20. Make: BOSCH or similar as per specification in model : GDS 18V-LI HT 250 model | 3 Each | ₹25,960 | ₹77,880 |
| Schedule B · AAL: Extension of DE Up loopL/7 at KTE end with dispatch facilty to 03rd line for long haul formation & goods parking line alongwith pathway & lighting facility. | |||
| 1Supply: DESIGN & DRAWING (a) Preparation & supply of GAD sectiondiagram,LOP & CSD | 0.75 Per Track KM | ₹9,056 | ₹6,792 |
| 2Supply: DESIGN & DRAWING (b) Preparation & supply of SED & as erected drawing | 0.75 Per Track KM | ₹8,355 | ₹6,266.25 |
| 3Erection: MAST & FOUNDATION (a) in Hard soil | 10 cum | ₹8,227 | ₹82,270 |
| 4Erection:MAST & FOUNDATION (b) in Rocky soil | 10 cum | ₹8,551 | ₹85,510 |
| 5Erection: MAST & FOUNDATION (c) in other than Hard and Rocky soil | 122.50 cum | ₹7,060 | ₹8,64,850 |
| 6Supply: MAST & FOUNDATION Galvanised Traction Mast (Rolled or Fabricated) | 18.60 MT | ₹1,29,959 | ₹24,16,802.04 |
| 7Erection/NP: MAST & FOUNDATION Galvanised Traction Mast (Rolled or Fabricated) | 10 MT | ₹5,842 | ₹58,420 |
| 8Erection/PB: MAST & FOUNDATION Galvanised Traction Mast (Rolled or Fabricated) | 8.60 MT | ₹11,683 | ₹1,00,434.66 |
| 9Supply: FIXTURES Fabricated Steel work other than Mast (including super masts for feeder wire) | 3 MT | ₹1,30,946 | ₹3,92,838 |
| 10Erection/NP: FIXTURES Fabricated Steel work other than Mast (including super masts for feeder wire) | 2.50 MT | ₹7,619 | ₹19,047.50 |
| 11Erection/PB: FIXTURES Fabricated Steel work other than Mast (including super masts for feeder wire) | 0.50 MT | ₹15,155 | ₹7,577.50 |
| 12Supply: FIXTURES Supply of GI fastners | 1.20 MT | ₹1,38,875 | ₹1,66,650 |
| 13Supply: CANTILEVER & INSULATORS (a) Single Bracket assembly for Conventional OHE with SPS | 45 Numbers | ₹21,366 | ₹9,61,470 |
| 14Erection/NP: CANTILEVER & INSULATORS a) Single Bracket assembly for Conventional OHE with SPS | 35 Numbers | ₹1,053 | ₹36,855 |
| 15Erection/PB: CANTILEVER & INSULATORS a) Single Bracket assembly for Conventional OHE with SPS | 10 Numbers | ₹2,080 | ₹20,800 |
| 16Supply: INSULATORS & COMPONENTS Stay Arm Insulator | 45 Numbers | ₹5,147 | ₹2,31,615 |
| 17Supply: INSULATORS & COMPONENTS Bracket Insulator | 45 Numbers | ₹5,060 | ₹2,27,700 |
| 18Supply: INSULATORS & COMPONENTS b) Assorted Components for conventional OHE | 1.50 Kilometre | ₹69,273 | ₹1,03,909.50 |
| 19Erection/NP: INSULATORS & COMPONENTS OHE (Conventional) | 1 Kilometre | ₹42,784 | ₹42,784 |
| 20Erection/PB: INSULATORS & COMPONENTS OHE (Conventional) | 0.50 Kilometre | ₹85,568 | ₹42,784 |
| 21Supply: INSULATORS & COMPONENTS Extra on item E3,E4 &E5 for Supply and Erecrion of additional fitting at a turnout Diamand Crossing or Overlap V | 4 Numbers | ₹3,499 | ₹13,996 |
| 22Erection/PB: INSULATORS & COMPONENTS Extra on item E3,E4 &E5 for Supply and Erecrion of additional fitting at a turnout Diamand Crossing or Overlap | 4 Numbers | ₹1,865 | ₹7,460 |
| 23Supply: INSULATORS & COMPONENTS Solid Core Cut-in-Insulator a) (i) 9 Ton Insulator | 4 Numbers | ₹7,489 | ₹29,956 |
| 24Supply: INSULATORS & COMPONENTS Solid Core Cut-in-Insulator (ii) Component | 4 Set | ₹1,982 | ₹7,928 |
| 25Erection/NP: INSULATORS & COMPONENTS Solid Core Cut-in-Insulator (b) Erection | 2 Set | ₹1,305 | ₹2,610 |
| 26Erection/PB: INSULATORS & COMPONENTS Solid Core Cut-in-Insulator ( b) Erection | 2 Set | ₹2,611 | ₹5,222 |
| 27Supply: INSULATORS & COMPONENTS Section Insulator assembly (for Con. OHE) (a) (i) 9 Ton Insulator | 1 Numbers | ₹7,610 | ₹7,610 |
| 28Supply: INSULATORS & COMPONENTS Section Insulator assembly (for Con. OHE) (ii) S / I assembly | 1 Numbers | ₹49,154 | ₹49,154 |
| 29Supply: INSULATORS & COMPONENTS Section Insulator assembly (for Con. OHE) (iii) Core Insulator | 1 Numbers | ₹9,011 | ₹9,011 |
| 30Erection/PB: INSULATORS & COMPONENTS Section Insulator assembly (for Con. OHE) b) Erection | 1 Numbers | ₹7,563 | ₹7,563 |
| 31Supply: RC FEEDERS & INSULATORS 25 KV Alluminium Feeder / Return Conductor (Single Spider) | 1 Kilometre | ₹4,59,626 | ₹4,59,626 |
| 32Erection/PB: RC FEEDERS & INSULATORS 25 KV Alluminium Feeder / Return Conductor (Single Spider) | 1 Kilometre | ₹66,163 | ₹66,163 |
| 33Supply: RC FEEDERS & INSULATORS Solid Core Suspension Insulator a) (i) 9 Ton Insulator | 16 Numbers | ₹7,924 | ₹1,26,784 |
| 34Supply: RC FEEDERS & INSULATORS Solid Core Suspension Insulator (ii) Component | 16 Set | ₹2,407 | ₹38,512 |
| 35Erection/NP: RC FEEDERS & INSULATORS Solid Core Suspension Insulator b) Erection | 8 Set | ₹974 | ₹7,792 |
| 36Erection/PB: RC FEEDERS & INSULATORS Solid Core Suspension Insulator b) Erection | 8 Set | ₹1,911 | ₹15,288 |
