Browse all bids
GeMOpenGoodsBid

Surgical Operating ENT Microscope

Health and Family Welfare Department Delhi

North East

Delivers to

East Delhi, Delhi

Overview

10 facts from the tender

Health and Family Welfare Department Delhi published this goods tender on GeM on 9 Oct 2026, for East Delhi, Delhi. The EMD is ₹4 L. It closes on 30 Oct 2026, 2:00 pm IST. Bid number GEM/2026/B/8129471.

Timeline

  1. Published9 Oct 2026 · 1:34 pm
  2. Reverse auctionIf the bid qualifies, after evaluation

Bidding

Bid type
Bid
Evaluation method
Total value wise evaluation
Packet type
Two Packet Bid
Reverse auction
Yes, H1-Highest Priced Bid Elimination
Total quantity
2

Buyer

Created by
moicpurchase
Location
East Delhi · Delhi
Portal
GeM

Important dates

Published
9 Oct 2026, 1:34 pm IST
Closes
30 Oct 2026, 2:00 pm IST

Items & delivery

1 item · 1 delivery location

Item 1

Surgical Operating ENT Microscope

Quantity2 pieces
Delivery location

110095,Guru Teg Bahadur Hospital, Dilshad Garden

Delivery
90 days
Specifications & requirements · 33
Specification Name
बड के िलए आवPयक अनुमत मूWय /Bid Requirement (Allowed Values)
Confirmity to Manufactures Certification
ISO 9001 & ISO 13485
Magnification (5 Step)
0.4 X, 0.6 X, 1.2 X or 1.6 X, 2.5 X, >2.5 X
Manually adjustable magnification changer
1.6 X, 2.0 X, 2.5 X, 1.0 X,1.6 X, 2.5 X, > 2.5 X
Resolution of camera in pixels
700 x 450 px, 1920 x 1080 px, 3840 x 2160 px
Wide field push in eye pieces
12.5 X
Provision of integrated eye cups
Yes
Type of Binocular tube
0 degree to 180 degree inclinable
Provision of built in IR Filter
Yes
Provision of built in UR Filter
Yes
Adjustable friction of all joints
Yes
Provision of integerated handles for positioning of microscope
Yes
Focal length of Binocular tube in mm
170 mm, 200 mm, 300 mm, 400 mm, 500 mm
Specification Name
बड के िलए आवPयक अनुमत मूWय /Bid Requirement (Allowed Values)
Type of monitor (medical grade)
LED, LCD
Monitor resolution
700 x 450 px, 1920 x 1080 px, 3840 x 2160 px
Size of monitor screen in inch
21
Availability of CCD digital camera attachment
Yes
Facility of video recording facility with video trolley with isolating transformer
Yes (capacity 1 TB with 4.5 inch or more touch screen), Yes (capacity 500 GB with 4.5 inch or more touch screen), No
Availability of dust cover for microscope
Yes
Objective lens in mm
200 mm, 250 mm, 300 mm, 400 mm
Field of view in mm
52 mm to 8 mm, 112 mm to 11 mm, 15mm to 150 mm
Illumination
LED (with no backup)
Light source
LED
Facility of stand for bulb change
Yes, No
Power Back Up Provided
Online UPS System, 2 KVA
Back up time
15 Minutes
Facility of spike protection for 30 minutes
Yes
On screen display to be provided
Yes, No
ON Screen display showing total magnification, scale projection, working distance etc
NA if no screen display is provided
Warranty (Option of comprehensive warranty is available through bidding only, which if opted will supersede normal warranty in the catalogue)
5
Number of installations in Central/State/PSU Govt Hospitals
<3, >3
Demonstration
Physical Demonstration of the quoted model for the technical evaluation. Installation should be the sole responsibility of the vendor any accessories or modification needed for on-site installation should be done at no extra cost to the user department.

Tender documents

Bid files and supporting documents, linked directly from GeM.

Policy & contract references

Documents you must submit

  • Experience Criteria
  • Past Performance
  • Bidder Turnover
  • Certificate (Requested in ATC)
  • OEM Authorization Certificate
  • OEM Annual Turnover
Show all 8
  • Additional Doc 1 (Requested in ATC)
  • Additional Doc 2 (Requested in ATC)

Eligibility

Experience

3 years

Min. turnover

₹40 L

a year, 3-year average

OEM turnover

₹40 L

Past performance

50%

of the bid quantity

Experience & turnover exemptions

Micro & small enterprises (MSE)

Complete exemption
Exemption conditions

Yes | Complete

View PDF · p. 1

Exemptions depend on the evidence and conditions specified in the bid.

