10 facts from the tender

School and Mass Education Department Odisha published this goods tender on GeM on 9 Oct 2026, for Malkangiri, Odisha. The EMD is ₹4.4 L. It closes on 28 Oct 2026, 7:00 pm IST. Bid number GEM/2026/B/8141761.

Timeline

  1. Published9 Oct 2026 · 7:05 pm

Bidding

Bid type
Bid
Evaluation method
Total value wise evaluation
Packet type
Two Packet Bid
Reverse auction
No
Total quantity
123

Buyer

Created by
Programmer21
Location
Malkangiri · Odisha
Portal
GeM

Important dates

Published
9 Oct 2026, 7:05 pm IST
Closes
28 Oct 2026, 7:00 pm IST

Items & delivery

2 items · 1 delivery location

Delivery location · all items

764048,DISTRICT PROJECT OFFICE SAMAGRA SHIKSHA, MALKANGIRI Near DISTRICT COURT, MALKANGIRI

Item 1

Off - Grid Solar Photovoltaic (PV) Power Plant (V2)

Quantity51 pieces
Delivery
60 days
Specifications & requirements · 7
Specification Name
बड के िलए आवOयक अनुमत मूWय /Bid Requirement (Allowed Values)
Capacity of power plant (kVA)
3.5
Type of Solar Module
Crystalline Silicon Terrestrial Photovoltaic (PV) modules conforming to IS 14286 IS/IEC 61730 -1 IS/IEC 61730 -2
Rated power of PV module (in Wp) - Minimum
3500
Rated Power (in kVA) (Hint: Inverter Rating)
3.5
Charger technology
MPPT
Capacity of power plant (kVA)
3 kva
Item 2

Off - Grid Solar Photovoltaic (PV) Power Plant (V2)

Quantity72 pieces
Delivery
60 days
Specifications & requirements · 8
Specification Name
बड के िलए आवOयक अनुमत मूWय /Bid Requirement (Allowed Values)
Capacity of power plant (kVA)
1
Type of Solar Module
Crystalline Silicon Terrestrial Photovoltaic (PV) modules conforming to IS 14286 IS/IEC 61730 -1 IS/IEC 61730 -2
Rated power of PV module (in Wp) - Minimum
1000
Rated Power (in kVA) (Hint: Inverter Rating)
1.0
Output phase
1 Phase, 230 volt AC, 50 Hz
Charger technology
MPPT
Protection class
IP20

Tender documents

Bid files and supporting documents, linked directly from GeM.

Policy & contract references

Documents you must submit

  • Experience Criteria
  • Past Performance
  • Bidder Turnover
  • Certificate (Requested in ATC)
  • OEM Authorization Certificate
  • OEM Annual Turnover
Show all 8
  • Additional Doc 1 (Requested in ATC)
  • Compliance of BoQ specification and supporting document

Eligibility

Experience

3 years

Min. turnover

₹1.1 Cr

a year, 3-year average

OEM turnover

₹8.8 Cr

Past performance

80%

of the bid quantity

Experience & turnover exemptions

Exemptions depend on the evidence and conditions specified in the bid.

Preferences & relaxations

  • MSE purchase preference: no
  • MII preference: no
  • EMD exemption: no
  • Inspection required: no

Check each criterion against the tender notice before you bid.

Commercial conditions

EMD
₹440,000
Performance guarantee
5% for 12 months
Offer validity
120 days

Payment terms

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

View PDF · p. 2

Buyer requirements & conditions

Buyer-added conditions from the bid document.

OPTION CLAUSE: The Purchaser reserves the right to increase or decrease the quantity to be ordered up to 25 percent of bid quantity at the time of placement of contract. The purchaser also reserves the right to increase the ordered quantity up to 25% of the contracted quantity during the currency of the contract at the contracted rates. The delivery period of quantity shall commence from the last date of original delivery order and in cases where option clause is exercised during the extended delivery period the additional time shall commence from the last date of extended delivery period. The additional delivery time shall be (Increased quantity ÷ Original quantity) × Original delivery period (in days), subject to minimum of 30 days. If the original delivery period is less than 30 days, the additional time equals the original delivery period. The Purchaser may extend this calculated delivery duration up to the original delivery period while exercising the option clause. Bidders must comply with these terms.

