Browse all bids
GeMOpenGoodsBid

Modular Cold Room Storage For Fruits And Vegetables

Kumaon Division

Rural Development Department Uttarakhand › Cdo Pithoragarh

Delivers to

Pithoragarh, Uttarakhand

Overview

10 facts from the tender

Rural Development Department Uttarakhand published this goods tender on GeM on 9 Oct 2026, for Pithoragarh, Uttarakhand. No EMD is required. It closes on 19 Oct 2026, 12:00 pm IST. Bid number GEM/2026/B/8138025.

Timeline

  1. Published9 Oct 2026 · 11:25 am

Bidding

Bid type
Bid
Evaluation method
Total value wise evaluation
Packet type
Two Packet Bid
Reverse auction
No
Total quantity
3

Buyer

Created by
bhawanadhami0
Location
Pithoragarh · Uttarakhand
Portal
GeM

Important dates

Published
9 Oct 2026, 11:25 am IST
Closes
19 Oct 2026, 12:00 pm IST

Items & delivery

1 item · 1 delivery location

Item 1

Modular Cold Room Storage For Fruits And Vegetables

Quantity3 pieces
Delivery location

262501,Vikash Bhawan ,Pithoragarh

Delivery
45 days
Specifications & requirements · 16
Specification Name
बड के िलए आवNयक अनुमत मूTय /Bid Requirement (Allowed Values)
Wall pannel thickness in mm
60, 80, 100, 150
Ceiling panel thickness in mm
60, 80, 100, 150
Purpose
It is a prefabricated modular refrigerated room designed for storage of fruits and vegetables in an environment below the outdoor temperature
Type of cold storage
Modular cold room storage for fruits and vegetables
Storage capacity in metric ton (MT)
10 MT, 20 MT
Make refrigeration system
Middleby Celforst, Carrier, SeaBird, Blue Star, Lloyed, Voltas, Climatrol, Mechair
Refrigeration type
Vapour compression refrigeration
Refrigeration capacity in BTU
15000 BTU, 28000 BTU
Cold room door
Swing Type/Hinge door, Sliding door
Microprocessor based indicator display for easy readability provided
Inside cold room, Outside cold room, Both inside & outside cold room, Not supplied
Digital Voltage stabilizer provided
Yes, No
Warranty for the Product other than compressor in years
1, 2, 3, 4, 5
Warranty for compressor in years
5, 7
Availibility of test report from central Govt/NABL/ILAC accredited lab covering all parameters
Yes, No
Copies of test Reports/certificates and other certifications to be furnished to buyer on demand
Yes, No

Tender documents

Bid files and supporting documents, linked directly from GeM.

Policy & contract references

Documents you must submit

  • Experience Criteria
  • Past Performance
  • Bidder Turnover
  • Certificate (Requested in ATC)
  • OEM Authorization Certificate
  • OEM Annual Turnover
Show all 7
  • Additional Doc 1 (Requested in ATC)

Eligibility

Experience

3 years

Past performance

40%

of the bid quantity

Experience & turnover exemptions

Exemptions depend on the evidence and conditions specified in the bid.

Preferences & relaxations

  • MII preference
  • Class-1/2 local suppliers
  • EMD exemption
  • MSE purchase preference: no
  • Inspection required: no

Check each criterion against the tender notice before you bid.

Commercial conditions

EMD
Not required
Performance guarantee
Not required
Offer validity
30 days

Buyer requirements & conditions

Buyer-added conditions from the bid document.

OPTION CLAUSE: The Purchaser reserves the right to increase or decrease the quantity to be ordered up to 25 percent of bid quantity at the time of placement of contract. The purchaser also reserves the right to increase the ordered quantity up to 25% of the contracted quantity during the currency of the contract at the contracted rates. The delivery period of quantity shall commence from the last date of original delivery order and in cases where option clause is exercised during the extended delivery period the additional time shall commence from the last date of extended delivery period. The additional delivery time shall be (Increased quantity ÷ Original quantity) × Original delivery period (in days), subject to minimum of 30 days. If the original delivery period is less than 30 days, the additional time equals the original delivery period. The Purchaser may extend this calculated delivery duration up to the original delivery period while exercising the option clause. Bidders must comply with these terms.

02

Buyer Added Bid Specific ATC

View PDF · p. 5

Buyer uploaded ATC document Click here to view the file.

Similar open tenders

Soonest first

Search similar in the explorerFind this tender in the explorer

Open on GeM