Browse all bids
GeMOpenServicesBid

Operation And Maintenance Of Substation - WORK AT 220 KV S/S MURADNAGAR UNDER ETD-MURADNAGAR

Uttar Pradesh Power Corporation Limited (uppcl)

Energy Department Uttar Pradesh › Electricity Civil Transmission Circle 132 Kv S/s Martinpurwa Lucknow

Delivers to

Ghaziabad, Uttar Pradesh

Overview

10 facts from the tender

Energy Department Uttar Pradesh published this services tender on GeM on 12 Oct 2026, for Ghaziabad, Uttar Pradesh. No EMD is required. It closes on 22 Oct 2026, 1:00 pm IST. Bid number GEM/2026/B/8147289.

Timeline

  1. Published12 Oct 2026 · 12:40 pm

Bidding

Bid type
Bid
Evaluation method
Total value wise evaluation
Packet type
Two Packet Bid
Reverse auction
No
Total quantity
4

Buyer

Created by
AE@mrd04
Location
Ghaziabad · Uttar Pradesh
Portal
GeM

Important dates

Published
12 Oct 2026, 12:40 pm IST
Closes
22 Oct 2026, 1:00 pm IST

Items & delivery

1 item · 1 delivery location

Item 1

Operation And Maintenance Of Substation - WORK AT 220 KV S/S MURADNAGAR UNDER ETD-MURADNAGAR

Quantity4
Delivery location

201206,220 KV SUB STATION MURADNAGAR DELHI- MEERUT ROAD MURADNAGAR UTTAR PRADESH

Wage & allowance components

Number of months for which Operations & Maintenance service is required during contract period : 1

Specifications & requirements · 6
Operation And Maintenance Service Is Required For
WORK AT 220 KV S/S MURADNAGAR UNDER ETD-MURADNAGAR
Type of Annual Maintenance Service Provider required
WORK AT 220 KV S/S MURADNAGAR UNDER ETD-MURADNAGAR
Status/condition of equipment/machine/system (At the time of bid)
Functional but outside AMC and Warranty
Cost of consumable/Material
Consumables to be provided by service provider (inclusive in contract cost)
Cost of spare parts
Spare parts to be provided by service provider (inclusive in contract cost and spare parts should be of OEM or OEM authorized/equivalent only)
Minimum Floor Price defined by Buyer
No

Tender documents

Bid files and supporting documents, linked directly from GeM.

Policy & contract references

Documents you must submit

  • Experience Criteria
  • Bidder Turnover
  • Certificate (Requested in ATC)
  • Additional Doc 1 (Requested in ATC)
  • Additional Doc 2 (Requested in ATC)
  • Additional Doc 3 (Requested in ATC)

Eligibility

Experience & turnover exemptions

Exemptions depend on the evidence and conditions specified in the bid.

Preferences & relaxations

  • EMD exemption
  • MSE purchase preference: no

Check each criterion against the tender notice before you bid.

Commercial conditions

EMD
Not required
Performance guarantee
Not required
Offer validity
180 days
Contract period
1 Month(s)

Payment terms

Payments shall be made to the Seller within 45 days of issue of service delivery acceptance certificate (SDAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

View PDF · p. 2

Buyer requirements & conditions

Buyer-added conditions from the bid document.

OPTION CLAUSE 50% : The buyer can increase or decrease the contract quantity or contract duration up to 50 percent at the time of issue of the contract. However, once the contract is issued, the contract quantity or contract duration can only be increased up to 50 percent. Bidders are bound to accept the revised quantity or duration. For lumpsum-based service contracts, the buyer may increase the scope of work and contract value up to 50 percent with the consent of the service provider

02

Certificates

View PDF · p. 4

Bidder's offer is liable to be rejected if they don't upload any of the certificates / documents sought in the Bid document, ATC and Corrigendum if any.

