Engineering procurement and Construction (EPC) of Construction of New BG line work including earthwork, blanketing, minor bridges, major bridges, LHS/RUBs, ROBs, track works, platform work, station b…
Ministry of Railways
O/o Chief Adminstrative officer, Construction, East central Railway, Mahendrughat Patna
Delivers to
Patna, Bihar
Overview
23 facts from the tenderMinistry of Railways published this works tender on eProcure on 14 Oct 2026, for Patna, Bihar. The estimated value is ₹440 Cr and the EMD is ₹8.8 Cr. It closes on 11 Feb 2027, 3:30 pm IST. Tender ID 92341851 · Ref ECR-CAO-C-S-EPC-04-26-27.
Timeline
- Published14 Oct 2026 · 3:06 pm
- Bidding startsin 103d 7h28 Jan 2027
- Closes11 Feb 2027 · 3:30 pm
Bidding
- Bid type
- Open/Advertised
- Contract type
- Works - General · Expenditure
- Tender type
- Open · EPC [ Single Stage ]
- Tendering section
- TENDER
- Bidding system
- Two Packet System
- Bidding style
- Single Rate for Each Schedule
- Validity of offer
- 180 days
- Completion period
- 810 Days
- Tender document cost
- None
- JV / consortium
- JV allowed (up to 4 members), consortium allowed (up to 4 members)
- Ranking order
- Lowest to Highest
- Expenditure type
- Capital (Works)
- Pre-bid meeting
- 11 Nov 2026, 3:30 pm
Buyer
- Inviting authority
- CAO-C-SOUTH-HQ-ENGINEERING/EAST CENTRAL RLY
- Organisation type
- Central Govt. Ministry/Department
- Product category
- Railway related Products
- Location
- Patna, Bihar · the inviting office's place
- Portal location
- Hazipur · as listed on eProcure
- Portal
- eProcure
- Inviting officer
- CAO/CON/SouthCAO-C-SOUTH-HQ-ENGINEERING/EAST CENTRAL RLY
Important dates
- Published
- 14 Oct 2026, 3:06 pm IST
- Bidding starts
- 28 Jan 2027
- Closes
- 11 Feb 2027, 3:30 pm IST
Declarations by the buyer
- Complies with the Public Procurement (Make in India) Order 2017
- The tender inviting authority confirms this tender does not violate the GFR rules on procurement through GeM
- Bidders from a country sharing a land border with India must be registered with the competent authority
Schedule of work
11 items| Item | Quantity | Railways’ estimated rate | Amount |
|---|---|---|---|
| Schedule (EPC) G-Project Lumpsum | |||
| 1epc cost lumsum as per docuent | ₹3,54,75,32,181.75 | ||
| Schedule (G1) A1-(Bridge Work-Substructure,superstructure(RCC &steel) & Misc. ) | |||
| 01Conducting integrity test with cross-hole (Two diametrically opposite longitudinal holes along the pile shaft) ultrasonic monitoring (CHUM) methodon cast in situ bored piles by specialized agencyhaving necessary experience and expertise etc. | 215 Each | ₹35,266.39 | ₹75,82,273.85 |
| 02Construction and labour charge for installation and lowering down 40mm dia GI Fixed & set with GI pipe (CHUM method) jointing including cost of Transportation & rent of Hydra etc. Measurement is same as measurement of piling work | 3,333 Metre | ₹958.12 | ₹31,93,413.96 |
| Schedule (G1) B2-(Bridge Work-Substructure,superstructure(RCC &steel) & Misc. ) | |||
| 01(Bridge Work-Substructure,superstructure(RCC &steel) & Misc.Escalation -8.41% | ₹17,58,98,458.89 | ||
| Schedule (G1) C1-(Supply of cement) | |||
| 1Supply and using Cement at Worksite Ordinary Portland Cement 43 grade approved brands/makesEscalation -6.09% | 10,615.57 MT | ₹9,924.15 | ₹9,89,34,663.02 |
| 2Supply and using Cement at Worksite Pozzolana Portland Cement approved brands/makesEscalation -6.09% | 190.41 MT | ₹9,357.70 | ₹16,73,288.06 |
| Schedule (G1) C2-(Supply of Reinforcement steel) | |||
| 01(Supply of Reinforcement steel)Escalation -12.76% | ₹50,62,40,617.60 | ||
| Schedule (G1) D1-Dismantaling | |||
| 1DISMANTLING AND DEMOLISHING // General // Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.Escalation 12% | 178.20 cum | ₹3,551.25 | ₹7,08,772.68 |
| 2DISMANTLING AND DEMOLISHING // General // Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. // In cement mortarEscalation 12% | 1,039.50 cum | ₹2,060.20 | ₹23,98,567.25 |
| Schedule (G1) G1- Lumpsum unforeseen | |||
| 1unforeseen items | 1 Lumpsum | ₹5,00,00,000 | ₹5,00,00,000 |
| Schedule (G1) B10-Handling of Materials | |||
| 01Handling of MaterialsEscalation -9.32% | ₹56,19,469.52 | ||
| Total | ₹4,39,97,81,706.58 | ||
Bids quote a percentage above, below or at par with these rates · The total matches the advertised value.
