SUPPLY OF DIESEL ENGINE DRIVEN FIRE WATER PUMP PACKAGE AT DHARMAPURI
- Delivery
- 120 days
Bharat Petroleum Corporation Ltd
Ministry of Petroleum and Natural Gas › Pipeline Projects Mumbai
Delivers to
Coimbatore, Tamil Nadu
Ministry of Petroleum and Natural Gas published this goods tender on GeM on 9 Oct 2026, for Coimbatore, Tamil Nadu. No EMD is required. It closes on 30 Oct 2026, 2:00 pm IST. Bid number GEM/2026/B/8138131.
2 items · 1 delivery location
641014,Bharat Petroleum Corporation Limited Irugur Devangonthi Pipeline Coimbatore Camp Office No: 74&75 , 2nd Street, Poongothai Nagar, Civil Aerodrome Post, Coimbatore - 641014, Tamilnadu
K.सं./S.N o. · Document Title · Description · 0रवस %5भार के अनुसार जीएसट/Applicable i.r.o. Items
K.सं./S.N o. · Document Title · Description · 0रवस %5भार के अनुसार जीएसट/Applicable i.r.o. Items
1 · Technical Volume View · Technical tender documents · SUPPLY OF DIESEL ENGINE DRIVEN FIRE WATER PUMP PACKAGE AT DHARMAPURI(2)
2 · Tender SOR View · Schedule wise SOR documents · SUPPLY OF ELECTRIC MOTOR DRIVEN JOCKEY PUMP PACKAGE AT DHARMAPURI(2)
No matching items. Try another name, code or schedule.
Bid files and supporting documents, linked directly from GeM.
Full bid details and conditions
Applies to item 1
Applies to item 2
Experience
3 years
Min. turnover
₹26 L
a year, 3-year average
Past performance
80%
of the bid quantity
Exemptions depend on the evidence and conditions specified in the bid.
Check each criterion against the tender notice before you bid.
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Buyer-added conditions from the bid document.
OPTION CLAUSE: The Purchaser reserves the right to increase or decrease the quantity to be ordered up to 25 percent of bid quantity at the time of placement of contract. The purchaser also reserves the right to increase the ordered quantity up to 25% of the contracted quantity during the currency of the contract at the contracted rates. The delivery period of quantity shall commence from the last date of original delivery order and in cases where option clause is exercised during the extended delivery period the additional time shall commence from the last date of extended delivery period. The additional delivery time shall be (Increased quantity ÷ Original quantity) × Original delivery period (in days), subject to minimum of 30 days. If the original delivery period is less than 30 days, the additional time equals the original delivery period. The Purchaser may extend this calculated delivery duration up to the original delivery period while exercising the option clause. Bidders must comply with these terms.