Provision of Super Structure Items and Other Construction and Tools Items for FSB
Indian Army
Ministry of Defence › Department of Military Affairs
Delivers to
Dimapur, Nagaland
Overview
10 facts from the tenderMinistry of Defence published this goods tender on GeM on 15 Oct 2026, for Dimapur, Nagaland. The EMD is ₹2.9 L. It closes on 26 Oct 2026, 1:00 pm IST. Bid number GEM/2026/B/8163487.
Timeline
- Published15 Oct 2026 · 12:38 pm
- Closesin 10d 17h26 Oct 2026 · 1:00 pm
- Reverse auctionIf the bid qualifies, after evaluation
Bidding
- Bid type
- Bid
- Evaluation method
- Total value wise evaluation
- Packet type
- Two Packet Bid
- Reverse auction
- Yes, H1-Highest Priced Bid Elimination
- Total quantity
- 15,966
Buyer
- Created by
- parikshit_CK
- Location
- Dimapur · Nagaland
- Portal
- GeM
Important dates
- Published
- 15 Oct 2026, 12:38 pm IST
- Closes
- 26 Oct 2026, 1:00 pm IST
Items & delivery
76 items · Address masked by GeM
***********DIMAPUR
GeM masks the full address in this document.01Super Structure Tower Height 7 Mtr For FSB Make As Per Annx I Of TSQuantity8Delivery20 daysDetailsClose
- Delivery
- 20 days
02Super Structure Assy Deck Panel Type 1 Point 5 Into Zero Point 6 Into 4 Point 12 Mtrs IS 432 Part I 1982 Make As Per Annx I Of TSQuantity34Delivery20 daysDetailsClose
- Delivery
- 20 days
03Decking 4mm Chequered PlateQuantity212Delivery20 daysDetailsClose
- Delivery
- 20 days
04MS Railing Post 50 Into 50 Into 6 Angle 1 Mtrs Height IS 432 Part I 1982Quantity240Delivery20 daysDetailsClose
- Delivery
- 20 days
05Iron Railing 50 Into 50 Into 6 Angle 70 Mtrs IS 432 Part I 1982Quantity560Delivery20 daysDetailsClose
- Delivery
- 20 days
06Decking Panel Joining Member 75 Into 75 Into 6mm 1 Mtrs Lengh IS 432 Part I 1982 Make As Per Annx IQuantity128Delivery20 daysDetailsClose
- Delivery
- 20 days
07Nut And Bolts 50 Into 10mm DiaQuantity1,828Delivery20 daysDetailsClose
- Delivery
- 20 days
08Deck Fixure Arrangement ClampQuantity300Delivery20 daysDetailsClose
- Delivery
- 20 days
09Nut And Bolts Dia 16mm To 50mm LengthQuantity2,300Delivery20 daysDetailsClose
- Delivery
- 20 days
10Base Plate 20mm Thick 300mm Into 300mm With 25mm HoleQuantity32Delivery20 daysDetailsClose
- Delivery
- 20 days
11Foundation Bolt 25mm Dia 450mm LenghQuantity96Delivery20 daysDetailsClose
- Delivery
- 20 days
12Top Pully Saddle Seave 75mm DiaQuantity8Delivery20 daysDetailsClose
- Delivery
- 20 days
13Steel Wire Rope For Main Rope 30mmQuantity600Delivery20 daysDetailsClose
- Delivery
- 20 days
14Steel Wire Rope For Suspender 16mmQuantity700Delivery20 daysDetailsClose
- Delivery
- 20 days
15Eye Bolt Transum 90mm Into 20mm Heavy DutyQuantity128Delivery20 daysDetailsClose
- Delivery
- 20 days
16Wire Rope Grip 12mm SecureQuantity280Delivery20 daysDetailsClose
- Delivery
- 20 days
17Prefabricated And Modified Anchor Main 35mm Dia MS Shaft 20mm MS Plate Of Length 1 Point 5 Mtr Gravity Type AnchorageQuantity8Delivery20 daysDetailsClose
- Delivery
- 20 days
18U Clamp Suspendor ArrangementQuantity68Delivery20 daysDetailsClose
- Delivery
- 20 days
19D Shackle 20 TonQuantity16Delivery20 daysDetailsClose
- Delivery
- 20 days
20Tum Buckle Haevy DutyQuantity24Delivery20 daysDetailsClose
- Delivery
- 20 days
21Wire Rope Grip 30mm SecureQuantity70Delivery20 daysDetailsClose
- Delivery
- 20 days
22Nut And Bolt 16mm DiaQuantity3,000Delivery20 daysDetailsClose
- Delivery
- 20 days
23SWR Thimble Heavy Duty For 30mmQuantity128Delivery20 daysDetailsClose
- Delivery
- 20 days
24SWR Thimble Heavy Duty For 16mmQuantity16Delivery20 daysDetailsClose
- Delivery
- 20 days