Manufacturer Authorization:Wherever Authorised Distributors/service providers are submitting the bid, Authorisation Form /Certificate with OEM/Original Service Provider details such as name, designation, address, e-mail Id and Phone No. required to be furnished along with the bid

03

Scope of Supply

View PDF · p. 6

Scope of supply (Bid price to include all cost components) : Supply Installation Testing Commissioning of Goods and Training of operators and providing Statutory Clearances required (if any)

  • 4.Turnover Bidder Turn Over Criteria: The minimum average annual financial turnover of the bidder during the last three years, ending on 31st March of the previous financial year, should be as indicated in the bid document. Documentary evidence in the form of certified Audited Balance Sheets of relevant periods or a certificate from the Chartered Accountant / Cost Accountant indicating the turnover details for the relevant period shall be uploaded with the bid. In case the date of constitution / incorporation of the bidder is less than 3 year old, the average turnover in respect of the completed financial years after the date of constitution shall be taken into account for this criteria.

Nominated Inspection Agency: On behalf of the Buyer organization, any one of the following Inspection Agency would be conducting inspection of stores before acceptance: Pre-dispatch Inspection at Seller Premises (applicable only if pre-dispatch inspection clause has been selected in ATC): Inspection before dispatch, if required, to ensure compliance with bid specifications. Post Receipt Inspection at consignee site before acceptance of stores: Inspection after delivery to verify quality, quantity and specifications.

  • 6.Past Project Experience Proof for Past Experience and Project Experience clause: For fulfilling the experience criteria any one of the following documents may be considered as valid proof for meeting the experience criteria:a. Contract copy along with Invoice(s) with self-certification by the bidder that service/supplies against the invoices have been executed.b. Execution certificate by client with contract value.c. Any other document in support of contract execution like Third Party Inspection release note, etc.Proof for Past Experience and Project Experience clause: For fulfilling the experience criteria any one of the following documents may be considered as valid proof for meeting the experience criteria:a. Contract copy along with Invoice(s) with self-certification by the bidder that service/supplies against the invoices have been executed.b. Execution certificate by client with contract value.c. Any other document in support of contract execution like Third Party Inspection release note, etc.
07

Forms of EMD and PBG

View PDF · p. 6

Bidders can also submit the EMD with Account Payee Demand Draft in favour of MALKANGIRI, School and Mass Education Department Odisha, Odisha Primary Education Program Authority

  • (OPEPA)Bhubaneswar payable at District Project Coordinator . Bidder has to upload scanned copy / proof of the DD along with bid and has to ensure delivery of hardcopy to the Buyer within 5 days of Bid End date / Bid Opening date.
08

Buyer Added Bid Specific ATC

View PDF · p. 7

Buyer uploaded ATC document Click here to view the file.

09

Buyer Added Bid Specific ATC

View PDF · p. 7

Buyer Added text based ATC clauses

  • 1.The department has the right to ask for a demonstration or physical inspection of the model submitted i n the tender whenever required. The bidder must complete this within the time given by the office. No tran sport or other expenses will be paid by the department. If the bidder fails to follow these instructions, the bid will be rejected at the technical stage. 2.The bidder must prepare and submit the preliminary layout and CAD design drawings. These documents must be uploaded and submitted in hard copy before the bid closing date. Bids without these documents will be rejected during technical evaluation.
  • 3.The bidder must deliver the benches to the locations given by the Department. No extra transportation c harges will be paid by the Department.
  • 4.In accordance with the above, the bidder must check the feasibility of the bench delivery and submit a c onfirmation letter to the Department, acknowledging the same. The bidder must upload the acknowledgem ent with the technical bid. .

Similar open tenders

Soonest first

Search similar in the explorerFind this tender in the explorer

Open on GeM