Browse all bids
GeMOpenGoodsBidBOQ

Generator

Indian Army

Ministry of Defence › Department of Military Affairs

Delivers to

Imphal West, Manipur

Overview

10 facts from the tender

Ministry of Defence published this goods tender on GeM on 8 Oct 2026, for Imphal West, Manipur. The estimated value is ₹19.9 L and the EMD is ₹39,730. It closes on 19 Oct 2026, 6:00 pm IST. Bid number GEM/2026/B/8133931.

Timeline

  1. Published8 Oct 2026 · 2:06 pm
  2. Reverse auctionIf the bid qualifies, after evaluation

Bidding

Bid type
Bid
Evaluation method
Total value wise evaluation
Packet type
Two Packet Bid
Reverse auction
Yes, H1-Highest Priced Bid Elimination
Total quantity
635

Buyer

Created by
ketan.262h
Location
Imphal West · Manipur
Portal
GeM

Important dates

Published
8 Oct 2026, 2:06 pm IST
Closes
19 Oct 2026, 6:00 pm IST

Items & delivery

5 items · Address masked by GeM

Delivery location · all items

***********Imphal West

GeM masks the full address in this document.
Item 1

5 KVA Silent Diesel Driven Generating Set

QuantityNot stated
Delivery
90 days

Tender documents

Documents you must submit

  • Experience Criteria
  • Past Performance
  • Bidder Turnover
  • Certificate (Requested in ATC)
  • OEM Authorization Certificate
  • OEM Annual Turnover
Show all 7
  • Compliance of BoQ specification and supporting document

Eligibility

Experience

3 years

Min. turnover

₹9 L

a year, 3-year average

OEM turnover

₹38 L

Past performance

80%

of the bid quantity

Experience & turnover exemptions

Exemptions depend on the evidence and conditions specified in the bid.

Preferences & relaxations

  • EMD exemption: no
  • Inspection required: no

Check each criterion against the tender notice before you bid.

Commercial conditions

EMD
₹39,730
Performance guarantee
5% for 24 months
Offer validity
180 days

Buyer requirements & conditions

Buyer-added conditions from the bid document.

After award of contract – Successful Bidder shall have to get Detailed Design Drawings approved from buyer before starting fabrication. Successful Bidder shall submit Detailed Design Drawings for Buyer's approval, within 5 days of award of contract. Buyer shall, either approve the drawings or will provide complete list of modification required in the drawings within 7 days. Seller shall be required to ensure supply as per approved Drawings with modifications as communicated by Buyer. If there is delay from buyer side in approval of drawing– the delivery period shall be refixed without LD for the period of delay in approval of Drawing.

Actual delivery (and Installation & Commissioning (if covered in scope of supply)) is to be done at following address 57 DIV AOR 57 DIV AOR 57 DIV AOR 57 DIV AOR 57 DIV AOR .

Bidder financial standing: The bidder should not be under liquidation, court receivership or similar proceedings, should not be bankrupt. Bidder to upload undertaking to this effect with bid.

Bidders are advised to check applicable GST on their own before quoting. Buyer will not take any responsibility in this regards. GST reimbursement will be as per actuals or as per applicable rates (whichever is lower), subject to the maximum of quoted GST %.

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

  • a.Copy of PAN Card.
  • b.Copy of GSTIN.
  • c.Copy of Cancelled Cheque.
  • d.Copy of EFT Mandate duly certified by Bank.

End User Certificate: Wherever Bidders are insisting for End User Certificate from the Buyer, same shall be provided in Buyer’s standard format only.

Consortium: In case of Contracts, wherein the seller alone does not have necessary expertise, the seller can form consortium with other sellers for submission of the bid, with one of the consortium company as leader. However, each and every member of the consortium shall be equally responsible for the complete execution of the project contract. An undertaking to this effect is to be uploaded with bid.

Experience Criteria: The Bidder or its OEM {themselves or through reseller(s)} should have regularly, manufactured and supplied same or similar Category Products to any Central / State Govt Organization / PSU for 3 years before the bid opening date. Copies of relevant contracts to be submitted along with bid in support of having supplied some quantity during each of the year. In case of bunch bids, the primary product having highest value should meet this criterion.

Installation, Commissioning, Testing, Configuration, Training (if any - which ever is applicable as per scope of supply) is to be carried out by OEM / OEM Certified resource or OEM authorised Reseller.