03

Buyer Added Bid Specific ATC

View PDF · p. 4

Buyer Added text based ATC clauses TERMS & CONDITIONS OF CONTRACT -- WORK AT 220 KV S/S MURA DNAGAR UNDER ETD-MURADNAGAR TD,MURADNAGAR ope of Work: - WORK AT 220 KV S/S MURADNAGAR UNDER ETD-MURADNAGAR T & P: - T & P required for proper execution of works shall be arranged by the contractor himself at his own cost. However, any special T & P as specified in contract and necessary for co pletion of work can be had from the Dep. On request free of charge. But non availability any such T & P shall not absolve the contractor of his responsibility to complete the work No extra payment shall be made on account of this. LABOUR: - fficient Mechanic/skilled labours shall be arranged by the contractor at his own cost. In t s connection department does not take any responsibility. However, if at any stage it is f nd the proper skilled personnel have not been deployed by the contractor for the work, h has to withdraw the unskilled labour doing the skilled job and deploy skilled personal me t for doing the job. Also, the person deployed by the contractor found including in this th act of union, indiscipline or anything objectionable, shall be removed from site if asked to o so by engineer. ELECTRICITY RULE: - construction work shall be carried out as per relevant provision of Indian Electricity rule 956 and Indian Electricity Act. 1910 or any amendment there of technical specification of e contract any other manual referred to therein shall be strictly adhered to. SAFETY & WORKMANSHIP: - safety rules shall be strictly observed by the contractor during the entire period of exec ion of work. However, in case of any major or minor accident, the contractor shall be who responsible for all consequences arising there of including payment of compensation un er “Workers” compensation Act and the department shall in no way be responsible of this & AE shall ensure that at no level the safety ruled is violated. MATERIAL: - material shall be provided by the contractor at his own cost. THEFT & LOSSES: - case of any theft and losses of material, reported by security guard/Contractor, necessar FIR shall be lodged by concerned JE with the concerning Police Station. NSURANCE: - e responsibility to maintain adequate insurance coverage at all times during period of co ract for safety of staff deployed and spares handed over for maintenance shall be that of ntractor. The contractor shall also take necessary insurance to indemnity third party risk ising out of work to be done by him at his own cost. The department shall not be respons e in any way in case of any mishappening. The contractor shall provide with copy of all i urance policies & documents to Executive Engineer. SUPERVISION: - work shall be supervision by Assistant Engineer/JE shall be over all in charge o supervisi of each & every work in the contract. JE entrusted to get the work done, shall personally sures that the execution is done exclusively as per specification of contract. In case of a y deviation, he will immediately write to contractor under intimation to Assistant Engineer ngineer in Charge. ENGINEER: - xecutive Engineer, Electy. Transmission Division Muradnagar, UPPTCL, shall be Engineer o he contract. VERIFICATION OF BILLS: - ter the work has been satisfactorily complete at the end of each month Contractor will su mit bill to concerned JE/AE for recording in MB and Verification in first week of every mont or earlier. Any delay beyond that shall have to be justified by JE&AE in the covering letter There should not be any substantial gap between the date of verification of bills in MB an ts submission in the office of EE. DISPUTE: - case of any dispute in respect of interpretation of any provision in the contract of any na re in respect of the work, the decision of the Superintending Engineer, Electy. Trans. rcle, UPPTCL, Ghaziabad shall be final & binding upon both the parties. URISDICTION OF COURT: - e contract shall be governed by the Law of Government of India for the time in force in D rict Ghaziabad in the state of U.P. and shall be under the jurisdiction of Hon’ble High Cou Allahabad. PENALTY: - e Contractor shall have to executive execute the above work within stipulated time owed, failing which a penalty@ ½% per week on remaining work subject to maximum of 0% of amount of the work shall be levied and recovered from the contractor’s bills. FINANCIAL CONDITIONS: - -PRICE: - To be quoted on rate schedule enclosed. -DAMAGE OF EQUIPMENT: - The contractor shall ensure to follow all instruction sued by concerned AS/JE. In case damage of any equipment, if it is found due to negligen of contractor’s employee/labour, same shall be recovered from contractor’s bill. STATUTORY DUTIES AND TAXES: - LOCAL TAXES AND LEVIES: - All such taxes if levied shall be born by the contra ctor & deemed to be included in rates quoted. INCOME TAX: - The contractor shall be liable and responsible for payment of such t axes if attracted under the provision of law. GST: - GST as applicable as per provision of the laws shall be paid extra by the depart ment. EARNEST MONEY & SECURITY DEPOSITE: - The contractor shall furnish security @1% of total value of the contract on start of work otherwise shall be deducted from Ist running bill. The amount of earnest money will be converted into security deposit. The security money shall be released after 6 months from the date of successful compl etion of work. The security money shall be forfeited either in whole or in part at the absolute discretio n of the engineer, if the contractor fails or neglect to observed or perform any his obliga tion under the contract. COMPLETION PERIOD: - e material shall be delivered within 30 days from the date of this order. TERMS OF PAYMENT: - 90% payment on monthly basis shall be made within one weak of submission of bills a nd 100% payment may be released on submission of CDR/FDR of 10% amount of month ly bill. Balance 10% payment or FDR/CDR of 10% amount shall be with held as performance g uarantee and shall be released after 6 months period from the date of completion of wo rk after necessary certification by JE/AE that the work has been completed satisfactorily as per specification and nothing is outstanding against the contractor against this agree ment or any other agreement of Dn. MODE OF PAYMENT: - All payment shall be made through NEFT directly to the vendars account by Headquate r Lucknow. Proper receipt of the payment must be given in the office immediately. WITHHOLDING OF PAYMENT: - e payment can be with held on account of following at the discretion of engineer. Violation of any contractual obligation on part of the contractor. Failure by the contractor to make due payment of material or labour employed by him. In sufficient progress of work. When the ground for with holding the payments are rem oved, payment shall be made without any delay. NOTICE TO CONTRACTOR: - ny notice may be given to contractor, if the Corporation thinks fit by the Registered post the address given below: 3 . Registration of ESI, EPF, WC Policy, Labour License and Electrical Safety Registration:- The Applicant must be registered in ESI & EPF respectively including Labour department egistration in UP Govt. ) *The Applicant must be registered as Class “A” contractor in Electrical Safety Departme of P or any other State Govt. or Central Govt. (which shall be verified) and shall get extende ring the tenure of Agreement. ) The Bidder must submit Character Certificate issued by District Magistrate (DM) valid o the te of Bid Submission. opies of Certificates in this respect shall be submitted along with Tender documents. ) The Applicant should also have W.C. Policy or give affidavit to take the same before Sta of the spective Work allotted to the Firm as per terms of the Contract awarded. ) Valid Registration in GST. Financial- Latest 3 financial year income tax return, PAN Card, P&L and Balance Sheet (i pplicable as per income tax act 1961) . ) After Gem contract, Contract Must also be done on E stamp paper ) Net worth of firm Bidder must provide an Affedevit ie The firm is not blacklisted by any organization of ce ral as wellas state government.