Documents
7 files- PDFNotice inviting tenderviewNitPdf_5565592.pdf (opens in a new tab)
- PDFBank account detailsBankaccountdetails.pdfNo direct link in the notice; see the notice, page 14
- PDFLink for DrawingLinkforDrawing.pdfNo direct link in the notice; see the notice, page 14
- PDFVC DetailsVCDetails_1.pdfNo direct link in the notice; see the notice, page 14
- PDFRFP DOCUMENTRFPDOCUMENT-JHAJHAex.toBATIANEWLINE.pdfNo direct link in the notice; see the notice, page 14
- PDFEPC DocumentEPCDocument- JhajhatoBatiaEPCAgreementwithScheduleG1.pdfNo direct link in the notice; see the notice, page 14
- PDFAnnexure-V(A)Annexure-V(A).pdf (opens in a new tab)
Documents to submit
Commercial-Compliance
- Document required
Details of bidder is to be furnished as per Annexure I of RFP document as attached.
- Document required
Financial Capacity of bidder is to be furnished as per Annexure III (RFP clause 2.2.2.2, 2.2.2.8 (i) and 2.2.2.7 (iii) as attached.
- Document required
Certificate(s) from its statutory auditors or the concerned client(s) stating the payments received or in case of a PPP project, the construction carried out by itself, during the past 5 years, in respect of the Eligible Projects.
- Document required
Certificate(s) from its statutory auditors specifying the net worth of the Bidder (including associates, if any), as at the close of the preceding Financial Year , and also specifying that the methodology adopted for calculating such net worth conforms to the provisions of this Clause 2.2.2.8 (ii) in RFP document as attached.
- Document required
Statement of legal capacity is to be furnished as per Annexure V of RFP document as attached.
- Document required
Guidelines of the Department of Disinvestment is to be furnished as per Annexure VI (RFP clause 1.2.1) as attached
Show all 17
- Document required
Bid security Bid Security in respect of e-tendering to be submitted. refundable not later than 200 (Two hundred) days from Bid Due Date. (RFP clause 1.2.4 as attached).
- Document required
The tenderer shall upload scanned copies of mandatory credentials such as experience, turn over Certificates and any other documents as applicable.
- Document required
It is the responsibility of the tenderer to see corrigendum, if any, to tender notice up to the date of tender opening.
- Document required
New Annexure-I, II, III & IV inserted in Part-VI (Article-24) of Standard EPC Tender Document April- 2025.
Please enter the percentage of local content in the material being offered.
Please enter 0 for fully imported items, and 100 for fully indigenous items.
The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Technical-Compliances
- Document required
TEST OF RESPONSIVENESS (RFP 3.1.6)For evaluation of Technical Bids, the Authority shall determine when the reach Technical Bid is responsive to there requirements of this RFP. A Technical Bid shall be considered responsive only if:(a)Technical Bid is received online as pert he format at Appendix-IA including Annexure I, II, III, IV, V and VI and supporting certificates / documents, Appendix-Vll (Bank Guarantee Bond for Bid Security), if applicable.;
- The Power of Attorney is uploaded on e-procurement portal as specified inClauses2.1.5;
- Technical Bid is accompanied by Power of Attorney for Lead Member of Consortium/Joint Venture and the Joint Bidding Agreement as specified in Clause2.1.6, if so required;
- Document required
Letter of technical bid as per RFP Clause 2.1.4, 2.11 and 3.1.6 is to be submitted as per Appendix 1A in RFP document as attached.
