10 facts from the tender

Ministry of Defence published this goods tender on GeM on 12 Oct 2026, for Mumbai, Maharashtra. The EMD is ₹87,000. It closes on 2 Nov 2026, 7:00 pm IST. Bid number GEM/2026/B/8150630.

Timeline

  1. Published12 Oct 2026 · 7:00 pm
  2. Reverse auctionIf the bid qualifies, after evaluation

Bidding

Bid type
Bid
Evaluation method
Total value wise evaluation
Packet type
Two Packet Bid
Reverse auction
Yes, H1-Highest Priced Bid Elimination
Total quantity
1

Buyer

Created by
hamlalogo
Location
Mumbai · Maharashtra
Portal
GeM

Important dates

Published
12 Oct 2026, 7:00 pm IST
Closes
2 Nov 2026, 7:00 pm IST

Items & delivery

1 item · Address masked by GeM

Item 1

REFURBISHMENT AND UPGRADATION OF 02 NOS INSTRUCTOR ROOM

Quantity1 set
Delivery location

***********Mumbai

GeM masks the full address in this document.
Delivery
90 days
Specifications & requirements

K.सं./S.N o. · Document Title · Description · 0रवस %5भार के अनुसार जीएसट/Applicable i.r.o. Items

1 · Scope of Work View · Scope of Work · REFURBISHMENT AND UPGRADATION OF 02 NOS INSTRUCTOR ROOM(1)

2 · Design View · Design · REFURBISHMENT AND UPGRADATION OF 02 NOS INSTRUCTOR ROOM(1)

Tender documents

Documents you must submit

  • Experience Criteria
  • Past Performance
  • Bidder Turnover
  • Certificate (Requested in ATC)

Eligibility

Experience

3 years

Min. turnover

₹8 L

a year, 3-year average

Past performance

30%

of the bid quantity

Experience & turnover exemptions

Micro & small enterprises (MSE)

Complete exemption
Exemption conditions

Yes | Complete

View PDF · p. 1

Exemptions depend on the evidence and conditions specified in the bid.

Preferences & relaxations

  • MSE purchase preference
  • MII preference
  • Class-1/2 local suppliers
  • EMD exemption: no
  • Inspection required: no

Check each criterion against the tender notice before you bid.

Commercial conditions

EMD
₹87,000
Performance guarantee
5% for 5 months
Offer validity
180 days

Buyer requirements & conditions

Buyer-added conditions from the bid document.

OPTION CLAUSE: The Purchaser reserves the right to increase or decrease the quantity to be ordered up to 25 percent of bid quantity at the time of placement of contract. The purchaser also reserves the right to increase the ordered quantity up to 25% of the contracted quantity during the currency of the contract at the contracted rates. The delivery period of quantity shall commence from the last date of original delivery order and in cases where option clause is exercised during the extended delivery period the additional time shall commence from the last date of extended delivery period. The additional delivery time shall be (Increased quantity ÷ Original quantity) × Original delivery period (in days), subject to minimum of 30 days. If the original delivery period is less than 30 days, the additional time equals the original delivery period. The Purchaser may extend this calculated delivery duration up to the original delivery period while exercising the option clause. Bidders must comply with these terms.

After award of contract – Successful Bidder shall have to get Detailed Design Drawings approved from buyer before starting fabrication. Successful Bidder shall submit Detailed Design Drawings for Buyer's approval, within 5 days of award of contract. Buyer shall, either approve the drawings or will provide complete list of modification required in the drawings within 7 days. Seller shall be required to ensure supply as per approved Drawings with modifications as communicated by Buyer. If there is delay from buyer side in approval of drawing– the delivery period shall be refixed without LD for the period of delay in approval of Drawing.

Actual delivery (and Installation & Commissioning (if covered in scope of supply)) is to be done at following address INS HAMLA MARVE ROAD MALAD WEST MUMBAI MH 400095 .

Bidder financial standing: The bidder should not be under liquidation, court receivership or similar proceedings, should not be bankrupt. Bidder to upload undertaking to this effect with bid.

Bidders are advised to check applicable GST on their own before quoting. Buyer will not take any responsibility in this regards. GST reimbursement will be as per actuals or as per applicable rates (whichever is lower), subject to the maximum of quoted GST %.

Experience Criteria: The Bidder or its OEM {themselves or through reseller(s)} should have regularly, manufactured and supplied same or similar Category Products to any Central / State Govt Organization / PSU for 3 years before the bid opening date. Copies of relevant contracts to be submitted along with bid in support of having supplied some quantity during each of the year. In case of bunch bids, the primary product having highest value should meet this criterion.

OPTIONAL SITE VISIT:

  • 1.The Bidder is advised to visit and examine the installation site and its surroundings and obtain for itself on its own responsibility all information that may be necessary for preparing the Bid. The costs of visiting the site shall be borne by the Bidder. NA
  • 2.The Bidder representative shall be allowed entry upon consignee premises for such visits, only upon the express conditions that the Bidder will release and indemnify the Buyer and Consignee against all liabilities arising out of such visit including death or injury, loss or damage to property, and any other loss, damage, costs, and expenses incurred as a result of such visit.
  • 3.The Bidder shall not be entitled to hold any claim against Buyer for noncompliance due to lack of any kind of pre-requisite information as it is the sole responsibility of the Bidder to obtain all the necessary information with regard to site, surrounding, working conditions, weather etc. on its own before submission of the bid.
  • 1.The Seller shall not assign the Contract in whole or part without obtaining the prior written consent of buyer.
  • 2.The Seller shall not sub-contract the Contract in whole or part to any entity without obtaining the prior written consent of buyer.
  • 3.The Seller shall, notwithstanding the consent and assignment/sub-contract, remain jointly and severally liable and responsible to buyer together with the assignee/ sub-contractor, for and in respect of the due performance of the Contract and the Sellers obligations there under.
09

Forms of EMD and PBG

View PDF · p. 7

Bidders can also submit the EMD with Fixed Deposit Receipt made out or pledged in the name of A/C THE COMMANDING OFFICER, INS HAMLA . The bank should certify on it that the deposit can be withdrawn only on the demand or with the sanction of the pledgee. For release of EMD, the FDR will be released in the favour of the bidder by the Buyer after making endorsement on the back of the FDR duly signed and stamped along with covering letter. Bidder has to upload scanned copy/ proof of the FDR along with bid and has to ensure delivery of hardcopy to the Buyer within 5 days of Bid End date/ Bid Opening date

10

Certificates

View PDF · p. 8

Bidder's offer is liable to be rejected if they don't upload any of the certificates / documents sought in the Bid document, ATC and Corrigendum if any.

11

Buyer Added Bid Specific ATC

View PDF · p. 8

Buyer uploaded ATC document Click here to view the file.

12

Service & Support

View PDF · p. 8

Availability of Service Centres: Bidder/OEM must have a Functional Service Centre in the State of each Consignee's Location in case of carry-in warranty. (Not applicable in case of goods having on-site warranty). If service center is not already there at the time of bidding, successful bidder / OEM shall have to establish one within 30 days of award of contract. Payment shall be released only after submission of documentary evidence of having Functional Service Centre.

13

Service & Support

View PDF · p. 8

Escalation Matrix For Service Support : Bidder/OEM must provide Escalation Matrix of Telephone Numbers for Service Support.

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

  • a.Copy of PAN Card.
  • b.Copy of GSTIN.
  • c.Copy of Cancelled Cheque.
  • d.Copy of EFT Mandate duly certified by Bank.

Similar open tenders

Soonest first

Search similar in the explorerFind this tender in the explorer

Open on GeM