  • 4.Applicants Credibility Criteria: The Applicant who stands currently debarred by UPPTCL / Any DISCOM of UP / Govt. of U black listed by any Distribution/ Transmission/ Generation Utility/Govt. Department in In a on the schedule date of opening of tender shall not be eligible to participate in this tend . ) The Applicants should not have any pending litigation with UPPTCL with regard to any O M ork/Project or related activity. NNEXUREs against Technical PQR /s A part from terms and conditions mentioned above provision contained in General Conditions of Contract “A” of UPPTCL shall a o be applicable. owever, in case of any discrepancy provision mentioned in general terms & conditions an special conditions will prevail over of from A conditions. PART I SCHEDULE –A TENDER FORMS FOR SUPPLY /WORKS From: To, The Executive Engineer Electricity Transmission Division Muradnagar, (Ghaziabad) Sir, With reference to your invitation to tender for the above I/We hereby offer to the, Items in the schedule of pri ces and delivery annexed or such portion thereof as your determine in strict accordance with the annexed co nditions of contract form B/A, Specifications and schedules of Rates to Satisfaction of the Purchaser or in def ault thereof to forfeit and pay to the U.P. Power Transmission Corporation. Ltd. the sum of money mentioned i n the said conditions. The rates quoted are inclusive pro-rate and in full satisfaction of all claims. I/We agree to abide by tender for the period of six months from the date fixed for receiving of the sa me. A sum Rs..................................in the form of ................................. is herewith forwarded duly endorsed in favor to the..........................................................................................U.P. Power Trans. Corp. Ltd. as earnest money. I/We hereby undertake and agree to execute a contract in accordance with the conditions of the contract. Encl: As above. Date ............…………. date of............................................. (Month) 20...............................year. Witness :- Yours faithfully Address (Signature of the tenderer i n full) Name............................................. Seal of company PART I SCHEDULE B PRE-QUALIFICATION REQUIREMENT OF THE TENDERER
  • (A)Bidder shall have registered in GST/PAN Card copy & also activated GST for this work.
  • (B)Bidder has to submit current 3 years ITR Copy
  • (C)Bidder must have experience of Same/Similar type of work.
  • (D)Bidder’s work completion Certificate/Agreement/Material supply completion certificate must be uploaded by the Firm.
  • (E)Material will be supplied within 60 days from date order.
  • (F)Bidder shall have solvency certificate./ Liquid asset certificate. NOTE: Bidder shall have to submit the documentary evidences in support of above pre-qualifying Requirement. Additional security/Performance Guarantee:- As per BO No-353/CS-Transco/Baithak(53)2017/ dated 11-7-2017 and GO No-622/23-12-2012-2 Audit/08,TC- 2 dated 08-6-2012 contractor has to deposit additional security/ performance guarantee in the shape of FD R, If the tendered rates are found below the estimated amount as below:-
  • A.0.5% of Estimated value for each 1% upto below the rates.
  • B.1% of estimated value for each 1% beyond 10% below the rates. DISCLAIMER Even though the bidders may meet the above qualifying criteria, they may be disqualified if they Have Made misleading or false representation in the forms, statements, and attachments as proof of the Qualifying requirements, and/or A record of poor performance such as non-completion/inordinate delays in completing the earlier contract(s) awarded by UPPTCL, litigation history, etc. Nigam does not bind itself to accept the lowest or any of the bids and reserves the right to accept any bid or reject any or all bids without assigning any reasons thereof. (Signature of the tenderer in full) Name............................................. Designation………………………………… Seal of company PART I SCHEDULE- C DECLARATION Tender Invited by -------------------------------------------------- -------------------------------------------------- Tender For -------------------------------------------------- Name of Tenderer -------------------------------------------------- -------------------------------------------------- Specification No.& Date of Opening -------------------------------------------------- -------------------------------------------------- In consideration of the U.P. Power Corporation. Ltd. having treated the tenderer to be an eligible personwhol etender may be considered, the tenderer hereby agrees to the condition that the proposal inresponse to the above invitation shall not be withdrawn within three months (or any extensionthereof) from the date of openi ng of the tender, also to the condition that if thereafter the tendererdoes withdraw his proposal within the sai d period, the Earnest money deposited by him may beforfeited to the U.P. Power Transmission Corporation Lt