| 37Supply: TERMINATION (a) Guy Rod assembly including Mast Anchor / Guy Rod attachment | 7 Set | ₹11,416 | ₹79,912 |
| 38Erection/NP: TERMINATION (a) Guy Rod assembly including Mast Anchor / Guy Rod attachment | 4 Set | ₹921 | ₹3,684 |
| 39Erection/PB: TERMINATION (a) Guy Rod assembly including Mast Anchor / Guy Rod attachment | 3 Set | ₹1,833 | ₹5,499 |
| 40Supply: TERMINATION (b) BC Anchor loop | 5 Numbers | ₹1,224 | ₹6,120 |
| 41Supply: TERMINATION Regulating Equipment 3 Pulley type with Counter Weight assembly, guide tube for Conventional OHE | 5 Set | ₹1,12,008 | ₹5,60,040 |
| 42Erection/NP: TERMINATION Regulating Equipment 3 Pulley type with Counter Weight assembly, guide tube for Conventional OHE | 3 Set | ₹3,499 | ₹10,497 |
| 43Erection/PB: TERMINATION Regulating Equipment 3 Pulley type with Counter Weight assembly, guide tube for Conventional OHE | 2 Set | ₹6,998 | ₹13,996 |
| 44Supply: TERMINATION Termination of Double Conductor of OHE a) (i) 9 Ton Insulator | 7 Numbers | ₹7,252 | ₹50,764 |
| 45Supply: TERMINATION Termination of Double Conductor of OHE (ii) Component | 7 Numbers | ₹11,267 | ₹78,869 |
| 46Erection/NP: TERMINATION Termination of Double Conductor of OHE (b) Erection | 2 Numbers | ₹1,055 | ₹2,110 |
| 47Erection/PB: TERMINATION Termination of Double Conductor of OHE b) Erection | 5 Numbers | ₹2,073 | ₹10,365 |
| 48Supply: TERMINATION Termination of 25 KV Alluminium Feeder / Return Conductor (Single Spider) a) (i) 9 Ton Insulator | 2 Numbers | ₹7,861 | ₹15,722 |
| 49Supply: TERMINATION Termination of 25 KV Alluminium Feeder / Return Conductor (Single Spider) (ii) Component | 2 Numbers | ₹7,402 | ₹14,804 |
| 50Erection/PB: TERMINATION Termination of 25 KV Alluminium Feeder / Return Conductor (Single Spider) b) Erection | 2 Numbers | ₹2,585 | ₹5,170 |
| 51Supply: TERMINATION 25 Kv Post Insulator a) (i) Post Insulator | 4 Numbers | ₹8,463 | ₹33,852 |
| 52Supply: TERMINATION 25 Kv Post Insulator (ii) Component | 4 Numbers | ₹780 | ₹3,120 |
| 53Erection/NP: TERMINATION 25 Kv Post Insulator b) Erection | 2 Numbers | ₹697 | ₹1,394 |
| 54Erection/PB: TERMINATION 25 Kv Post Insulator b) Erection | 2 Numbers | ₹1,298 | ₹2,596 |
| 55Supply: BONDS Structure Bondof Avg length 3.25 mtrs including fastners | 37 Each | ₹466 | ₹17,242 |
| 56Erection: BONDS Structure Bondof Avg length 3.25 mtrs including fastners | 37 Each | ₹62 | ₹2,294 |
| 57Supply: BONDS Longitudinal Bond of length 4.50 mtrs for cross over point including fatners | 10 Each | ₹617 | ₹6,170 |
| 58Erection: BONDS Longitudinal Bond of length 4.50 mtrs for cross over point including fatners | 10 Each | ₹180 | ₹1,800 |
| 59Supply: BONDS Transverse/Special Bondf Avg length 3.25 mtrs inclduing Pvc Sleeve and fastners | 4 Each | ₹492 | ₹1,968 |
| 60Erection: BONDS Transverse/Special Bondf Avg length 3.25 mtrs inclduing Pvc Sleeve and fastners | 4 Each | ₹73 | ₹292 |
| 61Supply: NUMBER PLATE & CAUTION BOARDS Number Plate Retro reflective type (Mast / Structure) | 37 Numbers | ₹485 | ₹17,945 |
| 62Erection/NP: NUMBER PLATE & CAUTION BOARDS Number Plate Retro reflective type (Mast / Structure) | 37 Numbers | ₹120 | ₹4,440 |
| 63Supply: NUMBER PLATE & CAUTION BOARDS Caution Board for 25 KV Traction | 20 Numbers | ₹370 | ₹7,400 |
| 64Erection/NP: NUMBER PLATE & CAUTION BOARDS Caution Board for 25 KV Traction | 20 Numbers | ₹119 | ₹2,380 |
| 65Supply: NUMBER PLATE & CAUTION BOARDS Danger Board for 25 KV Traction | 20 Numbers | ₹370 | ₹7,400 |
| 66Erection/NP: NUMBER PLATE & CAUTION BOARDS Danger Board for 25 KV Traction | 20 Numbers | ₹119 | ₹2,380 |
| 67Supply: NUMBER PLATE & CAUTION BOARDS Public Caution Board | 20 Numbers | ₹370 | ₹7,400 |
| 68Erection/NP: NUMBER PLATE & CAUTION BOARDS Public Caution Board | 20 Numbers | ₹119 | ₹2,380 |
| 69Supply: NUMBER PLATE & CAUTION BOARDSElect. Engine Stop Board | 20 Numbers | ₹1,033 | ₹20,660 |
| 70Erection/NP: NUMBER PLATE & CAUTION BOARDS Elect. Engine Stop Board | 20 Numbers | ₹254 | ₹5,080 |
| 71Supply: NUMBER PLATE & CAUTION BOARDSWorking limit Board (Power Block) | 2 Numbers | ₹370 | ₹740 |
| 72Erection/NP: NUMBER PLATE & CAUTION BOARDS Working limit Board (Power Block) | 2 Numbers | ₹119 | ₹238 |
| 73Supply: NUMBER PLATE & CAUTION BOARDSSectioning Diagram Board | 1 Numbers | ₹11,293 | ₹11,293 |
| 74Erection/NP: NUMBER PLATE & CAUTION BOARDS Sectioning Diagram Board | 1 Numbers | ₹1,130 | ₹1,130 |
| 75Erection NPB: NUMBER PLATE & CAUTION BOARDS Modififcation to section diagram at stations and TPC | 1 Numbers | ₹2,946 | ₹2,946 |
| 76Under PB: MODIFICATION WORK Modification to Erected Equipments (a) Transfer of Equipment from one Mast/support to another | 10 Numbers | ₹7,011 | ₹70,110 |
