Browse all bids
GeMOpenGoodsBidBOQ

PROCUREMENT OF LAYING OFC ALONG WITH HDPE PIPE AND OTHER ACCESSORIES

Indian Army

Ministry of Defence › Department of Military Affairs

Delivers to

Bathinda, Punjab

Overview

10 facts from the tender

Ministry of Defence published this goods tender on GeM on 10 Oct 2026, for Bathinda, Punjab. The EMD is ₹25 L. It closes on 31 Oct 2026, 2:00 pm IST. Bid number GEM/2026/B/7948977.

Timeline

  1. Published10 Oct 2026 · 1:21 pm
  2. Reverse auctionIf the bid qualifies, after evaluation

Bidding

Bid type
Bid
Evaluation method
Total value wise evaluation
Packet type
Two Packet Bid
Reverse auction
Yes, H1-Highest Priced Bid Elimination
Total quantity
3,941

Buyer

Created by
sunngh.339w@gov.in
Location
Bathinda · Punjab
Portal
GeM

Important dates

Published
10 Oct 2026, 1:21 pm IST
Closes
31 Oct 2026, 2:00 pm IST

Items & delivery

13 items · Address masked by GeM

Delivery location · all items

***********Bathinda

GeM masks the full address in this document.
Showing 13 of 13
01OFC 12 CORE ADSSQuantityNot statedDelivery180 daysDetailsClose
Delivery
180 days
02HDPE PIPE 40 MmQuantityNot statedDelivery180 daysDetailsClose
Delivery
180 days
03COUPLERQuantityNot statedDelivery180 daysDetailsClose
Delivery
180 days
04JOINT ENCLOSUREQuantityNot statedDelivery180 daysDetailsClose
Delivery
180 days
05E2K PATCH CORD 5 MtrQuantityNot statedDelivery180 daysDetailsClose
Delivery
180 days
06LC2-E2K PATCH CORD 5 MtrQuantityNot statedDelivery180 daysDetailsClose
Delivery
180 days
07LC-SC PATCH CORD 5 MtrQuantityNot statedDelivery180 daysDetailsClose
Delivery
180 days
08CONCRETE ROUTE MARKERQuantityNot statedDelivery180 daysDetailsClose
Delivery
180 days
09HAND HOLD JOINT CHAMBER RING TYPEQuantityNot statedDelivery180 daysDetailsClose
Delivery
180 days
10FDMS 12 COREQuantityNot statedDelivery180 daysDetailsClose
Delivery
180 days
11GI PIPE WITH RCC 20 Feet FOR BRIDGE CROSSINGQuantityNot statedDelivery180 daysDetailsClose
Delivery
180 days
12DIGGING AND LAYINGQuantityNot statedDelivery180 daysDetailsClose
Delivery
180 days
13MISC CHARGES ROW CHARGES ON PROJECTSQuantityNot statedDelivery180 daysDetailsClose
Delivery
180 days

Tender documents

Bid files and supporting documents, linked directly from GeM.

Policy & contract references

Documents you must submit

  • Experience Criteria
  • Past Performance
  • Bidder Turnover
  • Certificate (Requested in ATC)
  • OEM Authorization Certificate
  • OEM Annual Turnover
Show all 7
  • Compliance of BoQ specification and supporting document

Eligibility

Experience

3 years

Min. turnover

₹2.5 Cr

a year, 3-year average

OEM turnover

₹20 Cr

Past performance

50%

of the bid quantity

Experience & turnover exemptions

Micro & small enterprises (MSE)

Complete exemption
Exemption conditions

Yes | Complete

View PDF · p. 3

Exemptions depend on the evidence and conditions specified in the bid.

Preferences & relaxations

  • MSE purchase preference
  • MII preference
  • Class-1/2 local suppliers
  • EMD exemption: no
  • Inspection required: no

Check each criterion against the tender notice before you bid.

Commercial conditions

EMD
₹2,500,000
Performance guarantee
5% for 38 months
Offer validity
180 days

Buyer requirements & conditions

Buyer-added conditions from the bid document.

OPTION CLAUSE: The Purchaser reserves the right to increase or decrease the quantity to be ordered up to 25 percent of bid quantity at the time of placement of contract. The purchaser also reserves the right to increase the ordered quantity up to 25% of the contracted quantity during the currency of the contract at the contracted rates. The delivery period of quantity shall commence from the last date of original delivery order and in cases where option clause is exercised during the extended delivery period the additional time shall commence from the last date of extended delivery period. The additional delivery time shall be (Increased quantity ÷ Original quantity) × Original delivery period (in days), subject to minimum of 30 days. If the original delivery period is less than 30 days, the additional time equals the original delivery period. The Purchaser may extend this calculated delivery duration up to the original delivery period while exercising the option clause. Bidders must comply with these terms.

Bidder financial standing: The bidder should not be under liquidation, court receivership or similar proceedings, should not be bankrupt. Bidder to upload undertaking to this effect with bid.

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

  • a.Copy of PAN Card.
  • b.Copy of GSTIN.
  • c.Copy of Cancelled Cheque.
  • d.Copy of EFT Mandate duly certified by Bank.

