Browse all bids
GeMOpenGoodsBidBOQ

ARM CHP 2026 27 16TH BN

Indo Tibetan Border Police (itbp)

Ministry of Home Affairs › Central Armed Police Forces › 16 Bn

Delivers to

Leh, Ladakh

Overview

10 facts from the tender

Ministry of Home Affairs published this goods tender on GeM on 8 Oct 2026, for Leh, Ladakh. The estimated value is ₹5.4 L and no EMD is required. It closes on 30 Oct 2026, 4:00 pm IST. Bid number GEM/2026/B/8137049.

Timeline

  1. Published8 Oct 2026 · 11:31 pm
  2. Reverse auctionIf the bid qualifies, after evaluation

Bidding

Bid type
Bid
Evaluation method
Total value wise evaluation
Packet type
Two Packet Bid
Reverse auction
Yes, 50% Lowest Priced Technically Qualified Bidders
Total quantity
647

Buyer

Created by
acengr16thbn
Location
Leh · Ladakh
Portal
GeM

Important dates

Published
8 Oct 2026, 11:31 pm IST
Closes
30 Oct 2026, 4:00 pm IST

Items & delivery

21 items · 1 delivery location

Delivery location · all items

194101,COMMANDANT 16TH BN ITBP, CHOGLAMSAR, C/O 56 APO

Showing 21 of 21
01Providing And Replacement Of Glycol Motor Seal And Bearing Per Direction Of Engineer Incharge, Including Deduction Of Cost Of Old Unserviceable Motor SealQuantityNot statedDelivery120 daysDetailsClose
Delivery
120 days

Specifications & requirements

जीएसट पर इनपुट कर Mे(डट /ITC on GST · जीएसट उपकर कर Mे(डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · :रवस % ?भार के अनुसार जीएसट/GST as per RCM · :रवस % ?भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक7[पक :रवस% ?भार /Optional RCM

NA · NA · Yes · 18% · 0.1% · 0.1 (INR) - Per Unit · No

02Servicing And Rewinding Of 7.50 HP Monoblock Motor Including ProvidingQuantityNot statedDelivery120 daysDetailsClose
Delivery
120 days

Specifications & requirements

जीएसट पर इनपुट कर Mे(डट /ITC on GST · जीएसट उपकर कर Mे(डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · :रवस % ?भार के अनुसार जीएसट/GST as per RCM · :रवस % ?भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक7[पक :रवस% ?भार /Optional RCM

NA · NA · Yes · 18% · 0.1% · 0.1 (INR) - Per Unit · No

03Providing And Replacement Of Fan Coil Unit Connection Pipe Nipple Size 1inch As Per Direction Of Engineer InchargeQuantityNot statedDelivery120 daysDetailsClose
Delivery
120 days

Specifications & requirements

जीएसट पर इनपुट कर Mे(डट /ITC on GST · जीएसट उपकर कर Mे(डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · :रवस % ?भार के अनुसार जीएसट/GST as per RCM · :रवस % ?भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक7[पक :रवस% ?भार /Optional RCM

NA · NA · Yes · 18% · 0.1% · 0.1 (INR) - Per Unit · No

04Rewinding Of Fan Coil Unit Motor With Neccessory Repair Whichever Will Required During The Servicing, Labour Charges And Proper Testing Of Functioning Of MotorQuantityNot statedDelivery120 daysDetailsClose
Delivery
120 days

Specifications & requirements

जीएसट पर इनपुट कर Mे(डट /ITC on GST · जीएसट उपकर कर Mे(डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · :रवस % ?भार के अनुसार जीएसट/GST as per RCM · :रवस % ?भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक7[पक :रवस% ?भार /Optional RCM

NA · NA · Yes · 18% · 0.1% · 0.1 (INR) - Per Unit · No

05Providing And Servicing Of F.CU Air Filter As Per Direction Of Engineer InchargeQuantityNot statedDelivery120 daysDetailsClose
Delivery
120 days