| 77Supply: MODIFICATION WORK Modification to Erected Equipment (b) Splicing and Extension of Anchored OHE including PVC Sleeve under ROB | 6 Numbers | ₹4,414 | ₹26,484 |
| 78Erection/PB: MODIFICATION WORK Modification to Erected Equipments (b) Splicing and Extension of Anchored OHE including PVC Sleeve under ROB | 6 Numbers | ₹12,445 | ₹74,670 |
| 79NPB: DISMANTALING WORK Dismantaling of Mast/Structure upright | 6 Numbers | ₹3,779 | ₹22,674 |
| 80PB: DISMANTALING WORK Dismantaling of Mast/Structure upright | 6 Numbers | ₹7,345 | ₹44,070 |
| 81NPB: DISMANTALING WORK Dismantaling of Cantilever | 6 Numbers | ₹913 | ₹5,478 |
| 82PB:DISMANTALING WORK Dismantaling of Cantilever | 4 Numbers | ₹1,802 | ₹7,208 |
| 83PB: DISMANTALING WORK Dismantaling of TTC Boom | 1 Numbers | ₹11,178 | ₹11,178 |
| 84NPB: DISMANTALING WORK Dismantaling of Guy rod assembly | 1 Numbers | ₹846 | ₹846 |
| 85PB: DISMANTALING WORK Dismantaling of Guy rod assembly | 1 Numbers | ₹1,662 | ₹1,662 |
| 86NPB: DISMANTALING WORK Dismantaling of Regulating Equipment with Counter Weight assembly | 1 Numbers | ₹3,388 | ₹3,388 |
| 87PB:DISMANTALING WORK Dismantaling of Regulating Equipment with Counter Weight assembly | 1 Numbers | ₹6,776 | ₹6,776 |
| 88PB:DISMANTALING WORK Dismantaling of Small Steel parts | 1 MT | ₹8,548 | ₹8,548 |
| 89PB:DISMANTALING WORK Dismantaling of Dismantling of termination | 2 Numbers | ₹10,843 | ₹21,686 |
| 90Supply: MISCELLANEOUS Large span wire (130 /Sq.mm) | 450 Metre | ₹1,204 | ₹5,41,800 |
| 91Erection/PB:MISCELLANEOUS Large span wire (130 /Sq.mm) | 450 Metre | ₹154 | ₹69,300 |
| 92Supply: MISCELLANEOUS (e) Large Jumper Wire (105 Sq.mm) | 8 Metre | ₹1,042 | ₹8,336 |
| 93Supply: MISCELLANEOUS f) Small Jumper Wire (50 Sq.mm) | 24 Metre | ₹485 | ₹11,640 |
| 94Supply: MISCELLANEOUS Hard drawn conductor for cross feeder 150 Sq.mm (37/2.25 mm) | 240 Metre | ₹1,320.42 | ₹3,16,900.80 |
| 95Sypply: MISCELLANEOUS Componant of termination of 130/150 Sq.mm cross feeder w | 14 Numbers | ₹5,776.05 | ₹80,864.70 |
| 96Erection/PB: MISCELLANEOUS Componant of termination of 130/150 Sq.mm cross feeder wire | 14 Numbers | ₹1,810.18 | ₹25,342.52 |
| 97Supply: MISCELLANEOUS 1. Contact wire Parallel Clamp (Small)1041-2, Spec.No. ETI/OHE/P/1040-2 Rev-E. | 20 Numbers | ₹196 | ₹3,920 |
| 98Supply: MISCELLANEOUS 2. 1030-2 | 20 Numbers | ₹224 | ₹4,480 |
| 99Supply: MISCELLANEOUS 3. 1050-3 | 20 Numbers | ₹258 | ₹5,160 |
| 100Supply: MISCELLANEOUS 4. 1030-3 | 20 Numbers | ₹200.60 | ₹4,012 |
| 101Supply: MISCELLANEOUS 5. 1551 | 10 Numbers | ₹513 | ₹5,130 |
| 102Supply: MISCELLANEOUS 6. cat end fitting 65 sqmm | 4 Numbers | ₹554 | ₹2,216 |
| 103Supply: MISCELLANEOUS 7. cat splice 65 sqmm | 4 Numbers | ₹559 | ₹2,236 |
| 104Supply: MISCELLANEOUS 8. Contact wire splice (Toothed yep) | 4 Numbers | ₹1,292 | ₹5,168 |
| 105Supply: MISCELLANEOUS "14.Supply of Compression Joint RI- 1610-1 Spec: _SPC_OHE_Fittings_0130_with A_C_Slip_No_1,Drw: ETI OHE P 1610-1, STR: CORE-STR-16." | 50 Each | ₹1,534 | ₹76,700 |
| 106erection: MISCELLANEOUS Handling,leading ,loading and transportation charges for Railway supply materials from diffrent railway site and released materails from diffrent railway site ,if any tothe concerned depot | 1.50 MT | ₹11,517.69 | ₹17,276.53 |
| 107Supply: MISCELLANEOUS Battery operated Rail core drill machine | 2 Each | ₹1,17,998.82 | ₹2,35,997.64 |
| 108Erection/PB: MODIFICATION WORK ( e) Adjustment of existing OHE with Tower wagon checking | 20 Each Span | ₹1,648 | ₹32,960 |
| Schedule C · LOA- Construction of Dn long haul loop (CAL-1500m) by extending DE of existing Dn loop line no.-1 at KTE end with reception facility. | |||
| 1Erection: DESIGN & DRAWING (a) Preparation & supply of GAD ,sectiondiagram,LOP & CSD | 1.58 Per Track KM | ₹9,056 | ₹14,308.48 |
| 2Erection: DESIGN & DRAWING DESIGN & DRAWING (b) Preparation & supply of SED & as erected drawing | 1.59 Per Track KM | ₹8,355 | ₹13,267.74 |
| 3Erection:MAST & FOUNDATION Concrete for Foundation & Plinth (a) in Hard soil | 20 cum | ₹8,227 | ₹1,64,540 |
| 4Erection: MAST & FOUNDATION Concrete for Foundation & Plinth (b) in Rocky soil | 47 cum | ₹8,551 | ₹4,01,897 |
| 5Erection: MAST & FOUNDATION Concrete for Foundation & Plinth c) in other than Hard and Rocky soil | 100 cum | ₹7,060 | ₹7,06,000 |
| 6Supply: MAST & FOUNDATION Concrete for Foundation & Plinth Galvanised Traction Mast (Rolled or Fabricated) | 23.18 MT | ₹1,29,959 | ₹30,11,929.78 |
| 7Erection/NPB: MAST & FOUNDATION Concrete for Foundation & Plinth Galvanised Traction Mast (Rolled or Fabricated) | 15 MT | ₹5,842 | ₹87,630 |
| 8Erection/PB: MAST & FOUNDATION Concrete for Foundation & Plinth Galvanised Traction Mast (Rolled or Fabricated) | 8.18 MT | ₹11,683 | ₹95,520.21 |