Preferences & relaxations

  • MSE purchase preference
  • MII preference: no
  • EMD exemption: no
  • Inspection required: no

Check each criterion against the tender notice before you bid.

Commercial conditions

EMD
₹400,000
Performance guarantee
5% for 62 months
Offer validity
180 days

Buyer requirements & conditions

Buyer-added conditions from the bid document.

OPTION CLAUSE: The Purchaser reserves the right to increase or decrease the quantity to be ordered up to 25 percent of bid quantity at the time of placement of contract. The purchaser also reserves the right to increase the ordered quantity up to 25% of the contracted quantity during the currency of the contract at the contracted rates. The delivery period of quantity shall commence from the last date of original delivery order and in cases where option clause is exercised during the extended delivery period the additional time shall commence from the last date of extended delivery period. The additional delivery time shall be (Increased quantity ÷ Original quantity) × Original delivery period (in days), subject to minimum of 30 days. If the original delivery period is less than 30 days, the additional time equals the original delivery period. The Purchaser may extend this calculated delivery duration up to the original delivery period while exercising the option clause. Bidders must comply with these terms.

  • 2.Provisions for workmen compensation, insurance, public liability, property damage, insurance etc. to be ensured by the contractor. Also, safety measures prescribed for working in Extra High Voltage & use of personnel protective equipment must be adhered to.

Bidder financial standing: The bidder should not be under liquidation, court receivership or similar proceedings, should not be bankrupt. Bidder to upload undertaking to this effect with bid.

Actual delivery (and Installation & Commissioning (if covered in scope of supply)) is to be done at following address GTB Hospital Dilshad Garden Delhi Delhi Delhi .

Bidders shall quote only those products (Part of Service delivery) in the bid which are not obsolete in the market and has at least 7 years residual market life i.e. the offered product shall not be declared end-of- life by the OEM before this period.

Consortium: In case of Contracts, wherein the seller alone does not have necessary expertise, the seller can form consortium with other sellers for submission of the bid, with one of the consortium company as leader. However, each and every member of the consortium shall be equally responsible for the complete execution of the project contract. An undertaking to this effect is to be uploaded with bid.

Data Sheet of the product(s) offered in the bid, are to be uploaded along with the bid documents. Buyers can match and verify the Data Sheet with the product specifications offered. In case of any unexplained mismatch of technical parameters, the bid is liable for rejection.

End User Certificate: Wherever Bidders are insisting for End User Certificate from the Buyer, same shall be provided in Buyer’s standard format only.

Experience Criteria: The Bidder or its OEM {themselves or through reseller(s)} should have regularly, manufactured and supplied same or similar Category Products to any Central / State Govt Organization / PSU for 3 years before the bid opening date. Copies of relevant contracts to be submitted along with bid in support of having supplied some quantity during each of the year. In case of bunch bids, the primary product having highest value should meet this criterion.

Installation, Commissioning, Testing, Configuration, Training (if any - which ever is applicable as per scope of supply) is to be carried out by OEM / OEM Certified resource or OEM authorised Reseller.

Malicious Code Certificate: The seller should upload following certificate in the bid:-

  • (a)This is to certify that the Hardware and the Software being offered, as part of the contract, does not contain Embedded Malicious code that would activate procedures to :-
  • (i)Inhibit the desires and designed function of the equipment.
  • (ii)Cause physical damage to the user or equipment during the exploitation.
  • (iii)Tap information resident or transient in the equipment/network.
  • (b)The firm will be considered to be in breach of the procurement contract, in case physical damage, loss of information or infringements related to copyright and Intellectual Property Right (IPRs) are caused due to activation of any such malicious code in embedded software.

Manufacturer Authorization:Wherever Authorised Distributors/service providers are submitting the bid, Authorisation Form /Certificate with OEM/Original Service Provider details such as name, designation, address, e-mail Id and Phone No. required to be furnished along with the bid

Non return of Hard Disk: As per Buyer organization’s Security Policy,Faulty Hard Disk of Servers/Desktop Computers/ Laptops etc. will not be returned back to the OEM/supplier against warranty replacement.

Shelf Life: The Product/Spare parts to be supplied as part of the services must have minimum 10 Shelf Life. On the date of supply, minimum 10 usable shelf life should be available / balance.

Scope of supply includes Training: Number of employees to be trained 5 , Place for Training GTB Hospital and Duration of training 2 days.

The successful bidder has to supply all essential accessories required for the successful installation and commissioning of the goods supplied. Besides standard accessories as per normal industry practice, following accessories must be part of supply and cost should be included in bid price: as per bid .