Specifications & requirements

जीएसट पर इनपुट कर Mे(डट /ITC on GST · जीएसट उपकर कर Mे(डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · :रवस % ?भार के अनुसार जीएसट/GST as per RCM · :रवस % ?भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक7[पक :रवस% ?भार /Optional RCM

NA · NA · Yes · 18% · 0.1% · 0.1 (INR) - Per Unit · No

06Servicing Of Burner Including Required Deep Cleaning Up To Satisfactory Mark As Per Direction Of Engineer InchargeQuantityNot statedDelivery120 daysDetailsClose
Delivery
120 days

Specifications & requirements

जीएसट पर इनपुट कर Mे(डट /ITC on GST · जीएसट उपकर कर Mे(डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · :रवस % ?भार के अनुसार जीएसट/GST as per RCM · :रवस % ?भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक7[पक :रवस% ?भार /Optional RCM

NA · NA · Yes · 18% · 0.1% · 0.1 (INR) - Per Unit · No

07Providing And Replacement Of Burner Nozzle As Per Direction Of Engineer Incharge,QuantityNot statedDelivery120 daysDetailsClose
Delivery
120 days

Specifications & requirements

जीएसट पर इनपुट कर Mे(डट /ITC on GST · जीएसट उपकर कर Mे(डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · :रवस % ?भार के अनुसार जीएसट/GST as per RCM · :रवस % ?भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक7[पक :रवस% ?भार /Optional RCM

NA · NA · Yes · 18% · 0.1% · 0.1 (INR) - Per Unit · No

08Providing And Replacement Of Burner On Off Switch As Per Direction Of Engineer Incharge,QuantityNot statedDelivery120 daysDetailsClose
Delivery
120 days

Specifications & requirements

जीएसट पर इनपुट कर Mे(डट /ITC on GST · जीएसट उपकर कर Mे(डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · :रवस % ?भार के अनुसार जीएसट/GST as per RCM · :रवस % ?भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक7[पक :रवस% ?भार /Optional RCM

NA · NA · Yes · 18% · 0.1% · 0.1 (INR) - Per Unit · No

09Supplying Of Filling Of Glycol As Per Direction Of Engineer InchargeQuantityNot statedDelivery120 daysDetailsClose
Delivery
120 days

Specifications & requirements

जीएसट पर इनपुट कर Mे(डट /ITC on GST · जीएसट उपकर कर Mे(डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · :रवस % ?भार के अनुसार जीएसट/GST as per RCM · :रवस % ?भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक7[पक :रवस% ?भार /Optional RCM

NA · NA · Yes · 18% · 0.1% · 0.1 (INR) - Per Unit · No

10Providing And Replacement Pressure Gauge As Per Direction Of Engineer Incharge, Including Deduction Of Cost Of Old Unserviceable Pressure GaugeQuantityNot statedDelivery120 daysDetailsClose
Delivery
120 days

Specifications & requirements

जीएसट पर इनपुट कर Mे(डट /ITC on GST · जीएसट उपकर कर Mे(डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · :रवस % ?भार के अनुसार जीएसट/GST as per RCM · :रवस % ?भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक7[पक :रवस% ?भार /Optional RCM

NA · NA · Yes · 18% · 0.1% · 0.1 (INR) - Per Unit · No

11Providing And Replacement Photo Cell As Per Direction Of Engineer Incharge, Including Deduction Of Cost Of Old Burnt Photo CellQuantityNot statedDelivery120 daysDetailsClose
Delivery
120 days

Specifications & requirements

जीएसट पर इनपुट कर Mे(डट /ITC on GST · जीएसट उपकर कर Mे(डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · :रवस % ?भार के अनुसार जीएसट/GST as per RCM · :रवस % ?भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक7[पक :रवस% ?भार /Optional RCM

NA · NA · Yes · 18% · 0.1% · 0.1 (INR) - Per Unit · No

12Providing And Replacement Brass Gate Valve 25mm As Per Direction Of Engineer Incharge, Including Deduction Of Cost Of Old Unserviceable Brass Gate Valve 25mmQuantityNot statedDelivery120 daysDetailsClose
Delivery
120 days