| 9Supply: Portal structure b) Drop Arms complete set | 0.48 MT | ₹1,26,228 | ₹60,589.44 |
| 10Erection/PB: Portal structure b) Drop Arms complete set | 0.48 MT | ₹20,777 | ₹9,972.96 |
| 11Supply: Portal structure T.T.C. complete | 2.52 MT | ₹1,24,485 | ₹3,13,702.20 |
| 12Erection/PB: Portal structure T.T.C. complete | 2.52 MT | ₹21,780 | ₹54,885.60 |
| 13Supply: FIXTURES Fabricated Steel work other than Mast (including super masts for feeder wire) | 3 MT | ₹1,30,946 | ₹3,92,838 |
| 14Erection/NPB: FIXTURES Fabricated Steel work other than Mast (including super masts for feeder wire) | 1.50 MT | ₹7,619 | ₹11,428.50 |
| 15Erection/PB: FIXTURES Fabricated Steel work other than Mast (including super masts for feeder wire) | 1.50 MT | ₹15,155 | ₹22,732.50 |
| 16Supply: FIXTURES Supply of GI fastners | 1.20 MT | ₹1,38,875 | ₹1,66,650 |
| 17Supply: CANTILEVER & INSULATORS a) Single Bracket assembly for Conventional OHE with SPS | 42 Numbers | ₹21,366 | ₹8,97,372 |
| 18Erection/NPB: CANTILEVER & INSULATORS a) Single Bracket assembly for Conventional OHE with SPS | 30 Numbers | ₹1,053 | ₹31,590 |
| 19Erection/PB: CANTILEVER & INSULATORS a) Single Bracket assembly for Conventional OHE with SPS | 12 Numbers | ₹2,080 | ₹24,960 |
| 20Supply: INSULATORS & COMPONENTS Stay Arm Insulator | 42 Numbers | ₹5,147 | ₹2,16,174 |
| 21Supply: INSULATORS & COMPONENTS Bracket Insulator | 42 Numbers | ₹5,060 | ₹2,12,520 |
| 22Supply: INSULATORS & COMPONENTS b) Assorted Components for conventional OHE | 1.95 Kilometre | ₹69,273 | ₹1,35,359.44 |
| 23Erection/NPB: ii) Erection of OHE OHE (Conventional) | 1 Kilometre | ₹42,784 | ₹42,784 |
| 24Erection/PB: ii) Erection of OHE OHE (Conventional) | 0.95 Kilometre | ₹85,568 | ₹81,631.87 |
| 25Supply: INSULATORS & COMPONENTS: Extra on item 22, 23 & 24 for Supply and Erecrion of additional fitting at a turnout Diamand Crossing or Overlap | 2 Numbers | ₹3,499 | ₹6,998 |
| 26Erection/PB: INSULATORS & COMPONENTS Extra on item E3,E4 &E5 for Supply and Erecrion of additional fitting at a turnout Diamand Crossing or Overlap | 2 Numbers | ₹1,865 | ₹3,730 |
| 27Supply: INSULATORS & COMPONENTS Section Insulator assembly (for Con. OHE) a) (i) 9 Ton Insulator | 1 Numbers | ₹7,610 | ₹7,610 |
| 28Supply: CANTILEVER & INSULATORS Section Insulator assembly (for Con. OHE) (ii) S / I assembly | 1 Numbers | ₹49,154 | ₹49,154 |
| 29Supply: INSULATORS & COMPONENTS Section Insulator assembly (for Con. OHE) (iii) Core Insulator | 1 Numbers | ₹9,011 | ₹9,011 |
| 30Erection/PB: INSULATORS & COMPONENTS Section Insulator assembly (for Con. OHE) (b) Erection | 1 Numbers | ₹7,563 | ₹7,563 |
| 31Supply: TERMINATION (a) Guy Rod assembly including Mast Anchor / Guy Rod attachment | 8 Set | ₹11,416 | ₹91,328 |
| 32Erection/NPB: TERMINATION (a) Guy Rod assembly including Mast Anchor / Guy Rod attachment | 4 Set | ₹921 | ₹3,684 |
| 33Erection/PB: TERMINATION (a) Guy Rod assembly including Mast Anchor / Guy Rod attachment | 4 Set | ₹1,833 | ₹7,332 |
| 34Supply: TERMINATION (b) BC Anchor loop | 5 Numbers | ₹1,224 | ₹6,120 |
| 35Supply: TERMINATION Regulating Equipment 3 Pulley type with Counter Weight assembly, guide tube for Conventional OHE | 4 Set | ₹1,12,008 | ₹4,48,032 |
| 36Erection/NPB: TERMINATION Regulating Equipment 3 Pulley type with Counter Weight assembly, guide tube for Conventional OHE | 1 Set | ₹3,499 | ₹3,499 |
| 37Erection/PB: TERMINATION Regulating Equipment 3 Pulley type with Counter Weight assembly, guide tube for Conventional OHE | 3 Set | ₹6,998 | ₹20,994 |
| 38Supply: TERMINATION Termination of Double Conductor of OHE a) (i) 9 Ton Insulator | 6 Numbers | ₹7,252 | ₹43,512 |
| 39Supply: TERMINATION Termination of Double Conductor of OHE (ii) Component | 6 Numbers | ₹11,267 | ₹67,602 |
| 40Erection/NPB: TERMINATION Termination of Double Conductor of OHE b) Erection | 1 Numbers | ₹1,055 | ₹1,055 |
| 41Erection/PB: TERMINATION Termination of Double Conductor of OHE b) Erection | 3 Numbers | ₹2,073 | ₹6,219 |
| 42Supply: TERMINATION Anti Creep with Cadmium Copper Catenary Wire a) (i) 9 Ton Insulator | 2 Numbers | ₹7,156 | ₹14,312 |
| 43Supply: TERMINATION Anti Creep with Cadmium Copper Catenary Wire (ii) Component | 2 Set | ₹15,848 | ₹31,696 |
| 44Erection/PB: TERMINATION Anti Creep with Cadmium Copper Catenary Wire b) Erection | 1 Set | ₹11,176 | ₹11,176 |
| 45Supply: TERMINATION 25 Kv Post Insulator (a) (i) Post Insulator | 4 Numbers | ₹8,463 | ₹33,852 |
| 46Supply: TERMINATION 25 Kv Post Insulator (ii) Component | 4 Numbers | ₹780 | ₹3,120 |
| 47Erection/NPB: TERMINATION 25 Kv Post Insulator b) Erection | 2 Numbers | ₹697 | ₹1,394 |