  • d.And at the discretion of the Purchaser, the purchaser may be debar the tenderer from tendering for minim um period of one year reckoned from thedate of opening of the tender. Signed this ….............… (date) day of................................(month)20.......year. Place …………………………. signed by ……………………………………. Witness :- Tenderer Signature Name............................................. Designation………………………………… Seal of company SCHEDULE D SCHEDULE OF GENERAL PARTICULARS 1 Name of tenderer Registered office Postal Address of tender Telegraphic address 2 Name and address of manufacture, if any 3 Location and address of works 4 Name and address of Local representative and his telephone number, if any. 5 Name and address of the officer of the ten derer/manufacture to whom all reference s hall be made for expenditure co-ordination . 6 Place from where service facility are availa ble (Give full address) 7 Whether the tenderer is sole Proprietor/Par tnership concern/Pvt. Ltd. Co./Public undert aking. 8 Named of foreign collaborator, if any 9 Whether the designs are their own or obtai ned from other sources. If from other sourc es, the same may be indicated. 10 Name and address of sub-supplier 11 The name, designation, qualification and e xperience of the engineer employed by the tenderer in design, development and man ufacturing of the quoted material. 12 Authorised capital of the company. 13 Annual Turnover is Rs……………… per year 14 Actual production per year of the material quoted. 15 Manufacturing capacity per month of the q uoted material. 16 State the name and designation of your rel ative (s) If any working in corporation. 17 Earnest month
  • (i)Earnest money deposit or not
  • (ii)If yes, state amount of earnest money d eposited.
  • (iii)No. & date of Bank Guarantee/Bank Dr aft (for earnest money) 18 Validity of offer (A minimum validity of thre e month from the date of tender opening is required) 19 1% security deposit in terms of clause 3 of From ‘B’ is not deposited within 15 of plac ement of order. Whether or not willing to d eposit. If no, state reasons. Yes/No 20 Whether agreeable to furnish 10% perform ance bank guarantee or not, state reason. Yes/No 21 Whether the offered material is type tested or not. Tested/Not tested 22 Whether type test certificate of offer mater ial are enclosed or not. Enclosed/not enclosed 23 Whether Certification for satisfactory perfo rmance of offered material enclosed or not. Enclosed/not enclosed 24 Whether Ex-works prices quoted. Yes/No 25 Whether Freight charges have been quote separately. Yes/No 26 Whether the quoted prices are also wareh ouse th warehouse and 45 days storage th ereafter quoted separately. Yes/No 27 Whether the quoted prices are also applica ble for any reduced order. Yes/No 28 Terms of payment as mentioned in relevan t clause are acceptable or not Yes/No State trade/Stales tax Number Yes/No 29
  • (i)Central Yes/No
  • (ii)State Yes/No 30 Income tax clearance certificate Enclosed o r not, Yes/No 31 Whether the tenderer is agreeable to suppl y the material, in case the deviation stipul ated by him are not acceptable to the corp oration. Yes/No 32 Have your noted that material dispatch will be by Road Transport only. Yes/No 33 Testing facilities.
  • (a)Type tests. Available/not available
  • (b)Routine tests. Available/not available 34
  • (a)Manufacturing experience of quoted mat erial. Enclosed/not enclosed
  • (b)Evidence of statement 34(a) Enclosed/not enclosed 35 Material quoted in service since. Given the year with evidence/Not given 36 Tax and Duties Applicable extra/Not applicable 37 Excise Duties Applicable extra/Not applicable 38 Desired delivery (Annex-I) Applicable extra/Not applicable 39 Drawings (Schedule F) Enclosed/not enclosed 40 Whether the prices quoted are after taking motivate benefit. Yes/No 41 Receipt No. NOTE:- Quantity may vary as per site condition/requirement but Price variation shall not be allowed in any c ondition. Tenderer Full Signature Name Designation Date Seal of Company. PART I SCHEDULE E DEVIATIONS FROM ‘INSTRUCTIONS TO TENDERERS’& ITS PRICE INCIDENCE (All deviations from the Instructions to Tenders’ shall be filled in clause, in this schedule, compliance with the Specifications will be taken as granted if the deviation are not specifically mentioned in this schedule. In case the tenderer is required to agree to the standard clause, then he may indicate the amount by which the tendered price will thereby the increased or decreased.) Sl. No.