Specifications & requirements

जीएसट पर इनपुट कर Mे(डट /ITC on GST · जीएसट उपकर कर Mे(डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · :रवस % ?भार के अनुसार जीएसट/GST as per RCM · :रवस % ?भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक7[पक :रवस% ?भार /Optional RCM

NA · NA · Yes · 18% · 0.1% · 0.1 (INR) - Per Unit · No

13Providing And Replacement Sequence Controller As Per Direction Of Engineer Incharge, Including Deduction Of Cost Of Old Unserviceable Sequence ControllerQuantityNot statedDelivery120 daysDetailsClose
Delivery
120 days

Specifications & requirements

जीएसट पर इनपुट कर Mे(डट /ITC on GST · जीएसट उपकर कर Mे(डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · :रवस % ?भार के अनुसार जीएसट/GST as per RCM · :रवस % ?भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक7[पक :रवस% ?भार /Optional RCM

NA · NA · Yes · 18% · 0.1% · 0.1 (INR) - Per Unit · No

14Providing And Replacement Burner Ignition Transformer As Per Direction Of Engineer Incharge, Including Deduction Of Cost Of Old Unserviceable Burner Ignition TransformerQuantityNot statedDelivery120 daysDetailsClose
Delivery
120 days

Specifications & requirements

जीएसट पर इनपुट कर Mे(डट /ITC on GST · जीएसट उपकर कर Mे(डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · :रवस % ?भार के अनुसार जीएसट/GST as per RCM · :रवस % ?भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक7[पक :रवस% ?भार /Optional RCM

NA · NA · Yes · 18% · 0.1% · 0.1 (INR) - Per Unit · No

15Providing And Replacement Burner Fuel Pump As Per Direction Of Engineer Incharge, Including Deduction Of Cost Of Old Unserviceable Burner Fuel PumpQuantityNot statedDelivery120 daysDetailsClose
Delivery
120 days

Specifications & requirements

जीएसट पर इनपुट कर Mे(डट /ITC on GST · जीएसट उपकर कर Mे(डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · :रवस % ?भार के अनुसार जीएसट/GST as per RCM · :रवस % ?भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक7[पक :रवस% ?भार /Optional RCM

जीएसट पर इनपुट कर Mे(डट /ITC on GST · जीएसट उपकर कर Mे(डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · :रवस % ?भार के अनुसार जीएसट/GST as per RCM · :रवस % ?भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक7[पक :रवस% ?भार /Optional RCM

NA · NA · Yes · 18% · 0.1% · 0.1 (INR) - Per Unit · No

16Servicing And Repair Of Motor Starter As Per Direction Of Engineer Incharge, Including Deduction Of Cost Of Old Unserviceable MaterialsQuantityNot statedDelivery120 daysDetailsClose
Delivery
120 days

Specifications & requirements

जीएसट पर इनपुट कर Mे(डट /ITC on GST · जीएसट उपकर कर Mे(डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · :रवस % ?भार के अनुसार जीएसट/GST as per RCM · :रवस % ?भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक7[पक :रवस% ?भार /Optional RCM

NA · NA · Yes · 18% · 0.1% · 0.1 (INR) - Per Unit · No

17Providing And Replacement Of F.C.U With Radiator Panel As Per Direction Of Engineer Incharge, Including Deduction Of Cost Of Old Unserviceable Heating Blower UnitQuantityNot statedDelivery120 daysDetailsClose
Delivery
120 days

Specifications & requirements

जीएसट पर इनपुट कर Mे(डट /ITC on GST · जीएसट उपकर कर Mे(डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · :रवस % ?भार के अनुसार जीएसट/GST as per RCM · :रवस % ?भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक7[पक :रवस% ?भार /Optional RCM

NA · NA · Yes · 18% · 0.1% · 0.1 (INR) - Per Unit · No

18Rejointing The CHP Heat Liquid Carrying Pipe By Repairing Pipe Jointing With Appropriate Material Etc As Per Direction Of Engineer Incharge.QuantityNot statedDelivery120 daysDetailsClose
Delivery
120 days