| 48Erection/PB: TERMINATION 25 Kv Post Insulator b) Erection | 2 Numbers | ₹1,298 | ₹2,596 |
| 49Supply: TERMINATION 25 KV Single Pole Isolator 1600A Amps.Including Tie Rod Insulator and pedestal insulator | 1 Numbers | ₹61,846 | ₹61,846 |
| 50Erection/PB: TERMINATION 25 KV Single Pole Isolator 1600A Amps.Including Tie Rod Insulator and pedestal insulator | 1 Numbers | ₹7,193 | ₹7,193 |
| 51supply: TERMINATION Supply of copper bus bar 18mm | 3 Metre | ₹2,840 | ₹8,520 |
| 52erection : Supply and erection of soli copper Bus Bar connectors : Bus terminal 6310 | 2 Each | ₹2,842 | ₹5,684 |
| 53erection : TERMINATION Supply and erection of TERMINAL connectors of jumper : 1009 | 4 Each | ₹1,273 | ₹5,092 |
| 54Supply : BONDS Structure Bondof Avg length 3.25 mtrs including fastners | 36 Each | ₹466 | ₹16,776 |
| 55Erection: BONDS Structure Bondof Avg length 3.25 mtrs including fastners | 36 Each | ₹62 | ₹2,232 |
| 56Supply : BONDS Longitudinal Bond of length 4.50 mtrs for cross over point including fatners | 10 Each | ₹617 | ₹6,170 |
| 57Erection: BONDS Longitudinal Bond of length 4.50 mtrs for cross over point including fatners | 10 Each | ₹180 | ₹1,800 |
| 58Supply: BONDS Transverse/Special Bondf Avg length 3.25 mtrs inclduing Pvc Sleeve and fastners | 4 Each | ₹492 | ₹1,968 |
| 59Erection: BONDS Transverse/Special Bondf Avg length 3.25 mtrs inclduing Pvc Sleeve and fastners | 4 Each | ₹73 | ₹292 |
| 60Supply: NUMBER PLATE & CAUTION BOARDS Number Plate Retro reflective type (Mast / Structure) | 36 Numbers | ₹485 | ₹17,460 |
| 61Erection/NPB: NUMBER PLATE & CAUTION BOARDSNumber Plate Retro reflective type (Mast / Structure) | 36 Numbers | ₹120 | ₹4,320 |
| 62Supply: NUMBER PLATE & CAUTION BOARDS Caution Board for 25 KV Traction | 50 Numbers | ₹370 | ₹18,500 |
| 63Erection/NPB: NUMBER PLATE & CAUTION BOARDS Caution Board for 25 KV Traction | 50 Numbers | ₹119 | ₹5,950 |
| 64Supply: NUMBER PLATE & CAUTION BOARDSDanger Board for 25 KV Traction | 50 Numbers | ₹370 | ₹18,500 |
| 65Erection/NPB: NUMBER PLATE & CAUTION BOARDSDanger Board for 25 KV Traction | 50 Numbers | ₹119 | ₹5,950 |
| 66Supply: NUMBER PLATE & CAUTION BOARDSPublic Caution Board | 50 Numbers | ₹370 | ₹18,500 |
| 67Erection/NPB: NUMBER PLATE & CAUTION BOARDS Public Caution Board | 50 Numbers | ₹119 | ₹5,950 |
| 68Supply: NUMBER PLATE & CAUTION BOARDS Elect. Engine Stop Board | 50 Numbers | ₹1,033 | ₹51,650 |
| 69Erection/NPB: NUMBER PLATE & CAUTION BOARDS Elect. Engine Stop Board | 50 Numbers | ₹254 | ₹12,700 |
| 70Supply: NUMBER PLATE & CAUTION BOARDS Working limit Board (Power Block) | 50 Numbers | ₹370 | ₹18,500 |
| 71Erection/NPB: NUMBER PLATE & CAUTION BOARDS Working limit Board (Power Block) | 50 Numbers | ₹119 | ₹5,950 |
| 72Supply: NUMBER PLATE & CAUTION BOARDS Sectioning Diagram Board | 1 Numbers | ₹11,293 | ₹11,293 |
| 73Erection/NPB: NUMBER PLATE & CAUTION BOARDS Sectioning Diagram Board | 1 Numbers | ₹1,130 | ₹1,130 |
| 74Erection NPB: NUMBER PLATE & CAUTION BOARDS Modififcation to section diagram at stations and TPC | 1 Numbers | ₹2,946 | ₹2,946 |
| 75Under PB: MODIFICATION WORK Modification to Erected Equipments (a) Transfer of Equipment from one Mast/support to another | 4 Numbers | ₹7,011 | ₹28,044 |
| 76Supply: MODIFICATION WORK Modification to Erected Equipments (b) Splicing and Extension of Anchored OHE including PVC Sleeve under ROB | 4 Numbers | ₹4,414 | ₹17,656 |
| 77Erection/PB: MODIFICATION WORK Modification to Erected Equipments (b) Splicing and Extension of Anchored OHE including PVC Sleeve under ROB | 4 Numbers | ₹12,445 | ₹49,780 |
| 78Erection/NPB :MODIFICATION WORK Modification to Erected Equipments (e) Adjustment of existing OHE with Tower wagon checking | 34 Each Span | ₹824 | ₹28,016 |
| 79Erection/PB: MODIFICATION WORK Modification to Erected Equipments e) Adjustment of existing OHE with Tower wagon checking | 34 Each Span | ₹1,648 | ₹56,032 |
| 80NPB:DISMANTALING WORK Dismantaling of Mast/Structure upright | 2 Numbers | ₹3,779 | ₹7,558 |
| 81PB:DISMANTALING WORK Dismantaling of Mast/Structure upright | 2 Numbers | ₹7,345 | ₹14,690 |
| 82PB:DISMANTALING WORK Dismantaling of Cantilever | 4 Numbers | ₹1,802 | ₹7,208 |
| 83PB:DISMANTALING WORK Dismantaling of section insulator | 1 Numbers | ₹6,655 | ₹6,655 |
| 84NPB: DISMANTALING WORK Dismantaling of Guy rod assembly | 1 Numbers | ₹846 | ₹846 |
| 85PB: DISMANTALING WORK Dismantaling of Guy rod assembly | 1 Numbers | ₹1,662 | ₹1,662 |
| 86Supply: MISCELLANEOUS Large span wire (130 /Sq.mm) | 150 Metre | ₹1,204 | ₹1,80,600 |
| 87Erection/PB: MISCELLANEOUS Large span wire (130 /Sq.mm) | 150 Metre | ₹154 | ₹23,100 |
| 88Supply: MISCELLANEOUS c) Dropper Wire (5mm) | 800 Metre | ₹183 | ₹1,46,400 |