…………………… Clause No………………………………Deviation……………….……Price incidence (Increase/ Decrease) The tenderer hereby certified that the above mentioned are the only deviations from the ‘Instructions to tenderer’ Tenderer (Signature of the tenderer in full) Name............................................. Designation………………………………… Date………………………………………….. Seal of company PART I SCHEDULE F DEVIATIONS FROM ‘GENERAL REQUIREMENT’ OF SPECIFICATION & ITS PRICE INCIDENCE (All deviations from the ‘General requirement of specification’ shall be filled in clause, in this schedule; comp liance with the Specifications will be taken as granted if thedeviation are not specifically mentioned in this sc hedule. In case the tenderer is required to agree tothe standard clause, then he may indicate the amount by which the tendered price will thereby the (increased or decreased.) Sl. No. ………………………… Clause No………………………………………Deviation…… price incidence (Increase/D ecrease) The tenderer hereby certified that the above mentioned are the only deviations from the ‘General requirement of specification’ Tenderer (Signature of the tenderer in full) Name............................................. Designation………………………………… Date………………………………………….. Seal of company SCHEDULE ‘G' DEVIATIONS FROM ‘GENERAL CONDITIONS OF CONTACT FORM “B” ITS PRICE INCIDENCE (All deviations from the ‘General Condition of contract form shall be filled in clause, in this schedule, complia nce with the Specifications will be taken as granted if the deviation are not specifically mentioned in this sch edule. In case the tenderer is required to agree to the standard clause, then he may indicate the amount by which the tendered price will thereby the (increased or decreased.) Sl. No. ………………………… Clause No………………………………………Deviation…… price incidence (Increase/D ecrease) The tenderer hereby certified that the above mentioned are the only deviations from the ‘General condition ofcontract form A/B” Tenderer (Signature of the tenderer in full) Name............................................. Date………………………………………….. Seal of company SCHEDULE ‘H' DEVIATIONS FROM ‘SPECIALCONDITIONS OF SPECIFICATIONS AND ITS PRICE INCIDENCE Sl. No. ………………………… Clause No………………………………………Deviation…… price incidence (Increase/D ecrease) Tenderer (Signature of the tenderer in full) Name............................................. Date………………………………………….. Seal of company Details for Earnest Money Transaction (To be Submitted with Part-I) Sl. No. Particular Description (To be filled by Tendere
  • r)1 Tender Name 2 Tenderer Name 3 Date of Transaction 4 UTR Number 5 Amount in Figure 6 Amount (in Words) 7 Details of Account from which transaction done
  • (i)Account Name
  • (ii)Account Number 8 Issuing Bank 9 Issuing Branch 10 Issuing Branch IFSC Code Tenderer (Signature of the tenderer in full) Name............................................. Date………………………………………….. Seal of company Details for Tender Cost Transaction (To be Submitted with Part-I) (To be Submitted with Part-I) Sl. No. Particular Description (To be filled by Tendere
  • r)1 Tender Name 2 Tenderer Name 3 Date of Transaction 4 UTR Number 5 Amount in Figure 6 Amount (in Words) 7 Details of Account from which transaction done
  • (i)Account Name
  • (ii)Account Number 8 Issuing Bank 9 Issuing Branch 10 Issuing Branch IFSC Code Tenderer (Signature of the tenderer in full) Name............................................. Date………………………………………….. Seal of company EXECUTIVE ENGINEER ELECTRICITY TRANSMISSION DIVISION 220 KV S/S DELHI MEERUT ROAD, MURADNAGAR Mob No. 7253888445 e-mail-eeetdmrd@upp .org NOTICE INVITING E-TENDER E-tender in two parts (covers), part-I (cover-1) and Part-II (cover-2) are invited for works as per details given in followin g table. Cover-I of bid shall contain earnest money & Tender Cost in original Cover-2 shall contain price. Sl. No. Item/work Tender Re ference. N
  • o.EMD (Rs.) Scheduled date & time of submis sion of bids Scheduled date and time of ope ning of Par t-I Cost of tender doc uments with GST
  • (Rs)1 WORK AT 220 KV S/S MURAD NAGAR UNDER ETD-MURADNA GAR T-/ 27 ET D/M/ FY / 202 6-27 2000/- (Rs. Two t housand hundr ed only) Upto 22/10/2026 by 13:00 hrs . 23/10/2026 at 13:30 hrs. 590- (Rs. Five hund red Ninety only) The tender Part-I (Commercial) & Part-2 (Financial) can only be submitted by the bidder via online uploading of Documents in the PDF format only ough procurement website www.etender.up.nic.in.