Manufacturer Authorization:Wherever Authorised Distributors/service providers are submitting the bid, Authorisation Form /Certificate with OEM/Original Service Provider details such as name, designation, address, e-mail Id and Phone No. required to be furnished along with the bid

NON DISCLOSURE DECLARATION CERTIFICATE (On Bidder Letter Head) to be uploaded with bid:

  • 1.I M/s. NAME OF THE FIRM ON LETTER HEAD hereby declare that I shall not disclose the contract or any provision, specification, plan, design, pattern, sample or information thereof to any third party during and after expiry of Contract.
  • 2.If defying the norms as per the Contract a legal action may be taken against me as per the existing Rules.

OPTION CLAUSE: The Purchaser reserves the right to increase or decrease the quantity to be ordered up to 50 percent of bid quantity at the time of placement of contract. The purchaser also reserves the right to increase the ordered quantity up to 50% of the contracted quantity during the currency of the contract at the contracted rates. The delivery period of quantity shall commence from the last date of original delivery order and in cases where option clause is exercised during the extended delivery period the additional time shall commence from the last date of extended delivery period. The additional delivery time shall be (Increased quantity ÷ Original quantity) × Original delivery period (in days), subject to minimum of 30 days. If the original delivery period is less than 30 days, the additional time equals the original delivery period. The Purchaser may extend this calculated delivery duration up to the original delivery period while exercising the option clause. Bidders must comply with these terms.

Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with MSE/MSME/ENLISTMENT IN HQ 3 CORPS for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR following a fair, transparent and reasonable procedure.)

Scope of supply includes Training: Number of employees to be trained 5 , Place for Training DIV AOR and Duration of training 5 days.

The successful bidder has to supply all essential accessories required for the successful installation and commissioning of the goods supplied. Besides standard accessories as per normal industry practice, following accessories must be part of supply and cost should be included in bid price: Including connecting items .

Without prejudice to Buyer’s right to price adjustment by way of discount or any other right or remedy available to Buyer, Buyer may terminate the Contract or any part thereof by a written notice to the Seller, if:

  • i)The Seller fails to comply with any material term of the Contract. ii) The Seller informs Buyer of its inability to deliver the Material(s) or any part thereof within the stipulated Delivery Period or such inability otherwise becomes apparent. iii) The Seller fails to deliver the Material(s) or any part thereof within the stipulated Delivery Period and/or to replace/rectify any rejected or defective Material(s) promptly. iv) The Seller becomes bankrupt or goes into liquidation.
  • v)The Seller makes a general assignment for the benefit of creditors. vi) A receiver is appointed for any substantial property owned by the Seller. vii) The Seller has misrepresented to Buyer, acting on which misrepresentation Buyer has placed the Purchase Order on the Seller.

WORLD BANK TERMS AND CONDITIONS: Special Terms and Conditions as defined by world bank at click here will also be applicable. APPLICABLE ONLY IN CASE OF WORLD BANK FUNDED PROJECTS.

IMPORTED PRODUCTS: In case of imported products, OEM or Authorized Seller of OEM should have a registered office in India to provide after sales service support in India. The certificate to this effect should be submitted.

Nominated Inspection Agency: On behalf of the Buyer organization, any one of the following Inspection Agency would be conducting inspection of stores before acceptance: Pre-dispatch Inspection at Seller Premises (applicable only if pre-dispatch inspection clause has been selected in ATC): Detailed by dept Post Receipt Inspection at consignee site before acceptance of stores: Detailed by dept

Testing of Sample: The testing of advance sample and bulk sample during PDI will be carried at the designated AHSP labs.When testing facilities are not available, the facilities of Govt labs/NABL/Accredited labs will be utilized. The testing charges outside the designated AHSP labs to be borne by seller's.

  • 21.Sample Clause After award of contract – Successful Bidder shall have to get advance sample approved from buyer before bulk manufacturing / starting bulk supplies. Successful Bidder shall submit 1 samples for Buyer's approval, within 5 days of award of contract. Buyer shall, as per contract specifications framework, either approve the advance sample or will provide complete list of modification required in the sample within 5 days of receipt of advance sample. Seller shall be required to ensure supply as per approved sample with modifications as communicated by Buyer. If there is delay from buyer side in approval of advance sample – the delivery period shall be refixed without LD for the period of delay in sample approval. In case, the sample is found to have major deviations / not conforming to the Contract specifications, the buyer at its discretion may call for fresh samples for approval before allowing bulk supplies or may terminate the contract after notifying the deviations to the seller. Unless otherwise provided in the contract, all samples required for test shall be supplied by the contractor free of cost. Where under the contract, the contractor is required to submit an advance sample, any expenses incurred by the contractor on or in connection with the production of stores in bulk, before the sample has been approved unconditionally shall be borne by the Seller and he shall not claim any compensation in the event of such sample being found unacceptable by the Buyer / Consignee.
22

