Browse all bids
GeMOpenGoodsBidBOQ

As per BOQ

Indian Army

Ministry of Defence › Department of Military Affairs

Delivers to

Allahabad, Uttar Pradesh

Overview

10 facts from the tender

Ministry of Defence published this goods tender on GeM on 15 Oct 2026, for Allahabad, Uttar Pradesh. The estimated value is ₹28.2 L and the EMD is ₹1.4 L. It closes on 26 Oct 2026, 3:00 pm IST. Bid number GEM/2026/B/8148280.

Timeline

  1. Published15 Oct 2026 · 2:36 pm
  2. Reverse auctionIf the bid qualifies, after evaluation

Bidding

Bid type
Bid
Evaluation method
Total value wise evaluation
Packet type
Two Packet Bid
Reverse auction
Yes, H1-Highest Priced Bid Elimination
Total quantity
5,534

Buyer

Created by
headclk@gem
Location
Allahabad · Uttar Pradesh
Portal
GeM

Important dates

Published
15 Oct 2026, 2:36 pm IST
Closes
26 Oct 2026, 3:00 pm IST

Items & delivery

27 items · Address masked by GeM

Delivery location · all items

***********Allahabad

GeM masks the full address in this document.
Showing 27 of 27
014 MP Outdoor IP Varifocal Bullet CameraQuantity16Delivery120 daysDetailsClose
Delivery
120 days
024 MP Outdoor IP Varifocal Bullet Camera With AutoQuantity12Delivery121 daysDetailsClose
Delivery
121 days
034 MP Indoor IP Dome CameraQuantity5Delivery122 daysDetailsClose
Delivery
122 days
0464 Channel Network Video Recorder NVR 4K 8 SataQuantity1Delivery123 daysDetailsClose
Delivery
123 days
05Surveillance Hard Drive 8TBQuantity4Delivery124 daysDetailsClose
Delivery
124 days
0624 Port Gigabit PoE SwitchQuantity1Delivery125 daysDetailsClose
Delivery
125 days
078 Port Gigabit PoE SwitchQuantity2Delivery126 daysDetailsClose
Delivery
126 days
0824 Port Gigabit Switch With SFP PortQuantity1Delivery127 daysDetailsClose
Delivery
127 days
09Single Mode OFC 24 Core Armoured CableQuantity1,500Delivery128 daysDetailsClose
Delivery
128 days
10OFC Joint Closure KitQuantity20Delivery129 daysDetailsClose
Delivery
129 days
11LIU Fiber Termination Box 24 PortQuantity1Delivery130 daysDetailsClose
Delivery
130 days
12SFP Module 1G Single ModeQuantity26Delivery131 daysDetailsClose
Delivery
131 days
13Fiber Patch Cord SC-SC Single ModeQuantity26Delivery132 daysDetailsClose
Delivery
132 days
14Media Convertor With SFP PortQuantity13Delivery133 daysDetailsClose
Delivery
133 days
154 U Outdoor Waterproof RackQuantity12Delivery134 daysDetailsClose
Delivery
134 days
16Cat6 Outdoor CableQuantity1,220Delivery135 daysDetailsClose
Delivery
135 days
17Power CableQuantity1,400Delivery136 daysDetailsClose
Delivery
136 days
18SMPS 12V Power SupplyQuantity12Delivery137 daysDetailsClose
Delivery
137 days
19LED TV 75 InchQuantity1Delivery138 daysDetailsClose
Delivery
138 days
20HDPE Pipe HI Pipe For OFC ProtectionQuantity1,200Delivery139 daysDetailsClose
Delivery
139 days
21Camera Pole Mount BracketQuantity20Delivery140 daysDetailsClose
Delivery
140 days
22Gi Pole 6 Mtr With Foundation WorkQuantity5Delivery141 daysDetailsClose
Delivery
141 days
23Junction Box Weather ProofQuantity32Delivery142 daysDetailsClose
Delivery
142 days
24Installation Testing CommissioningQuantity1Delivery143 daysDetailsClose
Delivery
143 days
25Civil Work Trenching Backfilling OFC LayingQuantity1Delivery144 daysDetailsClose
Delivery
144 days
26AMC For 2nd YearQuantity1Delivery145 daysDetailsClose
Delivery
145 days
27AMC For 3rd YearQuantity1Delivery146 daysDetailsClose
Delivery
146 days

Tender documents

Bid files and supporting documents, linked directly from GeM.

Policy & contract references

Documents you must submit

  • Experience Criteria
  • Past Performance
  • Bidder Turnover
  • Certificate (Requested in ATC)
  • OEM Authorization Certificate
  • OEM Annual Turnover
Show all 11
  • Additional Doc 1 (Requested in ATC)
  • Additional Doc 2 (Requested in ATC)
  • Additional Doc 3 (Requested in ATC)
  • Additional Doc 4 (Requested in ATC)
  • Compliance of BoQ specification and supporting document

Eligibility

Experience

3 years

Min. turnover

₹6 L

a year, 3-year average

OEM turnover

₹6 L

Past performance

50%

of the bid quantity

Experience & turnover exemptions

Micro & small enterprises (MSE)

Complete exemption
Exemption conditions

Yes | Complete

View PDF · p. 5

Exemptions depend on the evidence and conditions specified in the bid.

Preferences & relaxations

  • MSE purchase preference
  • EMD exemption: no
  • Inspection required: no

Check each criterion against the tender notice before you bid.