- Document required
Technical Capacity of bidder is to furnished by Annexure II (RFP clause 2.2.2.1, 2.2.2.4 and 2.2.2.6) in RFP document as attached.
- Document required
TEST OF RESPONSIVENESS (RFP 3.1.6) For evaluation of Technical Bids, the Authority shall determine whether each Technical Bid is responsive to the requirements of this RFP. A Technical Bid shall be considered responsive only if: (a) Technical Bid is received online as per the format at Appendix-IA including Annexure I, II, III, IV, V and VI and supporting certificates / documents, Appendix-Vll (Bank Guarantee Bond for Bid Security), if applicable.;
- The Power of Attorney is uploaded on e-procurement portal as specified in Clauses 2.1.5;
- Technical Bid is accompanied by Power of Attorney for Lead Member of Consortium/Joint Venture and theJoint Bidding Agreement as specified in Clause 2.1.6, if so required;
(b) All Documents listed at clause 2.11.2 are received physically within time as mentioned in clause 1.3;
(c) Technical Bid is accompanied by the Bid Security as specified in Clause 1.2.4 and 2.20;
(f) Technical Bid contains all the information (complete in all respects);
(g) Technical Bid does not contain any condition or qualification.
Physical Docs Mandatory Submission
- Document required
Original Power of Attorney for signing the Bid as per format at Appendix-II (AS PER RFP CLAUSE 2.11.2 as attached).
- Document required
If applicable, Original Power of Attorney for Lead Member of Consortium/Joint Venture as per the format at Appendix-III; (AS PER RFP CLAUSE 2.11.2 as attached).
- Document required
If applicable, Original Joint Bidding Agreement for Consortium/Joint Venture as per the format at Appendix-IV;(AS PER RFP CLAUSE 2.11.2 as attached).
Eligibility
Special Financial Criteria
- Document required
The Bidder shall have a minimum Net Worth (the "Financial Capacity") of 5% (five percent) [Rs. 219989085.33 crore (Rs. Twenty-One Crore Ninety-Nine Lakh Eighty-Nine Thousand Eighty-Five and Thirty three paisa)] at the close of the preceding Financial Year. The tenderer shall not have total amount of dispute in their pending litigation more than Fifty percent (50%) of the tenderer's Net Worth. The tenderer shall be examined for all pending litigation from all contracts completed or all ongoing contracts. The tenderer shall provide detailed information of all such pending litigations in the prescribed proforma given in Appendix- VIII. The details of all pending litigation shall comprise of all such Arbitration cases and also all pending Court cases irrespective of whether these litigations have been initiated by the tenderer against their Employer/Authority/Client or by the Client/Employer/Authority against the tenderer. The amount of disputes shall also comprise of all the claim amount and also all counter-claim amount in such Arbitration/Court cases
Special Technical Criteria
- Document required
For demonstrating Technical Capacity and experience (the "Technical Capacity"), the Bidder shall, during the last 5 (five) previous financial years and the current financial year up to the Base month (not to be read with para-2.1.13).
- have received payments for construction of Eligible Project(s), or has executed construction works by itself in a PPP project, such that the sum total thereof, as further adjusted in accordance with clause 2.2.2.4 (i) &
- is more than 2.5 (two and half) times the Estimated Project Cost (the "Threshold Technical Capacity").Provided that at least one fourth of the Threshold Technical Capacity shall be from the Eligible Projects in Category 1 and/ or Category 3 specified in Clause 2.2.2.4 (i) & (ii)(ii)Completed (executed) or Substantially completed$ (executed) at least one Eligible Project of Railway Sector as mentioned in clause 2.2.2.4/iii of value of not less than [50% (fifty) per cent] of the Estimated Project Cost However, in case of Consortium/Joint Venture, the other members of Consortium/Joint Venture (who are not considered for satisfying this technical Capacity under this clause) also must have Completed (Executed) or Substantially completed$ at least one Eligible Project of Railway Sector as mentioned in clause 2.2.2.4/iii of value of not less than [10% (ten) per cent] of the Estimated Project Cost.