Forms of EMD and PBG

View PDF · p. 10

Bidders can also submit the EMD with Account Payee Demand Draft in favour of CO 110 ENGR REGT payable at 39730 . Bidder has to upload scanned copy / proof of the DD along with bid and has to ensure delivery of hardcopy to the Buyer within 5 days of Bid End date / Bid Opening date.

23

Forms of EMD and PBG

View PDF · p. 10

Successful Bidder can submit the Performance Security in the form of Fixed Deposit Receipt also (besides PBG which is allowed as per GeM GTC). FDR should be made out or pledged in the name of CO 110 ENGR REGT A/C (Name of the Seller). The bank should certify on it that the deposit can be withdrawn only on the demand or with the sanction of the pledgee. For release of Security Deposit, the FDR will be released in favour of bidder by the Buyer after making endorsement on the back of the FDR duly signed and stamped along with covering letter. Successful Bidder has to upload scanned copy of the FDR document in place of PBG and has to ensure delivery of hard copy of Original FDR to the Buyer within 15 days of award of contract.

24

Financial Criteria

View PDF · p. 10

NET WORTH: Net Worth of the OEM should be positive as per the last audited financial statement.

25

Scope of Supply

View PDF · p. 11

Scope of supply (Bid price to include all cost components) : Supply Installation Testing Commissioning of Goods and Training of operators and providing Statutory Clearances required (if any)

26

Certificates

View PDF · p. 11

Bidder's offer is liable to be rejected if they don't upload any of the certificates / documents sought in the Bid document, ATC and Corrigendum if any.

27

Certificates

View PDF · p. 11

ISO 9001: The bidder or the OEM of the offered products must have ISO 9001 certification.

28

Certificates

View PDF · p. 11

Material Test Certificate Should Be Sent Along with The Supply. The Material Will Be Checked by Buyer’s Lab & the Results of the Lab will be the Sole Criteria for Acceptance of the Item.

29

Certificates

View PDF · p. 11

The bidder is required to upload, along with the bid, all relevant certificates such as BIS licence, type test certificate, approval certificates and other certificates as prescribed in the Product Specification given in the bid document.

30

Certificates

View PDF · p. 11

To be eligible for award of contract, Bidder / OEM must possess following Certificates / Test Reports on the date of bid opening (to be uploaded with bid): Manufacturing test report .

  • 31.Turnover Bidder Turn Over Criteria: The minimum average annual financial turnover of the bidder during the last three years, ending on 31st March of the previous financial year, should be as indicated in the bid document. Documentary evidence in the form of certified Audited Balance Sheets of relevant periods or a certificate from the Chartered Accountant / Cost Accountant indicating the turnover details for the relevant period shall be uploaded with the bid. In case the date of constitution / incorporation of the bidder is less than 3 year old, the average turnover in respect of the completed financial years after the date of constitution shall be taken into account for this criteria.
  • 32.Turnover OEM Turn Over Criteria: The minimum average annual financial turnover of the OEM of the offered product during the last three years, ending on 31st March of the previous financial year, should be as indicated in the bid document. Documentary evidence in the form of certified Audited Balance Sheets of relevant periods or a certificate from the Chartered Accountant / Cost Accountant indicating the turnover details for the relevant period shall be uploaded with the bid. In case the date of constitution / incorporation of the OEM is less than 3 year old, the average turnover in respect of the completed financial years after the date of constitution shall be taken into account for this criteria. In case of bunch bids, the OEM of CATEGORY RELATED TO primary product having highest bid value should meet this criterion.
33

Service & Support

View PDF · p. 11

Availability of Service Centres: Bidder/OEM must have a Functional Service Centre in the State of each Consignee's Location in case of carry-in warranty. (Not applicable in case of goods having on-site warranty). If service center is not already there at the time of bidding, successful bidder / OEM shall have to establish one within 30 days of award of contract. Payment shall be released only after submission of documentary evidence of having Functional Service Centre.

