High Precision Long Travel Bi-Axial Linear Scanning Stage
400085,Material Receipt Cell (MRC), North Gate, Central Stores Unit, BARC, TROMBAY, MUMBAI
- Delivery
- 120 days
Directorate Of Purchase And Stores
PMO › Department of Atomic Energy
Delivers to
Mumbai, Maharashtra
PMO published this goods tender on GeM on 9 Oct 2026, for Mumbai, Maharashtra. The EMD is ₹90,000. It closes on 2 Nov 2026, 4:00 pm IST. Bid number GEM/2026/B/8103367.
1 item · 1 delivery location
400085,Material Receipt Cell (MRC), North Gate, Central Stores Unit, BARC, TROMBAY, MUMBAI
No matching items. Try another name, code or schedule.
Bid files and supporting documents, linked directly from GeM.
Full bid details and conditions
Applies to item 1
Yes | Complete
View PDF · p. 1Yes | Complete
View PDF · p. 1Exemptions depend on the evidence and conditions specified in the bid.
Check each criterion against the tender notice before you bid.
Buyer-added conditions from the bid document.
Scope of supply (Bid price to include all cost components) : Only supply of Goods
Pre-dispatch inspection at Seller premises (Fee/Charges to be borne by the BUYER): Before dispatch, the goods will be inspected by Buyer / Consignee or their Authorized Representative or by Nominated External Inspection Agency (independently or jointly with Buyer or Consignee as decided by the Buyer) at Seller premises (or at designated place for inspection as declared / communicated by the seller) for their compliance to the contract specifications. Fee/Charges taken by the External inspection Agency and any external laboratories testing charges shall be borne by the Buyer. For in-house testing, the Sellers will provide necessary facilities free of cost. Seller shall notify the Buyer through e-mail about readiness of goods for pre-dispatch inspection and Buyer will notify the Seller about the Authorized Representative/ Nominated External Inspection Agency and the date for testing. The goods would be dispatched to consignee only after clearance in pre-dispatch inspection. Consignee's right of rejection as per GTC in respect of the goods finally received at his location shall in no way be limited or waived by reason of the goods having previously been inspected, tested and passed by Buyer/ Consignee or its Nominated External Inspection Agency prior to the goods' shipment. While bidding, the sellers should take into account 7 days for inspection from the date of email offering the goods for inspection. Any delay in inspection beyond 7 days shall be on the part of the buyer and shall be regularised without Liquidated Damages. When there is requirement of submission the advance sample, the seller shall inform the buyer promptly through emails about the date of submission of sample to the buyer nominated Inspection agency.
Buyer uploaded ATC document Click here to view the file.
Warranty period of the supplied products shall be 1 years from the date of final acceptance of goods or after completion of installation, commissioning & testing of goods (if included in the scope of supply), at consignee location. OEM Warranty certificates must be submitted by Successful Bidder at the time of delivery of Goods. The seller should guarantee the rectification of goods in case of any break down during the guarantee period. Seller should have well established Installation, Commissioning, Training, Troubleshooting and Maintenance Service group in INDIA for attending the after sales service. Details of Service Centres near consignee destinations are to be uploaded along with the bid.
After award of contract – Successful Bidder shall have to get Detailed Design Drawings approved from buyer before starting fabrication. Successful Bidder shall submit Detailed Design Drawings for Buyer's approval, within 10 days of award of contract. Buyer shall, either approve the drawings or will provide complete list of modification required in the drawings within 7 days. Seller shall be required to ensure supply as per approved Drawings with modifications as communicated by Buyer. If there is delay from buyer side in approval of drawing– the delivery period shall be refixed without LD for the period of delay in approval of Drawing.
Buyer Added text based ATC clauses Kindly quote file no.A2/5385/PT for all official correspondence with us. Scope of supply includes Pre-dispatch Inspection, Supply and Warranty. Kindly refer ATC document for applicable terms & conditions. Successful Bidder can submit the Performance Security in the form of Account Payee Dema nd Draft also. DD should be made in favour of P&AO DPS payable at MUMBAI After award of contract, Successful Bidder can upload scanned copy of the DD in place of P BG and has to ensure delivery of hard copy to the original DD to the Buyer within 15 days o f award of contract. NOTE- Submission and approval • Approval of all Design & fabrication drawings prior to fabrication(Submission & Approval process shall be completed within 30 days after placement of purchase order) • Complete item and sub item list along-with delivery • Complete as built drawings along-with delivery .
Search similar in the explorerFind this tender in the explorer