- Completed (executed) or substantially completed$ (executed) at least one similar work of value of not less than [20% (Twenty percent)] of the estimated project cost. (b) Completed (executed) or substantially completed$ (executed) at least two similar works of value of not less than [10% (Ten percent)] of the estimated project cost. Illustration for 'received payments for not less than 75 (seventy-five) per cent':For contract wherein there is provision for part payment on 'procurement of goods and equipment' on basis of indemnity bond/Bank Guarantee. In all such contract, 'received payments for not less than 75 (seventy-five) per cent value of present Contract Value payment' means not less than 75% payment received under 'procurement of goods and equipment' as well as not less than 75% payment received under 'execution/installation/commissioning'.For avoidance of doubt, in above cl. 2.2.2.1(i) & (ii) & (iii) the amount of payment received for eligible projects or amount of payments received against PPP project shall be considered for last past 5 (five)previous financial Years and current financial year up to the base month even if project was started earlier than the said reckoned period. The meaning of executed shall be considered as completed or in progress.[Note:- For composite works of New lines, Gauge Conversion, Doubling, 3rd line, 4th line etc. with Railway electrification and/or Signalling and telecommunication works-
- Document required
1.In case scope involves the electrification work as per item No. 3 of Annexure -I of Schedule -B value as mentioned in Annexure-G, the selected bidders can himself execute above Electrification work, only in case he has experience as mentioned in clause 2.2.2.1/ii above to value of estimated electrification work as mentioned in Schedule-G of draft Concession Agreement after taking approval from Authority. Otherwise selected bidder shall execute electrification work involved in project by engaging sub-contractor as per clause 3.2 of draft Concession Agreement having experience of Railway Sector works. The Railway Sector would be deemed to include overhead equipment system of Railway electrification for a railway system, metro system, suburban transit system, high speed railways, substation and transmission lines,and/or2.In case scope involves the Signalling and Telecommunication work as per item No. 2 of Annexure-I of Schedule-B value as mentioned in Annexure-G, the selected bidders can himself execute above Signalling and Telecommunication work, only in case he has experience as mentioned in clause 2.2.2.1/ii above to value of estimated Signalling and Telecommunication work as mentioned in Schedule-G of draft Concession Agreement after taking approval from Authority. Otherwise selected bidder shall execute Signalling and Telecommunication work involved in project by engaging sub-contractor as per clause 3.2 of draft Concession Agreement having experience of Railway Sector works. The Railway Sector would be deemed to include Signalling and Telecommunication of railway system, metro system, suburban transit system, high speed railways.]
- Document required
Similar Nature of Work "Civil Engineering work of required value involving Earthwork in Formation, Blanketing, Minor bridges, P-Way work for BG track including Ballast supply and Major bridges on Open/Pile/Well foundation including Superstructure of Plate girder/Composite girder/Open Web Girder."
Partnership firm/Joint Venture (JV) / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc.
Please submit a certificate in the prescribed format (please download the format from the link given below). Non submission of the certificate, or submission of certificate either not properly filled in, or in a format other than the prescribed format shall lead to summary rejection of your offer. ( Click here to download the Format of Self Certification)
Check each criterion against the tender notice before you bid.
Commercial conditions
- EMD
- ₹87,995,600
- Tender fee
- None
Terms & conditions
21 conditionsCheck Lst
Details of technical bid
Appendix-IA (Letter comprising the Technical Bid) including Annexure I-VI and supporting certificates / documents in RFP document as attached.
Power of Attorney for signing the Bid as per the format at Appendix-II in RFP document as attached.
If applicable, Power of Attorney for Lead Member of Consortium/Joint Venture as per the format at Appendix-III in RFP document as attached.
If applicable, Joint Bidding Agreement for Consortium/Joint Venture as per the format at Appendix-IV in RFP document asattached.