  • 1.Cost of Tender Fee against Tender document shall be credited directly to Current Account of U.P Power Transmission Corporation Lt
  • d.Muradnagar, “Executive Engineer, Electricity Transmission Division 220 KV S/S Delhi Meerut Road, Muradnagar through “NEFT”/ RTGS “Transactions.” Details of Transactions may also be send via e-mail (eeetdmrd@upptcl.org) Tender Fee and EMD shall be depos ited tender wise separately i.e. there shall be clubbing of Tender Fee and EMD with that of other tender. 2.
  • 2.Earnest Money is to be deposited directly to the Current Account of U.P Power Transmission Corporation Ltd. Muradnagar. Executive Engineer, Electricity Transmission Division 220 KV S/S Delhi Meerut Road, Muradnagar through “ NEFT”/RTGS“ Transactions. 3.The bid of firms, without abovementioned digital transaction against the purchase of Tender Documents and Earnest Money EMD shall be reje cted out right.
  • 4.The full Account Details of Executive Engineer, Electricity Transmission Division 220 KV S/S Delhi Meerut Road, Muradnagar is given as below
  • (A)Account Holder Name : U.P Power Transmission Corporation Ltd. Muradnagar, “Executive Engineer, Electricity Transmission Division Muradnagar EXPENDITURE ACCOUNT.
  • (B)Account Number : 191805500133
  • (C)Bank Name : ICICI Bank, Muradnagar.
  • (D)Branch Detail : ICICI Bank Ltd, Muradnagar, (Ghaziabad) U.P -201206 IFSC Code : RTGS/NEFT IFSC CODE: ICIC0001918
  • 5.The receipt of such digital transactions against “ Tender Fee Cost” and “Earnest Money” in form of UTR No. must be signed by the author signatory of Bank Issuer representative & also duly signed by the bidder along with their bank information’s comprising of account number and a unt holder name etc.
  • 6.The receipt of digital transaction against “ Tender cost in form of UTR No. Transaction No. duly signed by bidder shall also be intimated by o -mail (eeetdmrd@upptcl.org) before bid submission end date and time.
  • 7.Such digital transactions receipts as described in at Sl. No. 5, together with prequalification details technical and commercial terms and cond s and photocopies of PAN of Proprietor/Firm GST registration declaration .
  • 8.Financial bid containing price only shall have to be upload as cover-2 of Tender Part-2 in the Pdf/Excel format.
  • 9.After evaluation of Part-I of Tender the date and time for opening of Part-2 will be uploaded at the website: www.etender.up.nic.in
  • 10.No documents (Part-I & Part-2) of any of the firm’s shall be accepted in hard-copies (i.e other then online uploaded in digitally Pdf /Excel for ) through any means either by post of personal by this office.
  • 11.Please visit website www.etender.up.nic.in for any other corrections/amendments/modifications extensions till the date of submission of Tende nd thereafter.
  • 12.Executive Engineer, Electy. Transmission Division Muradnagar reserves the right to accept or reject any offer without assigning any reason
  • 13.Dispute if any, shall be under jurisdiction of Ghaziabad District Court in the State of U.P. “Save Electricity in the interest of the Nation” EXECUTIVE E NGINEER SCOPE OF WORK Sl. N. Name of Work Qty. 1 Overhauling of mechanism assembly of 145 KV SF6 Gas Circuit Breaker inst alled at following 132 KV Bay at 220 KV S/S Muradnagar under ETD, Murad nagar. Work includes overhauling of control valve assembly by replacement of control valve seat. O-ring, P-80 and roller C/D. Overhauling of holding latc
  • h.Opening of pneumatic cylinder closing spring etc DE rusting and greasing of the same rectification of air leakage through NRV, safety valve, opening o f reservoir, cleaning of reservoir along with replacement of 0-6mm and 12m m gas pipe assembly checking and adjustment of air pressure switches and gas pressure switches. Checking and retightening of electrical connections. Measurement of closing/tripping time of circuit breaker. Measurement of co ntact resistance of circuit breaker with digital meter. Work shall include su bmission of analysis of closing tripping time & contact resistance measured for each CB along with any further necessary recommendation for healthy f uture life of CBs. CB No. 70, 132KV Transfer Bus coupler bay breaker CB no. 75, 132KV Bus c oupler bay breaker 02 Nos
  • 2.Providing and Fixing of 33 KV Drive insulator suitable for 33 KV CGL/Shreen make VCB at 220KV S/S Muradnagar. 02Nos .
04

