11 facts from the tender

Ministry of Power published this goods tender on GeM on 29 Sep 2026, for East Nimar, Madhya Pradesh. No EMD is required. It was withdrawn on 7 Oct 2026, before its 9 Oct 2026 deadline. Bid number GEM/2026/B/8070350.

This bid was withdrawn from GeM before its deadline (Tenderlelo found it gone on 7 Oct 2026): the buyer cancelled or pulled it, so it no longer takes offers. The portal page may still open.

Timeline

  1. Published29 Sep 2026 · 4:21 pm
  2. Withdrawn7 Oct 2026

Bidding

Bid type
Bid
Evaluation method
Total value wise evaluation
Packet type
Two Packet Bid
Reverse auction
No
Total quantity
1,218

Buyer

Created by
MWbuyer2
Location
East Nimar · Madhya Pradesh
Portal
GeM

Important dates

Published
29 Sep 2026, 4:21 pm IST
Withdrawn
7 Oct 2026
Was to close
9 Oct 2026, 5:00 pm IST

Items & delivery

26 items · 1 delivery location

Delivery location · all items

450119,Indira Sagar Power Station, NHDC Office Complex, Narmada Nagar

Showing 26 of 26
01Brazing TorchQuantityNot statedDelivery30 daysDetailsClose
Delivery
30 days
02Earthing ClampQuantityNot statedDelivery30 daysDetailsClose
Delivery
30 days
03Welding Cable 50Sq.mmQuantityNot statedDelivery30 daysDetailsClose
Delivery
30 days
04Welding HelmetQuantityNot statedDelivery30 daysDetailsClose
Delivery
30 days
05Grinding Helmet Face ShieldQuantityNot statedDelivery30 daysDetailsClose
Delivery
30 days
06Leather Hand GlovesQuantityNot statedDelivery30 daysDetailsClose
Delivery
30 days
07Leg SleeveQuantityNot statedDelivery30 daysDetailsClose
Delivery
30 days
08Leather Hand SleeveQuantityNot statedDelivery30 daysDetailsClose
Delivery
30 days
09Spark Lighter Or Gas LighterQuantityNot statedDelivery30 daysDetailsClose
Delivery
30 days
10Hose Pipe DA GasQuantityNot statedDelivery30 daysDetailsClose
Delivery
30 days
11Hose Pipe Oxygen GasQuantityNot statedDelivery30 daysDetailsClose
Delivery
30 days
12DA Gas RegulatorQuantityNot statedDelivery30 daysDetailsClose
Delivery
30 days
13Oxygen Gas RegulatorQuantityNot statedDelivery30 daysDetailsClose
Delivery
30 days
14Brazing RodQuantityNot statedDelivery30 daysDetailsClose
Delivery
30 days
15Welding Electrode Holder 600 AmpQuantityNot statedDelivery30 daysDetailsClose
Delivery
30 days
16Welding Glass BlackQuantityNot statedDelivery30 daysDetailsClose
Delivery
30 days
17Welding Glass WhiteQuantityNot statedDelivery30 daysDetailsClose
Delivery
30 days
18Leather ApronQuantityNot statedDelivery30 daysDetailsClose
Delivery
30 days
19Welding GogglesQuantityNot statedDelivery30 daysDetailsClose
Delivery
30 days
20Cylinder KeyQuantityNot statedDelivery30 daysDetailsClose
Delivery
30 days
21Oil StoneQuantityNot statedDelivery30 daysDetailsClose
Delivery
30 days
22Grinding Wheel 4 InchQuantityNot statedDelivery30 daysDetailsClose
Delivery
30 days
23Cutting Wheel 4 InchQuantityNot statedDelivery30 daysDetailsClose
Delivery
30 days
24Grinding Wheel 5 InchQuantityNot statedDelivery30 daysDetailsClose
Delivery
30 days
25Cutting Wheel 5 InchQuantityNot statedDelivery30 daysDetailsClose
Delivery
30 days
26Manual Metal Arc Welding (MMA) Machine (V3)Quantity3 piecesDelivery30 daysDetailsClose
Delivery
30 days

Specifications & requirements

Specification Name
बड के िलए आवPयक अनुमत मूWय /Bid Requirement (Allowed Values)
Technology
Insulated Gate Bipolar Transistor (IGBT)
Power Supply (Tolerance +- 10%)
230 V Single Phase (50/60Hz)
Maximum Welding Current at 60% duty cycle (In Amp) (Tolerance +- 10%)
200, 250, 300, 400, 500, 600
No Load Voltage (In V)
>=50<=60
Rated Welding Voltage (In V)
>=20<=30, >30<=40, >40<=44
Efficiency (In %)
>75<=80, >80<=85, >85<=90 Or higher
Degree of protection (IP)
IP21, IP23
Protection
Over Temperature, Over Current

Tender documents

Bid files and supporting documents, linked directly from GeM.

Policy & contract references

Documents you must submit

  • Compliance of BoQ specification and supporting document

Eligibility

Experience & turnover exemptions

Micro & small enterprises (MSE)

Complete exemption
Exemption conditions

Yes | Complete

View PDF · p. 5

Exemptions depend on the evidence and conditions specified in the bid.

Preferences & relaxations

  • MSE purchase preference
  • EMD exemption
  • MII preference: no
  • Inspection required: no

Check each criterion against the tender notice before you bid.

Commercial conditions

EMD
Not required
Performance guarantee
Not required
Offer validity
180 days

Payment terms

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

View PDF · p. 6

Buyer requirements & conditions

Buyer-added conditions from the bid document.

OPTION CLAUSE: The Purchaser reserves the right to increase or decrease the quantity to be ordered up to 25 percent of bid quantity at the time of placement of contract. The purchaser also reserves the right to increase the ordered quantity up to 25% of the contracted quantity during the currency of the contract at the contracted rates. The delivery period of quantity shall commence from the last date of original delivery order and in cases where option clause is exercised during the extended delivery period the additional time shall commence from the last date of extended delivery period. The additional delivery time shall be (Increased quantity ÷ Original quantity) × Original delivery period (in days), subject to minimum of 30 days. If the original delivery period is less than 30 days, the additional time equals the original delivery period. The Purchaser may extend this calculated delivery duration up to the original delivery period while exercising the option clause. Bidders must comply with these terms.

Data Sheet of the product(s) offered in the bid, are to be uploaded along with the bid documents. Buyers can match and verify the Data Sheet with the product specifications offered. In case of any unexplained mismatch of technical parameters, the bid is liable for rejection.

Bidders are advised to check applicable GST on their own before quoting. Buyer will not take any responsibility in this regards. GST reimbursement will be as per actuals or as per applicable rates (whichever is lower), subject to the maximum of quoted GST %.

Bidders shall quote only those products (Part of Service delivery) in the bid which are not obsolete in the market and has at least 3 years residual market life i.e. the offered product shall not be declared end-of- life by the OEM before this period.

05

Scope of Supply

View PDF · p. 21

Scope of supply (Bid price to include all cost components) : Only supply of Goods

Materials shall be guaranteed for 12 months from the date of commissioning or 18 months from the date of supply whichever is earlier.

07

Buyer Added Bid Specific ATC

View PDF · p. 21

Buyer uploaded ATC document Click here to view the file.

Similar open tenders

Soonest first

Search similar in the explorerFind this tender in the explorer

Open on GeM