| 89Supply: MISCELLANEOUS e) Large Jumper Wire (105 Sq.mm) | 8 Metre | ₹1,042 | ₹8,336 |
| 90Supply: MISCELLANEOUS (f) Small Jumper Wire (50 Sq.mm) | 24 Metre | ₹485 | ₹11,640 |
| 91Supply: MISCELLANEOUS Large copper jumper wire 160 Sq.mm | 20 Metre | ₹1,487 | ₹29,740 |
| 92Supply:MISCELLANEOUS Component of Large copper jumper wire 160 Sq.mm | 2 Numbers | ₹6,203 | ₹12,406 |
| 93Erection/PB: MISCELLANEOUS Component of Large copper jumper wire 160 Sq.mm | 2 Numbers | ₹318 | ₹636 |
| 94Supply: MISCELLANEOUS 1. Contact wire Parallel Clamp (Small)1041-2, Spec.No. ETI/OHE/P/1040-2 Rev-E. | 40 Numbers | ₹196 | ₹7,840 |
| 95Supply: MISCELLANEOUS 2. 1030-2 | 40 Numbers | ₹224 | ₹8,960 |
| 96Supply: MISCELLANEOUS 3. 1050-3 | 40 Numbers | ₹258 | ₹10,320 |
| 96Supply: MISCELLANEOUS 4. 1030-3 | 40 Numbers | ₹200.60 | ₹8,024 |
| 97Supply: MISCELLANEOUS 5. 1551 | 40 Numbers | ₹513 | ₹20,520 |
| 98Supply: MISCELLANEOUS 6. cat end fitting 65 sqmm | 4 Numbers | ₹554 | ₹2,216 |
| 99Supply: MISCELLANEOUS 7. cat splice 65 sqmm | 4 Numbers | ₹559 | ₹2,236 |
| 100Supply: MISCELLANEOUS 8. Contact wire splice (Toothed yep) | 4 Numbers | ₹1,292 | ₹5,168 |
| 101Supply: MISCELLANEOUS 11.Video camera for OHE monitoring system with specification as per Annexure-A. | 1 Each | ₹1,57,908.78 | ₹1,57,908.78 |
| 102Supply: MISCELLANEOUS "12. LaserJet Multi Function Printer; print, copy & scan, compact durable, Accepted Make/Brand:- HP LaserJet 126A." | 2 Each | ₹24,689.99 | ₹49,379.98 |
| 103erection : MISCELLANEOUS Handling,leading ,loading and transportation charges for Railway supply materials from diffrent railway site and released materails from diffrent railway site ,if any tothe concerned depot | 1.50 MT | ₹11,517.69 | ₹17,276.53 |
| 104Supply: MISCELLANEOUS Battery operated Rail core drill machine | 2 Each | ₹1,17,998.82 | ₹2,35,997.64 |
| Total | ₹2,92,28,589.17 | ||
Bids quote a percentage above, below or at par with these rates · The total matches the advertised value.
Documents
23 files- PDFNotice inviting tenderviewNitPdf_5561100.pdf (opens in a new tab)
- PDFExplanatory NoteExplanatoryNote322.pdfNo direct link in the notice; see the notice, page 20
- PDFProformaProforma.pdfNo direct link in the notice; see the notice, page 20
- PDFACS 1113.03.2026ACS11_compressed.pdfNo direct link in the notice; see the notice, page 20
- PDFACS 12GCCACS1212.08.26_compressed.pdfNo direct link in the notice; see the notice, page 20
- PDFGeneral instruction and spl condGeneralinstructionandspecialcondition.pdfNo direct link in the notice; see the notice, page 20
- PDFRDSO SpecificationsAllRDSOTRDspecifications.pdfNo direct link in the notice; see the notice, page 20
- PDFList of Drawingsmaster_list_of_drawings_TI_compressed.pdfNo direct link in the notice; see the notice, page 20
- PDFGCC 2022GCC_April-2022_1.pdfNo direct link in the notice; see the notice, page 20
- PDFACS 1GCCACS1.pdfNo direct link in the notice; see the notice, page 20
- PDFACS 2GCCACS-2.pdfNo direct link in the notice; see the notice, page 20
- PDFACS 3GCCACS-3.pdfNo direct link in the notice; see the notice, page 20
- PDFACS 4GCCACS4.pdfNo direct link in the notice; see the notice, page 20
- PDFACS 5GCCACS5.pdfNo direct link in the notice; see the notice, page 20
- PDFACS 6GCCACS6.pdfNo direct link in the notice; see the notice, page 20
- PDFACS 7GCCACS7latest.pdfNo direct link in the notice; see the notice, page 20
- PDFACS 8GCCACS8.pdfNo direct link in the notice; see the notice, page 20
- PDFACS 9GCCACS9.pdfNo direct link in the notice; see the notice, page 20
- PDFACS 10GCCACS10.pdfNo direct link in the notice; see the notice, page 20
- PDFTender form 1st sheetTenderformfirstsheet.pdfNo direct link in the notice; see the notice, page 20
- PDFTender form 2nd sheetTenderformsecondsheet.pdfNo direct link in the notice; see the notice, page 20
- PDFTender form 3rd sheetTenderformthirdsheet.pdfNo direct link in the notice; see the notice, page 20
- PDFAnnexure-V(A)Annexure-V(A).pdf (opens in a new tab)
Documents to submit
Commercial-Compliance
- Document optional
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Technical-Compliances
- Document required
Tenderer has to submit details of Employment/partnership etc of Retired Railway Employees as per Standard General Conditions of Contract 2022 with all correction slips up-to-date attached with tender document. Tender without the information above referred to or a statement to the effect that no such retired engineer or retired Gazetted Officer is so associated with the tenderer, as the case may be, shall be rejected. Format given in Annexure-J in attached documents.