Buyer Added Bid Specific ATC

View PDF · p. 28

Buyer uploaded ATC document Click here to view the file.

  • 5.Buyer Added Bid Specific Scope Of Work(SOW) Text Clause(s) Sl. N. Name of Work Qty. 1 Overhauling of mechanism assembly of 145 KV SF6 Gas Circuit Breaker inst alled at following 132 KV Bay at 220 KV S/S Muradnagar under ETD, Murad nagar. Work includes overhauling of control valve assembly by replacement of control valve seat. O-ring, P-80 and roller C/D. Overhauling of holding latc
  • h.Opening of pneumatic cylinder closing spring etc DE rusting and greasing of the same rectification of air leakage through NRV, safety valve, opening o f reservoir, cleaning of reservoir along with replacement of 0-6mm and 12m m gas pipe assembly checking and adjustment of air pressure switches and gas pressure switches. Checking and retightening of electrical connections. Measurement of closing/tripping time of circuit breaker. Measurement of co ntact resistance of circuit breaker with digital meter. Work shall include su bmission of analysis of closing tripping time & contact resistance measured for each CB along with any further necessary recommendation for healthy f uture life of CBs. CB No. 70, 132KV Transfer Bus coupler bay breaker CB no. 75, 132KV Bus c oupler bay breaker 02 Nos
  • 2.Providing and Fixing of 33 KV Drive insulator suitable for 33 KV CGL/Shreen make VCB at 220KV S/S Muradnagar. 02Nos
  • 6.Buyer Added Bid Specific Scope Of Work(SOW) File Attachment Click here to view the file.

Similar open tenders

Soonest first

Search similar in the explorerFind this tender in the explorer

Open on GeM