Specifications & requirements

जीएसट पर इनपुट कर Mे(डट /ITC on GST · जीएसट उपकर कर Mे(डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · :रवस % ?भार के अनुसार जीएसट/GST as per RCM · :रवस % ?भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक7[पक :रवस% ?भार /Optional RCM

NA · NA · Yes · 18% · 0.1% · 0.1 (INR) - Per Unit · No

19Servicing And Rewinding Of 0.5 HP Monoblock Motor Pump Including Providing And Fixing Copper WireQuantityNot statedDelivery120 daysDetailsClose
Delivery
120 days

Specifications & requirements

जीएसट पर इनपुट कर Mे(डट /ITC on GST · जीएसट उपकर कर Mे(डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · :रवस % ?भार के अनुसार जीएसट/GST as per RCM · :रवस % ?भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक7[पक :रवस% ?भार /Optional RCM

NA · NA · Yes · 18% · 0.1% · 0.1 (INR) - Per Unit · No

20Providign Insulation Of Nitrile Rubber Insulation Tube Of Wall Thickness 06-10 Mm For 80-110 Mm Dia PipesQuantityNot statedDelivery120 daysDetailsClose
Delivery
120 days

Specifications & requirements

जीएसट पर इनपुट कर Mे(डट /ITC on GST · जीएसट उपकर कर Mे(डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · :रवस % ?भार के अनुसार जीएसट/GST as per RCM · :रवस % ?भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक7[पक :रवस% ?भार /Optional RCM

NA · NA · Yes · 18% · 0.1% · 0.1 (INR) - Per Unit · No

21Providign Insulation Of Nitrile Rubber Insulation Tube Of Wall Thickness 06-10 Mm For 15-25 Mm Dia PipesQuantityNot statedDelivery120 daysDetailsClose
Delivery
120 days

Specifications & requirements

जीएसट पर इनपुट कर Mे(डट /ITC on GST · जीएसट उपकर कर Mे(डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · :रवस % ?भार के अनुसार जीएसट/GST as per RCM · :रवस % ?भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक7[पक :रवस% ?भार /Optional RCM

NA · NA · Yes · 18% · 0.1% · 0.1 (INR) - Per Unit · No

Tender documents

Bid files and supporting documents, linked directly from GeM.

Policy & contract references

Documents you must submit

  • Experience Criteria
  • Past Performance
  • Bidder Turnover
  • Certificate (Requested in ATC)
  • OEM Annual Turnover

Eligibility

Experience

2 years

Min. turnover

₹2 L

a year, 3-year average

OEM turnover

₹2 L

Past performance

50%

of the bid quantity

Experience & turnover exemptions

Micro & small enterprises (MSE)

Complete exemption
Exemption conditions

Yes | Complete

View PDF · p. 3

Exemptions depend on the evidence and conditions specified in the bid.

Preferences & relaxations

  • MSE purchase preference
  • MII preference
  • Class-1/2 local suppliers
  • EMD exemption
  • Inspection required: no

Check each criterion against the tender notice before you bid.

Commercial conditions

EMD
Not required
Performance guarantee
5% for 6 months
Offer validity
60 days

Buyer requirements & conditions

Buyer-added conditions from the bid document.

01

Scope of Supply

View PDF · p. 24

Scope of supply (Bid price to include all cost components) : Supply Installation Testing and Commissioning of Goods

Actual delivery (and Installation & Commissioning (if covered in scope of supply)) is to be done at following address Office of the Commandant 16th Bn ITBP Chuglamsar Leh .

03

Buyer Added Bid Specific ATC

View PDF · p. 24

Buyer uploaded ATC document Click here to view the file.

04

Service & Support

View PDF · p. 24

Availability of Service Centres: Bidder/OEM must have a Functional Service Centre in the State of each Consignee's Location in case of carry-in warranty. (Not applicable in case of goods having on-site warranty). If service center is not already there at the time of bidding, successful bidder / OEM shall have to establish one within 30 days of award of contract. Payment shall be released only after submission of documentary evidence of having Functional Service Centre.

Similar open tenders

Soonest first

Search similar in the explorerFind this tender in the explorer

Open on GeM