Browse all bids
GeMOpenGoodsBidCustom item

PROVIDING, FIXING AND CONFIGURATION BIO-MATRIC MACHINE OF VARIOUS SUB-SUB STATION

Uttar Pradesh Power Corporation Limited (uppcl)

Energy Department Uttar Pradesh › Electricity Civil Transmission Circle 132 Kv S/s Martinpurwa Lucknow

Delivers to

Gorakhpur, Uttar Pradesh

Overview

10 facts from the tender

Energy Department Uttar Pradesh published this goods tender on GeM on 8 Oct 2026, for Gorakhpur, Uttar Pradesh. The EMD is ₹5,300. It closes on 19 Oct 2026, 6:00 pm IST. Bid number GEM/2026/B/8135759.

Timeline

  1. Published8 Oct 2026 · 5:31 pm

Bidding

Bid type
Bid
Evaluation method
Total value wise evaluation
Packet type
Two Packet Bid
Reverse auction
No
Total quantity
1

Buyer

Created by
buyer_gkp
Location
Gorakhpur · Uttar Pradesh
Portal
GeM

Important dates

Published
8 Oct 2026, 5:31 pm IST
Closes
19 Oct 2026, 6:00 pm IST

Items & delivery

1 item · 1 delivery location

Item 1

PROVIDING, FIXING AND CONFIGURATION BIO-MATRIC MACHINE OF VARIOUS SUB-SUB STATION

Quantity1 set
Delivery location

273002,Executive Engineer Electricity 400 KV Sub Station Division Mohaddipur, Gorakhpur

Delivery
15 days
Specifications & requirements

K.सं./S.N o. · Document Title · Description · 0रवस %5भार के अनुसार जीएसट/Applicable i.r.o. Items

K.सं./S.N o. · Document Title · Description · 0रवस %5भार के अनुसार जीएसट/Applicable i.r.o. Items

1 · PROVIDING, FIXING AND CONFIGURATION BIO-MATRIC MACHINE OF VARIOUS SUB-SUB STATION View · PROVIDING, FIXING AND CONFIGURATION BIO-MATRIC MACHINE OF VARIOUS SUB-SUB STATION · PROVIDING, FIXING AND CONFIGURATION BIO-MATRIC MACHINE OF VARIOUS SUB-SUB STATION(1)

Tender documents

Bid files and supporting documents, linked directly from GeM.

Policy & contract references

Documents you must submit

  • Experience Criteria
  • Past Performance
  • Bidder Turnover
  • OEM Annual Turnover
  • Compliance of BoQ specification and supporting document

Eligibility

Experience

2 years

Min. turnover

₹2 L

a year, 3-year average

OEM turnover

₹2 L

Past performance

80%

of the bid quantity

Experience & turnover exemptions

Exemptions depend on the evidence and conditions specified in the bid.

Preferences & relaxations

  • MSE purchase preference: no
  • MII preference: no
  • EMD exemption: no
  • Inspection required: no

Check each criterion against the tender notice before you bid.

Commercial conditions

EMD
₹5,300
Performance guarantee
5% for 12 months
Offer validity
180 days

Buyer requirements & conditions

Buyer-added conditions from the bid document.

OPTION CLAUSE: The Purchaser reserves the right to increase or decrease the quantity to be ordered up to 25 percent of bid quantity at the time of placement of contract. The purchaser also reserves the right to increase the ordered quantity up to 25% of the contracted quantity during the currency of the contract at the contracted rates. The delivery period of quantity shall commence from the last date of original delivery order and in cases where option clause is exercised during the extended delivery period the additional time shall commence from the last date of extended delivery period. The additional delivery time shall be (Increased quantity ÷ Original quantity) × Original delivery period (in days), subject to minimum of 30 days. If the original delivery period is less than 30 days, the additional time equals the original delivery period. The Purchaser may extend this calculated delivery duration up to the original delivery period while exercising the option clause. Bidders must comply with these terms.

02

Forms of EMD and PBG

View PDF · p. 5

Successful Bidder can submit the Performance Security in the form of Fixed Deposit Receipt also (besides PBG which is allowed as per GeM GTC). FDR should be made out or pledged in the name of Superintending Engineer, Electricity Transmission Circle, Gorakhpur, A/C (Name of the Seller). The bank should certify on it that the deposit can be withdrawn only on the demand or with the sanction of the pledgee. For release of Security Deposit, the FDR will be released in favour of bidder by the Buyer after making endorsement on the back of the FDR duly signed and stamped along with covering letter. Successful Bidder has to upload scanned copy of the FDR document in place of PBG and has to ensure delivery of hard copy of Original FDR to the Buyer within 15 days of award of contract.

03

Forms of EMD and PBG

View PDF · p. 5

Successful Bidder can submit the Performance Security in the form of Payment online through RTGS / internet banking also (besides PBG which is allowed as per GeM GTC). On-line payment shall be in Beneficiary name Superintending Engineer, Electricity Transmission Circle, Gorakhpur, Account No. 0183002100026359 IFSC Code PUNB0018300 Bank Name Punjab National Bank Branch address Bank Road, Gorakhpur . Successful Bidder to indicate Contract number and name of Seller entity in the transaction details field at the time of on-line transfer. Bidder has to upload scanned copy / proof of the Online Payment Transfer in place of PBG within 15 days of award of contract.

04

Buyer Added Bid Specific ATC

View PDF · p. 6

Buyer uploaded ATC document Click here to view the file.

Similar open tenders

Soonest first

Search similar in the explorerFind this tender in the explorer

Open on GeM