- Document required
Certificates and testimonials regarding contracting experience for the type of job for which tender is invited with list of works carried out in the past.
- Document required
Audited Balance Sheet duly certified by the Chartered Accountant etc regarding contractual payments received in the past.
- Document required
The list of personnel / organization on hand and proposed to be engaged for the tendered work. Similarly list of Plant & Machinery available on hand and proposed to be inducted and hired for the tendered work.
- Document required
Partnership Firm /Company / Joint Venture (JV) / Registered Society / Registered Trust / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc. and power of attorney if applicable as per GCC 2022.
Eligibility
Special Financial Criteria
- Document required
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees, N=Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Special Technical Criteria
- Document required
Must have A-Class valid Electrical Contractor's license (ECL) in the name of Firm or Contractor. In case existing ECL is not valid on the date of opening of tender, documentary proof regarding renewal shall be submitted along with the tender document.
- Document required
The tenderer must have successfully completed any of the following during last 07(seven) years, ending last day of month previous to the one in which tender is invited:
- Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or
- Two similar works each costing not less than the amount equal to 40%ofadvertisedvalue of the tender, or
- One similar work each costing not less than the amount equal to 60% of advertised value of the tender. (Note: Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organisation, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of opening of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate).
- Document required
The tenderer in support of his/their claim of qualifying the laid down "Technical Eligibility Criteria" must submit Experience Certificate as per format prescribed in Annexure "C" duly self attested/digitally signed on each page (Self Attestation shall include signature, date & stamp of the tenderer).
Similar work means; "
- Execution of 25 kV/2X25 kV Electrification work Or
- Execution of 25 kV/2X25 kV feeder wire work Or
- Execution of 25 kV/2X25 kV OHE modification work Or
- Execution of 25 kV/2X25 kV OHE upgradation work Or
- Execution of 25 kV/2X25 kV OHE maintenance work Or
- Execution of 25 kV/2X25 kV OHE AMC work Or
- Execution of 25 kV/2X25 kV OHE rehabilitation work Or
- Execution of 25 kV/2X25 kV OHE replacement work i.e. catenary wire/contact wire/feeder wire/ATD/cantilever assembly Or
- Execution of 66 kV or higher voltage overhead Transmission line work Or
- Execution of 66 kV or higher voltage Sub-station work".
Partnership firm/Joint Venture (JV) / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc.
Please submit a certificate in the prescribed format (please download the format from the link given below). Non submission of the certificate, or submission of certificate either not properly filled in, or in a format other than the prescribed format shall lead to summary rejection of your offer. ( Click here to download the Format of Self Certification)
Check each criterion against the tender notice before you bid.
Commercial conditions
- EMD
- ₹584,600
- Tender fee
- None
Terms & conditions
15 conditionsGeneral Instructions
Terms of payment Subject to any deductions or recoveries which the purchase may be entitled to make under the contract, the contractor shall unless otherwise agreed to be entitled to get the payments subject to conditions stipulated in the subsequent clauses. On Account Payment/ Progress payment: The tenderer has to supply the exact quantity of material specified by Sr. DEE/Tr- D/BSP and after this only the on Account payment will be processed accompanied by relevant document. On Account Payment to the extent of 75% will be made under total unit price of each supply items included in the schedule of price after supply only. All invoices/bills of materials in good condition shall be accompanied with the following:
- Supplier's challan for supply of items only.
- Inspection certificate granted by RITES/authorized representative of Sr. DEE/Tr-D/ Bilaspur.
- Execution of indemnity bond on stamp duty in case of materials supplied by the Railways.
- Detailed entries made in the e-measurement book.
- Consignee's test certificate.
Final Payment Balance 25% payment will be made through final bill only after satisfactory completion of the entire contractual work, satisfactory operation and handing over of the assets to the Railway duly tested and commissioned subject to compliance of the following:-
- A no claim certificate in favour of Railway is issued by the contractor.
- Any other paper required for obtaining EIG sanction.
Tax Deduction:
Income tax @ 2% plus surcharge as applicable on the amount tobe paid by the contractor in pursuance of the contract which willbe deducted from the bills preferred by him in accordance withsection 1204C of the Income Tax Act, 1961 as introducedthrough finance Act of 1972 or as amended from time to time.
GST shall be paid as per the prevailing rate of Govt. of India at that time. For claiming subsequent bills, the contractor will have to produce voucher/challan regarding submission of GST for previous bill. If the contractor failed to produce the voucher/challan of previous bill the equivalent amount will be deducted from contractor's bill. GST shall be paid as per the prevailing rate of Govt. of India at that time. For claiming subsequent bills, the contractor will have to produce voucher/challan regarding submission of GST for previous bill. If the contractor failed to produce the voucher/challan of previous bill the equivalent amount will be deducted from contractor's bill.
Contractor should quote the rate including GST as applicable.
All the bidders/tenders should ensure that they are GST compliant and their quoted tax structure/rates are as per GST Law.
As per Railway Board letter no 2017/CE-I/CT/4/GST dtd 23.06.2017, Subsequent to the enactment of GSTAct, Board (ME) has approved modification to para (a) of clause 6, Part-I of Indian Railways StandardGeneral Conditions of Contract, july 2014. The Revised para (a) of clause 6 shall be read as under:-
Care In Submission Of Tenders
- Before submitting a tender, the tenderer will be deemed to have satisfied himself by actual inspection of the site and locality of the works, that all conditions liable to been countered during the execution of the works are taken into account and that the rates he enters in the tender forms are adequate and all inclusive to accord with the provisions in Clause-37 of the General Conditions of Contract for the completion of works to the entire satisfaction of the Engineer.