34

Service & Support

View PDF · p. 12

Dedicated /toll Free Telephone No. for Service Support : BIDDER/OEM must have Dedicated/toll Free Telephone No. for Service Support.

35

Service & Support

View PDF · p. 12

Escalation Matrix For Service Support : Bidder/OEM must provide Escalation Matrix of Telephone Numbers for Service Support.

Successful bidder will have to ensure that adequate number of dedicated technical service personals / engineers are designated / deployed for attending to the Service Request in a time bound manner and for ensuring Timely Servicing / rectification of defects during warranty period, as per Service level agreement indicated in the relevant clause of the bid.

Warranty period of the supplied products shall be 5 years from the date of final acceptance of goods or after completion of installation, commissioning & testing of goods (if included in the scope of supply), at consignee location. OEM Warranty certificates must be submitted by Successful Bidder at the time of delivery of Goods. The seller should guarantee the rectification of goods in case of any break down during the guarantee period. Seller should have well established Installation, Commissioning, Training, Troubleshooting and Maintenance Service group in INDIA for attending the after sales service. Details of Service Centres near consignee destinations are to be uploaded along with the bid.

Timely Servicing / rectification of defects during warranty period: After having been notified of the defects / service requirement during warranty period, Seller has to complete the required Service / Rectification within 3 days time limit. If the Seller fails to complete service / rectification with defined time limit, a penalty of 0.5% of Unit Price of the product shall be charged as penalty for each week of delay from the seller. Seller can deposit the penalty with the Buyer directly else the Buyer shall have a right to recover all such penalty amount from the Performance Security (PBG).Cumulative Penalty cannot exceed more than 10% of the total contract value after which the Buyer shall have the right to get the service / rectification done from alternate sources at the risk and cost of the Seller besides forfeiture of PBG. Seller shall be liable to re-imberse the cost of such service / rectification to the Buyer.