Commercial conditions

EMD
₹141,000
Performance guarantee
5% for 12 months
Offer validity
180 days

Buyer requirements & conditions

Buyer-added conditions from the bid document.

OPTION CLAUSE: The Purchaser reserves the right to increase or decrease the quantity to be ordered up to 25 percent of bid quantity at the time of placement of contract. The purchaser also reserves the right to increase the ordered quantity up to 25% of the contracted quantity during the currency of the contract at the contracted rates. The delivery period of quantity shall commence from the last date of original delivery order and in cases where option clause is exercised during the extended delivery period the additional time shall commence from the last date of extended delivery period. The additional delivery time shall be (Increased quantity ÷ Original quantity) × Original delivery period (in days), subject to minimum of 30 days. If the original delivery period is less than 30 days, the additional time equals the original delivery period. The Purchaser may extend this calculated delivery duration up to the original delivery period while exercising the option clause. Bidders must comply with these terms.

02

Scope of Supply

View PDF · p. 22

Scope of supply (Bid price to include all cost components) : Supply Installation Testing and Commissioning of Goods

IMPORTED PRODUCTS: In case of imported products, OEM or Authorized Seller of OEM should have a registered office in India to provide after sales service support in India. The certificate to this effect should be submitted.

04

Service & Support

View PDF · p. 23

Availability of Service Centres: Bidder/OEM must have a Functional Service Centre in the State of each Consignee's Location in case of carry-in warranty. (Not applicable in case of goods having on-site warranty). If service center is not already there at the time of bidding, successful bidder / OEM shall have to establish one within 30 days of award of contract. Payment shall be released only after submission of documentary evidence of having Functional Service Centre.

05

Service & Support

View PDF · p. 23

Dedicated /toll Free Telephone No. for Service Support : BIDDER/OEM must have Dedicated/toll Free Telephone No. for Service Support.

06

Service & Support

View PDF · p. 23

Escalation Matrix For Service Support : Bidder/OEM must provide Escalation Matrix of Telephone Numbers for Service Support.

07

Certificates

View PDF · p. 23

Bidder's offer is liable to be rejected if they don't upload any of the certificates / documents sought in the Bid document, ATC and Corrigendum if any.

08

Certificates

View PDF · p. 23

ISO 9001: The bidder or the OEM of the offered products must have ISO 9001 certification.

09

Certificates

View PDF · p. 23

The bidder is required to upload, along with the bid, all relevant certificates such as BIS licence, type test certificate, approval certificates and other certificates as prescribed in the Product Specification given in the bid document.

Bidder / OEM has to give an undertaking that after expiry of warranty period, it will provide AMC Service for next 2 years for the offered products at the rate not more than 10 % of contract price per annum. Buyer reserves the right to enter into an AMC agreement ( covering preventive maintenance and servicing)with the Successful Bidder / OEM after expiry of the Warranty period at rate as mentioned above and the payment for the AMC charges would be made Annually after rendering of the AMC Services of the relevant AMC period. Performance Security of the successful bidder shall be forfeited if it fails to accept the AMC contract when called upon by the buyer. The original Performance Security of contract will be returned only after submission and verification of AMC Performance Security for 2% of total AMC value valid up to AMC period plus 2 months (if there is no other claim). (Undertaking of acceptance to be uploaded with bid).

  • 11.Past Project Experience Proof for Past Experience and Project Experience clause: For fulfilling the experience criteria any one of the following documents may be considered as valid proof for meeting the experience criteria:a. Contract copy along with Invoice(s) with self-certification by the bidder that service/supplies against the invoices have been executed.b. Execution certificate by client with contract value.c. Any other document in support of contract execution like Third Party Inspection release note, etc.Proof for Past Experience and Project Experience clause: For fulfilling the experience criteria any one of the following documents may be considered as valid proof for meeting the experience criteria:a. Contract copy along with Invoice(s) with self-certification by the bidder that service/supplies against the invoices have been executed.b. Execution certificate by client with contract value.c. Any other document in support of contract execution like Third Party Inspection release note, etc.
  • 12.Past Project Experience The Bidder / OEM {themselves or through reseller(s)}, should have executed project for supply and installation / commissioning of same or similar Category Products during preceding 3 financial years (i.e. current year and three previous financial years) as on opening of bid, as per following criteria:
  • (i)Single order of at least 35% of estimated bid value; or
  • (ii)Two orders of at least 20% each of estimated bid value; or
  • (iii)Three orders of at least 15% each of estimated bid value. Satisfactory Performance certificate issued by respective Buyer Organization for the above Orders should be uploaded with bid. In case of bunch bids, the Category related to primary product having highest bid value should meet this criterion
13

Financial Criteria

View PDF · p. 24

NET WORTH: Net Worth of the OEM should be positive as per the last audited financial statement.

14

Buyer Added Bid Specific ATC

View PDF · p. 24

Buyer Added text based ATC clauses 2 Year AMC includes after 1yr expiring warranty. A site visit is mandatory for all bidders. Bidders who fail to conduct the site survey will have their bids sum marily rejected. The duly signed site visit report must be uploaded at the time of bid submission. .

15

Buyer Added Bid Specific ATC

View PDF · p. 24

Buyer uploaded ATC document Click here to view the file.

Similar open tenders

Soonest first

Search similar in the explorerFind this tender in the explorer

Open on GeM