- Tenderer will examine the various provisions of the Central Goods and Service Tax Act,2017(CGST)/Integrated Goods and Services Tax, 2017(IGST)/Union Territory Goods and Services Tax Act , 2017(UTGST)/ respective state's State Goods and Services Tax (SGST) also, as notified by Central/State Govt & as amended from time to time and applicable taxes before bidding. Tenderers will ensure that full benefit of Input Tax Credit (ITC) likely to be availed by them is duly considered while quoting rates.
- The successful tenderer who is liable to be registered under CGST/IGST/UTGST/SGST Act shall submit GSTIN along with other details required under CGST/IGST/UTGST/SGST Act to Railway immediately after the award of contract, without which no payment shall be released to the contractor. The contractor shall be responsible for deposition of applicable GST to the concerned authority.
- In case the successful tenderer is not liable to be registered under CGST/IGST/UTGST/SGST Act the Railway shall deduct the applicable GST from his/their bills under reverse charge mechanism (RCM) and deposit the same to the concerned authority.
Taxes and duties shall be dealt as per extent rules. The quoted rates should be inclusive of all taxes and duties including GST.
Show all 15
The tender submitted without documentary evidence for fulfillment of eligibility criteria will not be considered. References to previous deposition of credentials in any tender will not be accepted and the credentials should be submitted with each tender separately.
Tenders containing erasures and / or alterations of tender documents are liable to be rejected. Any correction made by tender(s) in his/their entries must be attested by him / them.
Guarantee The contractor shall guarantee satisfactory working of the installation erected by him for a period of twelve months from the date of provisional acceptance of each installation. During the period of guarantee the contractor shall be liable for the replacement of any parts which may be found defective in the equipment whether such equipments be of his own manufacturer or those of his sub-contractors whether arising from faulty design, materials, workmanship or negligence in any manner on the part of the contractor if so required by him site (contractor's own expenses). The contractor shall bear the cost of repairs carried out on his behalf by the purchaser at site. In such case, the contractor shall be informed in advance of the works proposed to be carried out by purchaser. If it becomes necessary for the contractor to replace or renew any defective portion of the equipment under the clause aforesaid then the provision of the said clause shall also apply to the portion of the equipments so replaced until the expiration of six months from the date of such replacement or until the end of the above mentioned period of twelve months whichever is later, such extension shall not apply in case of defects of a minor nature. The decision of the Sr.DEE/TRD/ Bilaspur, Division of South East Central Railway being final in the matter, if any defects be not remedied with in a reasonable time during the aforesaid period the purchaser may proceed to do the work at the contractor's risk and expense but without prejudice to any other rights and remedies which the purchaser may have against the contractor in respect of such defects or faults. The repaired or renewed parts shall be delivered and erected at site free of charges to the purchaser.
All terms and conditions will be applied as per GCC 2022.
Technical-Compliances
Documents testifying tenderer previous experience and financial status should be produced along with the tender. Tenderer(s) who is / are not borne on the approved list of the Contractors of S.E.C. Railway shall submit along with his /their tender:
Bidder declarations (10)
Certifications
I/we the tenderer (s) am/are signing this document after carefully reading the contents.
I/We the tenderer(s) also accept all the conditions of the tender and have signed all the pages in confirmation thereof.
I/we hereby declare that I/we have downloaded the tender documents from Indian Railway website www.ireps.gov.in . I/we have verified the content of the document from the website and there is no addition, no deletion or no alteration to the content of the tender document. In case of any discrepancy noticed at any stage i.e. evaluation of tenders, execution of work or final payment of the contract, the master copy available with the railway Administration shall be final and binding upon me/us.
I/we declare and certify that I/we have not made any misleading or false representation in the forms, statements and attachments in proof of the qualification requirements.
I/We also understand that my/our offer will be evaluated based on the documents/credentials submitted along with the offer and same shall be binding upon me/us.
I/We declare that the information and documents submitted along with the tender by me/us are correct and I/we are fully responsible for the correctness of the information and documents, submitted by us.
I/we certify that I/we the tenderer(s) is/are not blacklisted or debarred by Railways or any other Ministry / Department of Govt. of India from participation in tender on the date of submission of bids, either in individual capacity or as a HUF/ member of the partnership firm/LLP/JV/Society/Trust.
I/we understand that if the contents of the certificate submitted by us are found to be forged/false at any time during process for evaluation of tenders, it shall lead to forfeiture of the Bid Security and may also lead to any other action provided in the contract including banning of business for a period of upto two year. Further, I/we and all my/our constituents understand that my/our offer shall be summarily rejected.
I/we also understand that if the contents of the certificate submitted by us are found to be false/forged at any time after the award of the contract, it will lead to termination of the contract, along with forfeiture of Bid Security/Security Deposit and Performance guarantee and may also lead to any other action provided in the contract including banning of business for a period of upto two year.
I/We have read the clause regarding restriction on procurement from a bidder of a country which shares a land border with India and certify that I am/We are not from such a country or, if from such a country, have been registered with the competent Authority. I/We hereby certify that I/we fulfil all the requirements in this regard and am/are eligible to be considered (evidence of valid registration by the competent authority is enclosed)
Similar open tenders
Soonest first- 5 daysleft(1) S&T portion of work in connection with Provision of one additional loop line at SNM a…Ministry of Railways · Closes 22 Oct 2026
- 9 daysleftOHE modification for provision of 1 additional loop line at GIN (Ginigera)station.Ministry of Railways · Closes 26 Oct 2026
- 9 daysleftProvision of OHE for proposed extension of existing stabling line (along side ETR line) i…Ministry of Railways · Closes 26 Oct 2026
- 10 daysleftS&T work for Yard modification to enhance CAL of short CSL lines and a Long loop line at…Ministry of Railways · Closes 27 Oct 2026
- 13 daysleftOHE work in connection with construction of a loop line for 3rd line at TABU in CKP Divis…Ministry of Railways · Closes 30 Oct 2026
- 16 daysleftOHE modification work in connection with Provision of one shunting neck and two stabling…Ministry of Railways · Closes 2 Nov 2026
- 16 daysleftOHE Modification in connection of Necessary alteration in line no.6 (PF-4 line) for makin…Ministry of Railways · Closes 2 Nov 2026
- 17 daysleftConstruction of FOB in connection with the work extension of all lines with provision of…Ministry of Railways · Closes 3 Nov 2026
Search similar in the explorerFind this tender in the explorer