  • 39.Past Project Experience Proof for Past Experience and Project Experience clause: For fulfilling the experience criteria any one of the following documents may be considered as valid proof for meeting the experience criteria:a. Contract copy along with Invoice(s) with self-certification by the bidder that service/supplies against the invoices have been executed.b. Execution certificate by client with contract value.c. Any other document in support of contract execution like Third Party Inspection release note, etc.Proof for Past Experience and Project Experience clause: For fulfilling the experience criteria any one of the following documents may be considered as valid proof for meeting the experience criteria:a. Contract copy along with Invoice(s) with self-certification by the bidder that service/supplies against the invoices have been executed.b. Execution certificate by client with contract value.c. Any other document in support of contract execution like Third Party Inspection release note, etc.
  • 40.Ration Item ATCs Demurrage charges In case the rejected items are not lifted by the firm within 48 hrs, the demurrage charges at the rate of 0.5% of total contract value will be charged per day. In case the items are not lifted within a month, the same will be destroyed by the station board of officers and no claim will be admitted.Demurrage charges. In case the rejected items are not lifted by the firm within 48 hrs, the demurrage charges at the rate of 0.5% of total contract value will be charged per day. In case the items are not lifted within a month, the same will be destroyed by the station board of officers and no claim will be admitted.
  • 41.Ration Item ATCs Warranty The following Warranty clause will form part of the contract placed on successful Bidder :-
  • (a)The Seller warrants that the goods supplied under the contract conform to Defence Food Specification prescribed and shall perform according to the said Defence Food Specification in any climate and under all conditions of storage and movement in India (the warranty period of the item is as given in the Defence Food Specification attached from the date of acceptance of stores).
  • (b)The Seller warrants for a period of warranty as prescribed (the warranty period of the item is as given in the Defence Food Specification attached) from the date of acceptance of stores, that the goods/ stores supplied under the contract shall be free from all types of defects.
  • (c)Once the stocks are accepted by the verdict of CFL/ FIU, stocks are dispatched to various depots and stocked/issued to troops for consumption. This does not mean that the responsibility of supplier is over. At any point of time, the DGST or his authorised representative (s) may draw samples from the stocks supplied from locations where they are held at that point of time to confirm that the stocks supplied by the supplier are meeting the concerned DFS. Prior to drawl of such samples, the supplier will be intimated by the fastest means by the supply depot where the stocks are held to make available the authorised representative of the supplier within three working days in whose presence the sample will be drawn. Failing which, the sample will be drawn unilaterally and the decision on the same will be final and no representation in this regard will be accepted later.
  • (d)If within the period of warranty, after analysis of the samples drawn as per Para (c) above, the goods are reported by the Buyer to have failed to meet the quality parameters as per the Defence Food Specifications, the stock will be declared as “Failed to Perform within Warranty Period”. In the event of the supplies or part of it having been declared (during the period of warranty) as “Failed to Perform within Warranty Period” by the Director General of Supplies and Transport, QMG’s Branch, IHQ of MoD (Army), in New Delhi or any officer acting on his behalf whose opinion as to whether or not the particular consignment is meeting the quality as per DFS for the item, will be final and the seller will avail any one options as specified in the succeeding paras within a maximum period of 45 days from the date the notification letter is dispatched for such defect by the buyer, failing which, the buyer will take actions as deemed fit to recover from the supplier the price thereof together with all incidental and freight charges incurred from the place of delivery to the place where the supplies were ultimately condemned. The opinion of the BUYER or any officer acting on his behalf in regard to these charges will be final. This opinion shall be regarded as having been made without committing Govt in any way nor will such decision prejudice the Govt rights.
  • (e)Claims shall be prepared by the supply depots for the cost of affected quantity including GST and all incidental charges including transportation charges if any, and other incidental charges if any through CDP (APO). The stocks shall be segregated at the supply depot. The supplier is given two options in this eventuality. Option 1- Supplierwill make good the loss amounting the claim prepared by the concerned supply depot by depositing the money to PCDA (Delhi) within 30 days of intimation sent by APO to the supplier and supplier shall lift the stock (only once supplier has made the payment to PCDA(Delhi)) from locations where they are stored at that time within 45 days of date of issue letter by APO (with copy to all) on his own cost, failing which the stock shall be destroyed by a board of officers. It shall be the sole responsibility of the supplier to lift such stocks declared failed to perform within warranty in the stipulated time. Option 2- the Seller shall replace the same free of charge, within a maximum period of 45 days from the date the notification letter is dispatched for such defect by the buyer, failing which the stores will be destroyed in situ at SELLER’s risk and cost by a station board of officers. No DP extensions for the purpose is required and consequently the firm will have to furnish a fresh validity of PBG submitted, at APO. The fresh stock intended to replace with the affected stock, will undergo similar QC procedure as followed during initial acceptance of the stocks. The supplier will transport fit stocks to the supply depot where the affected stocks are held by his own cost and expense.
  • (f)The seller will intimate the buyer within 10 days of intimation dispatched by APO wrt the defect in such an event, the option he is willing to adopt along with the documents as under :-
  • (i)If the seller is willing for option 1, the intimation letter will also accompany the proof of the deposition of the claimable amount at PCDA Delhi.
  • (ii)If the seller is willing for option 2, the intimation letter will include the extension of the PBG for a corresponding period as per the warranty period mentioned in the DFS.
  • (g)In case, the seller fails to make good the loss or replace the affected stocks as desired, after the stipulated time period of 45 days, such stocks will be destroyed insitu. Appropriate legal action will be initiated against the supplier there after. Supplier cannot claim on the destruction of such stocks irrespective of the outcome of the legal action.
  • (h)Such stocks which are stored in forward depots/ units from where it cannot be retrieved for handing over to suppliers shall be destroyed by board of officers.
  • (j)The declaration by the Buyer or any officer acting on his behalf communicated to the SUPPLIER in writing that a particular consignment has been condemned will be taken by the SUPPLIER as the conclusive evidence of the proper communication of that consignment provided that such communication is issued by the Buyer within 45 days of the expiry of the warranty period. Nothing herein contain shall prejudice any other right of the BUYER in that behalf under this contract or otherwise.
  • (k)Warranty in case of any preponement of supplies at the request of the supplier will be valid as per the original Delivery Period. A confirmation for the same will be issued in writing by the supplier.
  • (l)The Supplier will have to refund to the government any claim under the warranty clause and other claim(s) that may arise out or under this agreement as soon as a demand to that effect is made by the Buyer failing which such claims will be recovered by adjustment against the performance security deposits. Should this sum be not sufficient to cover the full amount recoverable, the Supplier shall pay the remaining balance due to the government on demand. In respect of contracts providing for an execution by the Supplier of guarantee regarding maintenance of the wholesomeness of stores supplied, the performance security deposit or such portion thereof as may be decided by the Buyer may be withheld till the expiry of the warranty period relating to final supplies.

Similar open tenders

Soonest first

Search similar in the explorerFind this tender in the explorer

Open on GeM