  • 1.The Seller shall not assign the Contract in whole or part without obtaining the prior written consent of buyer.
  • 2.The Seller shall not sub-contract the Contract in whole or part to any entity without obtaining the prior written consent of buyer.
  • 3.The Seller shall, notwithstanding the consent and assignment/sub-contract, remain jointly and severally liable and responsible to buyer together with the assignee/ sub-contractor, for and in respect of the due performance of the Contract and the Sellers obligations there under.

Without prejudice to Buyer’s right to price adjustment by way of discount or any other right or remedy available to Buyer, Buyer may terminate the Contract or any part thereof by a written notice to the Seller, if:

  • i)The Seller fails to comply with any material term of the Contract. ii) The Seller informs Buyer of its inability to deliver the Material(s) or any part thereof within the stipulated Delivery Period or such inability otherwise becomes apparent. iii) The Seller fails to deliver the Material(s) or any part thereof within the stipulated Delivery Period and/or to replace/rectify any rejected or defective Material(s) promptly. iv) The Seller becomes bankrupt or goes into liquidation.
  • v)The Seller makes a general assignment for the benefit of creditors. vi) A receiver is appointed for any substantial property owned by the Seller. vii) The Seller has misrepresented to Buyer, acting on which misrepresentation Buyer has placed the Purchase Order on the Seller.
19

Scope of Supply

View PDF · p. 10

Scope of supply (Bid price to include all cost components) : Supply Installation Testing Commissioning of Goods and Training of operators and providing Statutory Clearances required (if any)

  • 20.Turnover Bidder Turn Over Criteria: The minimum average annual financial turnover of the bidder during the last three years, ending on 31st March of the previous financial year, should be as indicated in the bid document. Documentary evidence in the form of certified Audited Balance Sheets of relevant periods or a certificate from the Chartered Accountant / Cost Accountant indicating the turnover details for the relevant period shall be uploaded with the bid. In case the date of constitution / incorporation of the bidder is less than 3 year old, the average turnover in respect of the completed financial years after the date of constitution shall be taken into account for this criteria.
  • 21.Turnover OEM Turn Over Criteria: The minimum average annual financial turnover of the OEM of the offered product during the last three years, ending on 31st March of the previous financial year, should be as indicated in the bid document. Documentary evidence in the form of certified Audited Balance Sheets of relevant periods or a certificate from the Chartered Accountant / Cost Accountant indicating the turnover details for the relevant period shall be uploaded with the bid. In case the date of constitution / incorporation of the OEM is less than 3 year old, the average turnover in respect of the completed financial years after the date of constitution shall be taken into account for this criteria. In case of bunch bids, the OEM of CATEGORY RELATED TO primary product having highest bid value should meet this criterion.

IMPORTED PRODUCTS: In case of imported products, OEM or Authorized Seller of OEM should have a registered office in India to provide after sales service support in India. The certificate to this effect should be submitted.

23

Service & Support

View PDF · p. 11

Availability of Service Centres: Bidder/OEM must have a Functional Service Centre in the State of each Consignee's Location in case of carry-in warranty. (Not applicable in case of goods having on-site warranty). If service center is not already there at the time of bidding, successful bidder / OEM shall have to establish one within 30 days of award of contract. Payment shall be released only after submission of documentary evidence of having Functional Service Centre.

24

Service & Support

View PDF · p. 11

Escalation Matrix For Service Support : Bidder/OEM must provide Escalation Matrix of Telephone Numbers for Service Support.

25

Service & Support

View PDF · p. 11

Dedicated /toll Free Telephone No. for Service Support : BIDDER/OEM must have Dedicated/toll Free Telephone No. for Service Support.

  • 26.Past Project Experience Proof for Past Experience and Project Experience clause: For fulfilling the experience criteria any one of the following documents may be considered as valid proof for meeting the experience criteria:a. Contract copy along with Invoice(s) with self-certification by the bidder that service/supplies against the invoices have been executed.b. Execution certificate by client with contract value.c. Any other document in support of contract execution like Third Party Inspection release note, etc.Proof for Past Experience and Project Experience clause: For fulfilling the experience criteria any one of the following documents may be considered as valid proof for meeting the experience criteria:a. Contract copy along with Invoice(s) with self-certification by the bidder that service/supplies against the invoices have been executed.b. Execution certificate by client with contract value.c. Any other document in support of contract execution like Third Party Inspection release note, etc.
27

Forms of EMD and PBG

View PDF · p. 11

Bidders can also submit the EMD with Fixed Deposit Receipt made out or pledged in the name of A/C Medical Superintendent, GTBH . The bank should certify on it that the deposit can be withdrawn only on the demand or with the sanction of the pledgee. For release of EMD, the FDR will be released in the favour of the bidder by the Buyer after making endorsement on the back of the FDR duly signed and stamped along with covering letter. Bidder has to upload scanned copy/ proof of the FDR along with bid and has to ensure delivery of hardcopy to the Buyer within 5 days of Bid End date/ Bid Opening date

