Browse all bids
GeMWithdrawnGoodsBidCustom item

Miter Saw With Dust Collector And Roller

Bharat Electronics Limited (bel)

Ministry of Defence › Department of Defence Production

Delivers to

Maharashtra

Overview

11 facts from the tender

Ministry of Defence published this goods tender on GeM on 1 Oct 2026, for Maharashtra. No EMD is required. It was withdrawn on 7 Oct 2026, before its 12 Oct 2026 deadline. Bid number GEM/2026/B/8108775.

This bid was withdrawn from GeM before its deadline (Tenderlelo found it gone on 7 Oct 2026): the buyer cancelled or pulled it, so it no longer takes offers. The portal page may still open.

Timeline

  1. Published1 Oct 2026 · 4:22 pm
  2. Withdrawn7 Oct 2026

Bidding

Bid type
Bid
Evaluation method
Total value wise evaluation
Packet type
Two Packet Bid
Reverse auction
Yes, H1-Highest Priced Bid Elimination
Total quantity
1

Buyer

Created by
ajmore
Location
Maharashtra
Portal
GeM

Important dates

Published
1 Oct 2026, 4:22 pm IST
Withdrawn
7 Oct 2026
Was to close
12 Oct 2026, 5:00 pm IST

Items & delivery

1 item · Address masked by GeM

Item 1

Miter Saw With Dust Collector And Roller

Quantity1 Unit
Delivery location

***********Raigad

GeM masks the full address in this document.
Delivery
45 days

Tender documents

Bid files and supporting documents, linked directly from GeM.

Policy & contract references

Documents you must submit

  • Experience Criteria
  • Bidder Turnover
  • OEM Authorization Certificate
  • Additional Doc 1 (Requested in ATC)
  • Compliance of BoQ specification and supporting document

Eligibility

Experience & turnover exemptions

Exemptions depend on the evidence and conditions specified in the bid.

Preferences & relaxations

  • MSE purchase preference
  • MII preference
  • Class-1/2 local suppliers
  • EMD exemption
  • Inspection required: no

Check each criterion against the tender notice before you bid.

Commercial conditions

EMD
Not required
Performance guarantee
5% for 15 months
Offer validity
30 days

Payment terms

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

View PDF · p. 2

Buyer requirements & conditions

Buyer-added conditions from the bid document.

Bidders are advised to check applicable GST on their own before quoting. Buyer will not take any responsibility in this regards. GST reimbursement will be as per actuals or as per applicable rates (whichever is lower), subject to the maximum of quoted GST %.

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

  • a.Copy of PAN Card.
  • b.Copy of GSTIN.
  • c.Copy of Cancelled Cheque.
  • d.Copy of EFT Mandate duly certified by Bank.

Data Sheet of the product(s) offered in the bid, are to be uploaded along with the bid documents. Buyers can match and verify the Data Sheet with the product specifications offered. In case of any unexplained mismatch of technical parameters, the bid is liable for rejection.

Installation, Commissioning, Testing, Configuration, Training (if any - which ever is applicable as per scope of supply) is to be carried out by OEM / OEM Certified resource or OEM authorised Reseller.

Manufacturer Authorization:Wherever Authorised Distributors/service providers are submitting the bid, Authorisation Form /Certificate with OEM/Original Service Provider details such as name, designation, address, e-mail Id and Phone No. required to be furnished along with the bid

OPTION CLAUSE: The Purchaser reserves the right to increase or decrease the quantity to be ordered up to 50 percent of bid quantity at the time of placement of contract. The purchaser also reserves the right to increase the ordered quantity up to 50% of the contracted quantity during the currency of the contract at the contracted rates. The delivery period of quantity shall commence from the last date of original delivery order and in cases where option clause is exercised during the extended delivery period the additional time shall commence from the last date of extended delivery period. The additional delivery time shall be (Increased quantity ÷ Original quantity) × Original delivery period (in days), subject to minimum of 30 days. If the original delivery period is less than 30 days, the additional time equals the original delivery period. The Purchaser may extend this calculated delivery duration up to the original delivery period while exercising the option clause. Bidders must comply with these terms.

IMPORTED PRODUCTS: In case of imported products, OEM or Authorized Seller of OEM should have a registered office in India to provide after sales service support in India. The certificate to this effect should be submitted.

Warranty period of the supplied products shall be 1 years from the date of final acceptance of goods or after completion of installation, commissioning & testing of goods (if included in the scope of supply), at consignee location. OEM Warranty certificates must be submitted by Successful Bidder at the time of delivery of Goods. The seller should guarantee the rectification of goods in case of any break down during the guarantee period. Seller should have well established Installation, Commissioning, Training, Troubleshooting and Maintenance Service group in INDIA for attending the after sales service. Details of Service Centres near consignee destinations are to be uploaded along with the bid.

09

Certificates

View PDF · p. 6

Bidder's offer is liable to be rejected if they don't upload any of the certificates / documents sought in the Bid document, ATC and Corrigendum if any.

10

Buyer Added Bid Specific ATC

View PDF · p. 6

Buyer Added text based ATC clauses 1) Bidders are requested to provide duly signed and stamped Compliance to Technical Specification Docu ment as well as for other bid documents. 2) Material should be offered strictly confirming to BEL Specifications. The deviations in the specifications, if any, should be clearly indicated by the supplier in their quotation. 3) PBG: Duration of PBG should be warranty period plus additional 3 Months i.e (12+3 = 15 months) from the date of delivery. 4) Inco Terms: FOR,BEL NAVI MUMBAI UNIT 5) Warranty : Warranty period for complete pole shall be 12 Months from the date of installating and com missioning at BEL Navi Mumbai. 6) The Seller will be liable for remedial costs associated for provision of fraudulent/counterfeit products. 7) If any item is found defective/suspected to be counterfeit during verification at Receiving Inspection Sta ge, it will be sent to concerned GeM Authorities For raising Incidence in the GeM Portal. 8) In case of rejection, copy of inspection report will be forwarded to the supplier. Vendor shall ensure nec essary steps to take back the rejected item; else BEL will not be liable to send back the material after six months from the date of intimation by BEL. 9) Vendor shall replace/repair the rejected items latest within 1 month from the date of receipt. .

11

Buyer Added Bid Specific ATC

View PDF · p. 6

Buyer uploaded ATC document Click here to view the file.

Similar open tenders

Soonest first

Search similar in the explorerFind this tender in the explorer

Open on GeM