Browse all bids
GeMOpenGoodsBidBOQ

ESTABLISHMENT OF CENTRAL CCTV WITH CONTROL ROOM

Hqids

Ministry of Defence › Department of Military Affairs

Delivers to

Pune, Maharashtra

Overview

10 facts from the tender

Ministry of Defence published this goods tender on GeM on 10 Oct 2026, for Pune, Maharashtra. The EMD is ₹2 L. It closes on 31 Oct 2026, 1:00 pm IST. Bid number GEM/2026/B/8061647.

Timeline

  1. Published10 Oct 2026 · 12:42 pm
  2. Reverse auctionIf the bid qualifies, after evaluation

Bidding

Bid type
Bid
Evaluation method
Total value wise evaluation
Packet type
Two Packet Bid
Reverse auction
Yes, H1-Highest Priced Bid Elimination
Total quantity
14,243

Buyer

Created by
vikastomarmilit
Location
Pune · Maharashtra
Portal
GeM

Important dates

Published
10 Oct 2026, 12:42 pm IST
Closes
31 Oct 2026, 1:00 pm IST

Items & delivery

18 items · Address masked by GeM

Delivery location · all items

***********Pune

GeM masks the full address in this document.
Showing 18 of 18
01Armored Fiber Cable With LayingQuantityNot statedDelivery90 daysDetailsClose
Delivery
90 days
02Media ConverterQuantityNot statedDelivery90 daysDetailsClose
Delivery
90 days
03Power PointQuantityNot statedDelivery90 daysDetailsClose
Delivery
90 days
04SplicingQuantityNot statedDelivery90 daysDetailsClose
Delivery
90 days
05Fiber Patch CordQuantityNot statedDelivery90 daysDetailsClose
Delivery
90 days
06LAN Patch CordQuantityNot statedDelivery90 daysDetailsClose
Delivery
90 days
07LIU LoadedQuantityNot statedDelivery90 daysDetailsClose
Delivery
90 days
08Fiber BoxQuantityNot statedDelivery90 daysDetailsClose
Delivery
90 days
09Wall Mount RackQuantityNot statedDelivery90 daysDetailsClose
Delivery
90 days
10High End Server PC With VMS SoftwareQuantityNot statedDelivery90 daysDetailsClose
Delivery
90 days
11Display TV 75 InchQuantityNot statedDelivery90 daysDetailsClose
Delivery
90 days
12Fiber POE SwitchQuantityNot statedDelivery90 daysDetailsClose
Delivery
90 days
13NVR 08 Ch Along With 2TB Hard DiscQuantityNot statedDelivery90 daysDetailsClose
Delivery
90 days
14IP Bullet CameraQuantityNot statedDelivery90 daysDetailsClose
Delivery
90 days
15LAN CableQuantityNot statedDelivery90 daysDetailsClose
Delivery
90 days
16Installation Of New CameraQuantityNot statedDelivery90 daysDetailsClose
Delivery
90 days
17Upgradation Of Old System To New System Set UpQuantityNot statedDelivery90 daysDetailsClose
Delivery
90 days
18Warranty And AMC For 3 YearsQuantityNot statedDelivery90 daysDetailsClose
Delivery
90 days

Tender documents

Bid files and supporting documents, linked directly from GeM.

Policy & contract references

Documents you must submit

  • Experience Criteria
  • Past Performance
  • Bidder Turnover
  • Certificate (Requested in ATC)
  • OEM Authorization Certificate
  • OEM Annual Turnover
Show all 8
  • Additional Doc 1 (Requested in ATC)
  • Compliance of BoQ specification and supporting document

Eligibility

Experience

3 years

Min. turnover

₹30 L

a year, 3-year average

OEM turnover

₹2 Cr

Past performance

50%

of the bid quantity

Experience & turnover exemptions

Micro & small enterprises (MSE)

Complete exemption
Exemption conditions

Yes | Complete

View PDF · p. 2

Exemptions depend on the evidence and conditions specified in the bid.

Preferences & relaxations

  • MSE purchase preference
  • MII preference
  • Class-1/2 local suppliers
  • EMD exemption: no
  • Inspection required: no

Check each criterion against the tender notice before you bid.

Commercial conditions

EMD
₹200,000
Performance guarantee
5% for 50 months
Offer validity
180 days

Buyer requirements & conditions

Buyer-added conditions from the bid document.

OPTION CLAUSE: The Purchaser reserves the right to increase or decrease the quantity to be ordered up to 25 percent of bid quantity at the time of placement of contract. The purchaser also reserves the right to increase the ordered quantity up to 25% of the contracted quantity during the currency of the contract at the contracted rates. The delivery period of quantity shall commence from the last date of original delivery order and in cases where option clause is exercised during the extended delivery period the additional time shall commence from the last date of extended delivery period. The additional delivery time shall be (Increased quantity ÷ Original quantity) × Original delivery period (in days), subject to minimum of 30 days. If the original delivery period is less than 30 days, the additional time equals the original delivery period. The Purchaser may extend this calculated delivery duration up to the original delivery period while exercising the option clause. Bidders must comply with these terms.

