Solar Power Plant (Roof Top) For ONGRID System, Single Phase
416602,At Post Nandgoan Tal Kankavali
- Delivery
- 45 days
Specifications & requirements · 14
- Specification Name
- बड के िलए आवNयक अनुमत मूTय /Bid Requirement (Allowed Values)
- A Grid Tied Photo Voltaic (SPV) power plant consists of
- SPV array, Module Mounting Structure, Power Conditioning Unit (PCU) consisting of Maximum Power Point Tracker (MPPT), Inverter, and Controls and Protections, interconnect cables and switches
- PV Array Mounting
- Mounted on a suitable structure
- Grid Tied SPV System
- Without battery and designed with necessary features to supplement the grid power during day time.
- Rated output power of inverter (in KW)
- 2
- Specification Name
- बड के िलए आवNयक अनुमत मूTय /Bid Requirement (Allowed Values)
- Switching device
- IGBT
- Number of Phase
- 1
- Number of MPPT per
- 1
- Number of string at input side of inverter ( input port +ve and -ve) ( hint: 1 sets contains 1 +ve and 1 -ve port)
- 2 set
- Service condition
- Outdoor
- Ingress protection rating of inverter
- IP 65 (for outdoor use)
- Overall Efficiency (in %)
- >90
- Type of display
- LED