28

Forms of EMD and PBG

View PDF · p. 12

Successful Bidder can submit the Performance Security in the form of Fixed Deposit Receipt also (besides PBG which is allowed as per GeM GTC). FDR should be made out or pledged in the name of Medical Superintendent, GTBH A/C (Name of the Seller). The bank should certify on it that the deposit can be withdrawn only on the demand or with the sanction of the pledgee. For release of Security Deposit, the FDR will be released in favour of bidder by the Buyer after making endorsement on the back of the FDR duly signed and stamped along with covering letter. Successful Bidder has to upload scanned copy of the FDR document in place of PBG and has to ensure delivery of hard copy of Original FDR to the Buyer within 15 days of award of contract.

29

Buyer Added Bid Specific ATC

View PDF · p. 12

Buyer uploaded ATC document Click here to view the file.

30

Financial Criteria

View PDF · p. 12

NET WORTH: Net Worth of the OEM should be positive as per the last audited financial statement.

31

Certificates

View PDF · p. 12

ISO 9001: The bidder or the OEM of the offered products must have ISO 9001 certification.

32

Certificates

View PDF · p. 12

Material Test Certificate Should Be Sent Along with The Supply. The Material Will Be Checked by Buyer’s Lab & the Results of the Lab will be the Sole Criteria for Acceptance of the Item.

33

Certificates

View PDF · p. 12

The bidder is required to upload, along with the bid, all relevant certificates such as BIS licence, type test certificate, approval certificates and other certificates as prescribed in the Product Specification given in the bid document.

Bidder / OEM has to give an undertaking that after expiry of warranty period, it will provide Comprehensive Maintenance Service for next 5 years for the offered products at the rate not more than 5 % of contract price per annum. Buyer reserves the right to enter into a CMC agreement with the Successful Bidder / OEM after expiry of the Warranty period at above mentioned rate and the payment for the CMC charges would be made Annually after rendering of the CMC Services of the relevant CMC period. Performance Security of the successful bidder shall be forfeited if it fails to accept the CMC contract when called upon by the buyer. CMC would include cost of as per bid (Upload the undertaking). The original Performance Security of contract will be returned only after submission and verification of AMC Performance Security for 5% of total CMC value valid up to CMC period plus 2 months (if there is no other claim).

Warranty period of the supplied products shall be 5 years from the date of final acceptance of goods or after completion of installation, commissioning & testing of goods (if included in the scope of supply), at consignee location. OEM Warranty certificates must be submitted by Successful Bidder at the time of delivery of Goods. The seller should guarantee the rectification of goods in case of any break down during the guarantee period. Seller should have well established Installation, Commissioning, Training, Troubleshooting and Maintenance Service group in INDIA for attending the after sales service. Details of Service Centres near consignee destinations are to be uploaded along with the bid.

Over and above the normal Warranty terms as per GeM GTC, the successful bidder / OEM shall have to provide Comprehensive Warranty during the entire Standard warranty period as per contract. : The comprehensive warranty shall be covering the following scope 5 years (Upload an undertaking with the bid confirming compliance by the bidder if Bidder is taking onus of this compliance. In case OEM is taking onus of this compliance, OEM undertaking is to be uploaded along with Bidder undertaking)

Successful bidder will have to ensure that adequate number of dedicated technical service personals / engineers are designated / deployed for attending to the Service Request in a time bound manner and for ensuring Timely Servicing / rectification of defects during warranty period, as per Service level agreement indicated in the relevant clause of the bid.

Timely Servicing / rectification of defects during warranty period: After having been notified of the defects / service requirement during warranty period, Seller has to complete the required Service / Rectification within 3 days time limit. If the Seller fails to complete service / rectification with defined time limit, a penalty of 0.5% of Unit Price of the product shall be charged as penalty for each week of delay from the seller. Seller can deposit the penalty with the Buyer directly else the Buyer shall have a right to recover all such penalty amount from the Performance Security (PBG).Cumulative Penalty cannot exceed more than 10% of the total contract value after which the Buyer shall have the right to get the service / rectification done from alternate sources at the risk and cost of the Seller besides forfeiture of PBG. Seller shall be liable to re-imberse the cost of such service / rectification to the Buyer.

39

Buyer Added Bid Specific ATC

View PDF · p. 13

Buyer Added text based ATC clauses Buyers added conditions & specifications will supersede the technical specification otherwise selected thro ugh GeM parameters. .

Similar open tenders

Soonest first

Search similar in the explorerFind this tender in the explorer

Open on GeM