Actual delivery (and Installation & Commissioning (if covered in scope of supply)) is to be done at following address DEPT OF LOGISTICS, MILIT, GIRINAGAR, PUNE, PIN-411025 .

Data Sheet of the product(s) offered in the bid, are to be uploaded along with the bid documents. Buyers can match and verify the Data Sheet with the product specifications offered. In case of any unexplained mismatch of technical parameters, the bid is liable for rejection.

Experience Criteria: The Bidder or its OEM {themselves or through reseller(s)} should have regularly, manufactured and supplied same or similar Category Products to any Central / State Govt Organization / PSU for 3 years before the bid opening date. Copies of relevant contracts to be submitted along with bid in support of having supplied some quantity during each of the year. In case of bunch bids, the primary product having highest value should meet this criterion.

Installation, Commissioning, Testing, Configuration, Training (if any - which ever is applicable as per scope of supply) is to be carried out by OEM / OEM Certified resource or OEM authorised Reseller.

Non return of Hard Disk: As per Buyer organization’s Security Policy,Faulty Hard Disk of Servers/Desktop Computers/ Laptops etc. will not be returned back to the OEM/supplier against warranty replacement.

NON DISCLOSURE DECLARATION CERTIFICATE (On Bidder Letter Head) to be uploaded with bid:

  • 1.I M/s. ...................................................................... hereby declare that I shall not disclose the contract or any provision, specification, plan, design, pattern, sample or information thereof to any third party during and after expiry of Contract.
  • 2.If defying the norms as per the Contract a legal action may be taken against me as per the existing Rules.

Manufacturer Authorization:Wherever Authorised Distributors/service providers are submitting the bid, Authorisation Form /Certificate with OEM/Original Service Provider details such as name, designation, address, e-mail Id and Phone No. required to be furnished along with the bid

Products supplied shall be nontoxic and harmless to health. In the case of toxic materials, Material Safety Data Sheet may be furnished along with the material.

11

Scope of Supply

View PDF · p. 16

Scope of supply (Bid price to include all cost components) : Supply Installation Testing Commissioning of Goods and Training of operators and providing Statutory Clearances required (if any)

IMPORTED PRODUCTS: In case of imported products, OEM or Authorized Seller of OEM should have a registered office in India to provide after sales service support in India. The certificate to this effect should be submitted.

Warranty period of the supplied products shall be 1 years from the date of final acceptance of goods or after completion of installation, commissioning & testing of goods (if included in the scope of supply), at consignee location. OEM Warranty certificates must be submitted by Successful Bidder at the time of delivery of Goods. The seller should guarantee the rectification of goods in case of any break down during the guarantee period. Seller should have well established Installation, Commissioning, Training, Troubleshooting and Maintenance Service group in INDIA for attending the after sales service. Details of Service Centres near consignee destinations are to be uploaded along with the bid.

  • 14.Past Project Experience Proof for Past Experience and Project Experience clause: For fulfilling the experience criteria any one of the following documents may be considered as valid proof for meeting the experience criteria:a. Contract copy along with Invoice(s) with self-certification by the bidder that service/supplies against the invoices have been executed.b. Execution certificate by client with contract value.c. Any other document in support of contract execution like Third Party Inspection release note, etc.Proof for Past Experience and Project Experience clause: For fulfilling the experience criteria any one of the following documents may be considered as valid proof for meeting the experience criteria:a. Contract copy along with Invoice(s) with self-certification by the bidder that service/supplies against the invoices have been executed.b. Execution certificate by client with contract value.c. Any other document in support of contract execution like Third Party Inspection release note, etc.
15

Forms of EMD and PBG

View PDF · p. 16

Bidders can also submit the EMD with Fixed Deposit Receipt made out or pledged in the name of A/C COMMANDANT, MILIT . The bank should certify on it that the deposit can be withdrawn only on the demand or with the sanction of the pledgee. For release of EMD, the FDR will be released in the favour of the bidder by the Buyer after making endorsement on the back of the FDR duly signed and stamped along with covering letter. Bidder has to upload scanned copy/ proof of the FDR along with bid and has to ensure delivery of hardcopy to the Buyer within 5 days of Bid End date/ Bid Opening date

16

Forms of EMD and PBG

View PDF · p. 17

Successful Bidder can submit the Performance Security in the form of Fixed Deposit Receipt also (besides PBG which is allowed as per GeM GTC). FDR should be made out or pledged in the name of COMMANDANT, MILIT A/C (Name of the Seller). The bank should certify on it that the deposit can be withdrawn only on the demand or with the sanction of the pledgee. For release of Security Deposit, the FDR will be released in favour of bidder by the Buyer after making endorsement on the back of the FDR duly signed and stamped along with covering letter. Successful Bidder has to upload scanned copy of the FDR document in place of PBG and has to ensure delivery of hard copy of Original FDR to the Buyer within 15 days of award of contract.

17

Buyer Added Bid Specific ATC

View PDF · p. 17

Buyer Added text based ATC clauses Attending of pre-bid is mandatory along with site survey. Bidders are to submit the site survey certificate al ong with the bid for technical qualification. .

Similar open tenders

Soonest first

Search similar in the explorerFind this tender in the explorer

Open on GeM