An undertaking from the person having Power of Attorney referred to in Sub. Clause-(b) above that they agree and abide by the Bid Documents uploaded by Authority and amendments uploaded, if any;
Copy of Memorandum and Articles of Association, if the Bidder is a body corporate, and if a partnership then a copy of its partnership deed.
Copies of duly audited complete annual accounts of the Bidder or of each member (in case of Joint Venture/Consortium) for preceding 5 years.
Financial Bid.
Appendix-IB (Letter comprising the Financial Bid) in RFP document as attached.
General Instructions
Validity of offer is 180 days. Any rebate if offered shall also be valid for 180 days.
Show all 19
Rates are inclusive of all taxes/octroi, license fee, royalty charges etc. legally leviable by State, Central Govt. and/or any other local authority.
Bidders are encouraged to submit their respective Bids after visiting the Project site and ascertaining for themselves the site conditions, traffic, location, surroundings, climate, availability of power, water & other utilities for construction, access to site, handling and storage of materials, weather data, applicable laws and regulations, and any other matter considered relevant by them. (RFP Para 2.5.1 as attached).
In case the successful tenderer is not liable to be registered under CGST/IGST/UTGST/SGST Act, the railway shall deduct the applicable GST from his/their bills under reverse charge mechanism (RCM) and deposit the same to the concerned authority. Compliance with GST Act 2017- (Authority RBds letter No.2017/CE-I/CT/4/GST dated 23.06.17).
No bidder to submit more than one bid as member or individually (RFP Para 2.1.1 as attached).
It is the responsibility of the tenderer to see corrigendum, if any, to tender notice up to the date of tender opening.
Special Conditions
The provision of Construction and Demolition Waste Management Rule 2016 issued by Ministry of Environment Forest and Climate Change dated 29.03.2016 and published in the Gazette of India, Part - II, Section -3, Subsection (ii) are binding upon the Contractor. Contractor shall implement these provisions at worksites, for which no extra payment will be payable
The element of GST/sales tax / commercial tax/turnover tax etc. in works contract, if any, shall be considered to be included in the rates quoted by the tenderer/s in the tender schedule. GST/Sales tax / commercial tax / turnover tax on works contract will be recovered from the contractor's bill at the rate as applicable as per rules framed by State Govt. from time to time and remitted to the State Govt. by the Railways, Railway shall deduct TDS towards GST@ 2%. (CGST1% & SGST 1%) or (IGST 2%)of the total value of Taxable amount and remit the same to the State Govt. The Amount of GST TDS show deducted and paid shall be reflected in the credit ledger of the contractor.( Rly Bds.Letter N0. 2018/AC-II/46dated 19.09.2018.& 29.9.18.
Railways shall deduct Conservancy of cess charges as per railway Board letter dated 5.12.2016.
The Contractor shall comply with the provisions of Para 30 & 36- B of the Employees Provident Fund Scheme, 1952; Para 3 & 4 of Employees' Pension Scheme, 1995; and Para 7 & 8 of Employees Deposit Linked Insurance Scheme, 1976; as modified from time to time through enactment of "Employees Provident Fund & Miscellaneous Provisions Act, 1952", wherever applicable and shall also indemnify the Railway from and against any claims under the aforesaid Act and the Rules.
Bidder declarations (17)
Undertakings
I/ We have visited the works site and I / We am / are aware of the site conditions.
In the last three years, we have neither failed to perform for the works of Railways as evidenced by imposition of a penalty by an arbitral or judicial authority or a judicial pronouncement or arbitral award against us, nor been expelled or terminated by Ministry of Railway or its implementing agencies for breach on our part. (RFP para 2.1.14 and included in Annexure I in RFP document as attached).
We do not fall in any of the categories of being a Non-Performing entity given at Clause 2.1.14 of Instructions to Bidders in the projects of Ministry of Railways or its implementing agencies and furnished the complete details. (Included in Annexure I in RFP document as attached).
I/we certify that no investigation by a regulatory authority is pending either against us/any member of Consortium/Joint Venture or our sister concern or against our CEO or any of our directors/managers/employees. (Included in Annexure I and Annexure VI in RFP document as attached).