Consortium: In case of Contracts, wherein the seller alone does not have necessary expertise, the seller can form consortium with other sellers for submission of the bid, with one of the consortium company as leader. However, each and every member of the consortium shall be equally responsible for the complete execution of the project contract. An undertaking to this effect is to be uploaded with bid.

End User Certificate: Wherever Bidders are insisting for End User Certificate from the Buyer, same shall be provided in Buyer’s standard format only.

Experience Criteria: The Bidder or its OEM {themselves or through reseller(s)} should have regularly, manufactured and supplied same or similar Category Products to any Central / State Govt Organization / PSU for 3 years before the bid opening date. Copies of relevant contracts to be submitted along with bid in support of having supplied some quantity during each of the year. In case of bunch bids, the primary product having highest value should meet this criterion.

Malicious Code Certificate: The seller should upload following certificate in the bid:-

  • (a)This is to certify that the Hardware and the Software being offered, as part of the contract, does not contain Embedded Malicious code that would activate procedures to :-
  • (i)Inhibit the desires and designed function of the equipment.
  • (ii)Cause physical damage to the user or equipment during the exploitation.
  • (iii)Tap information resident or transient in the equipment/network.
  • (b)The firm will be considered to be in breach of the procurement contract, in case physical damage, loss of information or infringements related to copyright and Intellectual Property Right (IPRs) are caused due to activation of any such malicious code in embedded software.

Shelf Life: The Product/Spare parts to be supplied as part of the services must have minimum 10 Shelf Life. On the date of supply, minimum 10 usable shelf life should be available / balance.

IMPORTED PRODUCTS: In case of imported products, OEM or Authorized Seller of OEM should have a registered office in India to provide after sales service support in India. The certificate to this effect should be submitted.

10

Forms of EMD and PBG

View PDF · p. 14

Bidders can also submit the EMD with Account Payee Demand Draft in favour of GOC-IN-C, SWC, ACSFP CELL payable at STATE BANK OF INDIA . Bidder has to upload scanned copy / proof of the DD along with bid and has to ensure delivery of hardcopy to the Buyer within 5 days of Bid End date / Bid Opening date.

11

Forms of EMD and PBG

View PDF · p. 15

Successful Bidder can submit the Performance Security in the form of Account Payee Demand Draft also (besides PBG which is allowed as per GeM GTC). DD should be made in favour of GOC-IN-C, SWC, ACSFP CELL payable at STATE BANK OF INDIA . After award of contract, Successful Bidder can upload scanned copy of the DD in place of PBG and has to ensure delivery of hard copy to the original DD to the Buyer within 15 days of award of contract.

12

Financial Criteria

View PDF · p. 15

NET WORTH: Net Worth of the OEM should be positive as per the last audited financial statement.

13

Scope of Supply

View PDF · p. 15

Scope of supply (Bid price to include all cost components) : Supply Installation Testing and Commissioning of Goods

  • 14.Purchase Preference (Centre) Purchase Preference linked with Local Content (PP-LC) Policy: The bid clause regarding “Preference to Make In India products” stands modified in this bid and shall be governed by the PPLC Policy No. FP-20013/2/2017-FP-PNG dated 17.11.2020 issued by MoP&NG as amended up to date. Accordingly, bidders with Local Content less than or equal to 20% will be treated as “Non Local Supplier”. The prescribed LC shall be applicable on the date of Bid opening. Sanctions on the bidders for false / wrong declaration or not fulfilling the Local Content requirement shall be as per the PPLC policy. Further following additional provisions are added in the certification and verification of local content provision of the Preference to Make in India clause:
  • i.In case of foreign bidder, certificate from the statutory auditor or cost auditor of their own office or subsidiary in India giving the percentage of local content is also acceptable. In case office or subsidiary in India does not exist or Indian office/subsidiary is not required to appoint statutory auditor or cost auditor, certificate from practicing cost accountant or practicing chartered accountant giving the percentage of local content is also acceptable. ii. Along with Each Invoice: The local content certificate (issued by statutory auditor on behalf of procuring company) shall be submitted along with each invoice raised. However, the % of local content may vary with each invoice while maintaining the overall % of local content for the total work/purchase of the pro-rata local content requirement. In case, it is not satisfied cumulatively in the invoices raised up to that stage, the supplier shall indicate how the local content requirement would be met in the subsequent stages. iii. The bidder shall submit an undertaking from the authorized signatory of bidder having the Power of Attorney along with the bid stating the bidder meets the mandatory minimum LC requirement and such undertaking shall become a part of the contract.
15

Certificates

View PDF · p. 15

Bidder's offer is liable to be rejected if they don't upload any of the certificates / documents sought in the Bid document, ATC and Corrigendum if any.

16

Certificates

View PDF · p. 15

ISO 9001: The bidder or the OEM of the offered products must have ISO 9001 certification.

17

Certificates

View PDF · p. 15

Material Test Certificate Should Be Sent Along with The Supply. The Material Will Be Checked by Buyer’s Lab & the Results of the Lab will be the Sole Criteria for Acceptance of the Item.