An undertaking from the person having Power of Attorney that they agree and abide by the Bid Documents uploaded by Authority and amendments uploaded (RFP para 2.11.1 and Part of Technical Bid in RFP document as attached).
I/We do not have any conflict of interest in accordance with Clauses 2.2.1 (c) and 2.6.4 of the RFP document (Included in Appendix 1A).
I/We have not directly or indirectly or through an agent engaged or indulged in any corrupt practice, fraudulent practice, coercive practice, undesirable practice or restrictive practice, as defined in Clause 4.3 of the RFP document (Included in Appendix 1A).
Certifications
I/we the tenderer (s) am/are signing this document after carefully reading the contents.
I/We the tenderer(s) also accept all the conditions of the tender and have signed all the pages in confirmation thereof.
I/we hereby declare that I/we have downloaded the tender documents from Indian Railway website www.ireps.gov.in . I/we have verified the content of the document from the website and there is no addition, no deletion or no alteration to the content of the tender document. In case of any discrepancy noticed at any stage i.e. evaluation of tenders, execution of work or final payment of the contract, the master copy available with the railway Administration shall be final and binding upon me/us.
I/we declare and certify that I/we have not made any misleading or false representation in the forms, statements and attachments in proof of the qualification requirements.
I/We also understand that my/our offer will be evaluated based on the documents/credentials submitted along with the offer and same shall be binding upon me/us.
I/We declare that the information and documents submitted along with the tender by me/us are correct and I/we are fully responsible for the correctness of the information and documents, submitted by us.
I/we certify that I/we the tenderer(s) is/are not blacklisted or debarred by Railways or any other Ministry / Department of Govt. of India from participation in tender on the date of submission of bids, either in individual capacity or as a HUF/ member of the partnership firm/LLP/JV/Society/Trust.
I/we understand that if the contents of the certificate submitted by us are found to be forged/false at any time during process for evaluation of tenders, it shall lead to forfeiture of the Bid Security and may also lead to any other action provided in the contract including banning of business for a period of upto two year. Further, I/we and all my/our constituents understand that my/our offer shall be summarily rejected.
I/we also understand that if the contents of the certificate submitted by us are found to be false/forged at any time after the award of the contract, it will lead to termination of the contract, along with forfeiture of Bid Security/Security Deposit and Performance guarantee and may also lead to any other action provided in the contract including banning of business for a period of upto two year.
I/We have read the clause regarding restriction on procurement from a bidder of a country which shares a land border with India and certify that I am/We are not from such a country or, if from such a country, have been registered with the competent Authority. I/We hereby certify that I/we fulfil all the requirements in this regard and am/are eligible to be considered (evidence of valid registration by the competent authority is enclosed)
Similar open tenders
Soonest first- 19 daysleftEngineering, Procurement and Construction (EPC) Tender for Construction of doubling work…Ministry of Railways · Closes 5 Nov 2026
- 24 daysleftJeypore - Nabarangpur New BG Railway Line project: Design & Construction of New BG Railwa…Ministry of Railways · Closes 10 Nov 2026
- 55 daysleftEngineering, Procurement and Construction (EPC) Tender for Construction of doubling work…Ministry of Railways · Closes 11 Dec 2026
- 68 daysleftEngineering, Procurement and Construction (EPC) Agreement for Construction of New BG Rail…Ministry of Railways · Closes 24 Dec 2026
- 74 daysleftEngineering Procurement and Construction (EPC) for Construction of doubling work includin…Ministry of Railways · Closes 30 Dec 2026
- 80 daysleftEngineering procurement and Construction (EPC) of Construction of Viaducts, ROR/RFO, Majo…Ministry of Railways · Closes 5 Jan 2027
- 102 daysleftEngineering procurement and Construction (EPC) for Construction of New line work between…Ministry of Railways · Closes 27 Jan 2027
- 117 daysleftConstruction of 2nd New Railway Line (Doubling works) between Section Kanalus(Including)…Ministry of Railways · Closes 11 Feb 2027
Search similar in the explorerFind this tender in the explorer