18

Buyer Added Bid Specific ATC

View PDF · p. 16

Buyer Added text based ATC clauses 1.Non-disclosure of Contract documents.Except with the written consent of the Buyer/ Seller, other party s hall not disclose the contract or any provision, specification, plan, design, Pattern, sample or information thereof to any third party. The vendor will certify that all military information and data available to him as a part of the project will remain the exclusive property of and will not be disclosed to any person not authorized by 16 RAPID Signal Regiment, Sriganganagar Military Station. Failure to comply with his clause will make the vendor liable to action as per law.

  • 2.Liquidated Damages. In the event of the Seller’s failure to submit the Bonds, Guarantees and Documents. Supply the stores/ goods and conduct trials, installation of equipment, training etc as specified in this contract, the Buyer may, at his discretion, withhold any payment until the completion of the contract. The BUYER may also deduct from the SELLER as agreed, liquidated damages to the sum of 0.5% of the contract price of the delayed/ undelivered stores/ services mentioned above for every week of delay or part of a week, subject to the maximum value of the Liquidated Damages being not higher than 5% of the value of delayed stores. Thereafter the BUYER will have the right to terminate the supply order in case of such delay beyond ten weeks and the buyer would have the option to buy the delayed stores from the market at the bidder's risk and cost through EMD. The mode and method of such risk purchase would be at the total discretion of the buyer.
  • 3.Payment Terms. acceptance by the user.
  • 4.Advance Payment. 100% payment on delivery of hardware/stores, installation and No advance payment(s) will be made. .
  • 19.Turnover Bidder Turn Over Criteria: The minimum average annual financial turnover of the bidder during the last three years, ending on 31st March of the previous financial year, should be as indicated in the bid document. Documentary evidence in the form of certified Audited Balance Sheets of relevant periods or a certificate from the Chartered Accountant / Cost Accountant indicating the turnover details for the relevant period shall be uploaded with the bid. In case the date of constitution / incorporation of the bidder is less than 3 year old, the average turnover in respect of the completed financial years after the date of constitution shall be taken into account for this criteria.
  • 20.Turnover OEM Turn Over Criteria: The minimum average annual financial turnover of the OEM of the offered product during the last three years, ending on 31st March of the previous financial year, should be as indicated in the bid document. Documentary evidence in the form of certified Audited Balance Sheets of relevant periods or a certificate from the Chartered Accountant / Cost Accountant indicating the turnover details for the relevant period shall be uploaded with the bid. In case the date of constitution / incorporation of the OEM is less than 3 year old, the average turnover in respect of the completed financial years after the date of constitution shall be taken into account for this criteria. In case of bunch bids, the OEM of CATEGORY RELATED TO primary product having highest bid value should meet this criterion.
21

Service & Support

View PDF · p. 16

Availability of Service Centres: Bidder/OEM must have a Functional Service Centre in the State of each Consignee's Location in case of carry-in warranty. (Not applicable in case of goods having on-site warranty). If service center is not already there at the time of bidding, successful bidder / OEM shall have to establish one within 30 days of award of contract. Payment shall be released only after submission of documentary evidence of having Functional Service Centre.

22

Service & Support

View PDF · p. 17

Dedicated /toll Free Telephone No. for Service Support : BIDDER/OEM must have Dedicated/toll Free Telephone No. for Service Support.

23

Service & Support

View PDF · p. 17

Escalation Matrix For Service Support : Bidder/OEM must provide Escalation Matrix of Telephone Numbers for Service Support.

Warranty period of the supplied products shall be 3 years from the date of final acceptance of goods or after completion of installation, commissioning & testing of goods (if included in the scope of supply), at consignee location. OEM Warranty certificates must be submitted by Successful Bidder at the time of delivery of Goods. The seller should guarantee the rectification of goods in case of any break down during the guarantee period. Seller should have well established Installation, Commissioning, Training, Troubleshooting and Maintenance Service group in INDIA for attending the after sales service. Details of Service Centres near consignee destinations are to be uploaded along with the bid.

Timely Servicing / rectification of defects during warranty period: After having been notified of the defects / service requirement during warranty period, Seller has to complete the required Service / Rectification within 3 days time limit. If the Seller fails to complete service / rectification with defined time limit, a penalty of 0.5% of Unit Price of the product shall be charged as penalty for each week of delay from the seller. Seller can deposit the penalty with the Buyer directly else the Buyer shall have a right to recover all such penalty amount from the Performance Security (PBG).Cumulative Penalty cannot exceed more than 10% of the total contract value after which the Buyer shall have the right to get the service / rectification done from alternate sources at the risk and cost of the Seller besides forfeiture of PBG. Seller shall be liable to re-imberse the cost of such service / rectification to the Buyer.

Successful bidder will have to ensure that adequate number of dedicated technical service personals / engineers are designated / deployed for attending to the Service Request in a time bound manner and for ensuring Timely Servicing / rectification of defects during warranty period, as per Service level agreement indicated in the relevant clause of the bid.

Similar open tenders

Soonest first

Search similar in the explorerFind this tender in the explorer

Open on GeM