25Moris Block 5 Ton CapacityQuantity4Delivery20 daysDetailsClose
- Delivery
- 20 days
26Spanner For 20mm BoltsQuantity8Delivery20 daysDetailsClose
- Delivery
- 20 days
27Spanner For 16mm BoltsQuantity8Delivery20 daysDetailsClose
- Delivery
- 20 days
28Adustable Spanner 12 InchQuantity2Delivery20 daysDetailsClose
- Delivery
- 20 days
29Prefabricated Roller 10 TonQuantity6Delivery20 daysDetailsClose
- Delivery
- 20 days
30Heavy Duty Hook Pully 5 TonQuantity8Delivery20 daysDetailsClose
- Delivery
- 20 days
31Hand Held Grinder Cutter 1800W 11500 RPM 125mm DiaQuantity4Delivery20 daysDetailsClose
- Delivery
- 20 days
32Grinder Cutter Blade Dia 125mm Make As Per Annx I Of TSQuantity20Delivery20 daysDetailsClose
- Delivery
- 20 days
33Portable Welding Machine ARC 220A Heavy Duty IGBT Welder 220 VQuantity2Delivery20 daysDetailsClose
- Delivery
- 20 days
34Welding Rod 60 Pcs Size 4mm Into 450mm In One PktQuantity6Delivery20 daysDetailsClose
- Delivery
- 20 days
35Plaster 6 Inches Material Wooden Heavy Duty Wooden Hand Float Trowel 10 Inch Into 6 Inch Polished Wood PlasteringQuantity4Delivery20 daysDetailsClose
- Delivery
- 20 days
36Plaster 8 Inches Material Wooden Heavy Duty Wooden Hand Float Trowel 10 Inch Into 6 Inch Polished Wood PlasteringQuantity4Delivery20 daysDetailsClose
- Delivery
- 20 days
37Hand Gloves Masonery Work Flocked Liner Neoprene Over Latex Coating Safety GlovesQuantity40Delivery20 daysDetailsClose
- Delivery
- 20 days
38Spirit Level 3 FeetQuantity2Delivery20 daysDetailsClose
- Delivery
- 20 days
39Spanner Set No 8 And 6 To 22mm Conf To IS 2028Quantity2Delivery20 daysDetailsClose
- Delivery
- 20 days
40Plumbob With Kanda And 2 Mtr Thread Made Of Mild Steel Max Weight 250gmQuantity4Delivery20 daysDetailsClose
- Delivery
- 20 days
41Iron TasalaQuantity20Delivery20 daysDetailsClose
- Delivery
- 20 days
42Iron Bucket 15 KgQuantity6Delivery20 daysDetailsClose
- Delivery
- 20 days
43Nylon RopeQuantity200Delivery20 daysDetailsClose
- Delivery
- 20 days
44Pick AxeQuantity10Delivery20 daysDetailsClose
- Delivery
- 20 days
45PhowdaQuantity10Delivery20 daysDetailsClose
- Delivery
- 20 days
46Heavy Duty Hand Hammer Having Cast Iron Appx 200 Into 200 And Weight 12 KG With 1200mm LongQuantity4Delivery20 daysDetailsClose
- Delivery
- 20 days
47ShowelQuantity20Delivery20 daysDetailsClose
- Delivery
- 20 days
48MS Crow Bar 4 Feet Long 32mm DiaQuantity4Delivery20 daysDetailsClose
- Delivery
- 20 days
49Measuring Tape 50 MtrQuantity2Delivery20 daysDetailsClose
- Delivery
- 20 days
50Iron Trowels 4 InchesQuantity6Delivery20 daysDetailsClose
- Delivery
- 20 days
51Iron Trowels 6 InchesQuantity6Delivery20 daysDetailsClose
- Delivery
- 20 days
52Brick Hammer Weight 5 KgQuantity10Delivery20 daysDetailsClose
- Delivery
- 20 days
53Double Wheel Concrete Trolley Hvy Duty MS Steel 80 To 100 Ltr CapacityQuantity4Delivery20 daysDetailsClose
- Delivery
- 20 days
54Cutoff Saw 16 Inches Metalic CutterQuantity2Delivery20 daysDetailsClose
- Delivery
- 20 days
55Bosch Cutoff Saw 16 Inches Metalic Cutter BladesQuantity4Delivery20 daysDetailsClose
- Delivery
- 20 days
56Screw Driver Set Make As Per Appx I Of TSQuantity2Delivery20 daysDetailsClose
- Delivery
- 20 days
57Cutting Plier Make As Per Appx I Of TSQuantity4Delivery20 daysDetailsClose
- Delivery
- 20 days
58Wire Cutter Make As Per Appx I Of TSQuantity4Delivery20 daysDetailsClose
- Delivery
- 20 days
59Water Level 75 Mtr 8mm Dia Pipe For Water LevelQuantity4Delivery20 daysDetailsClose
- Delivery
- 20 days
60Cement PPC 43 Grade HDPE 50 Kg Wt Conf To IS 8112 To 1989Quantity512Delivery20 daysDetailsClose
- Delivery
- 20 days
61Course SandQuantity28Delivery20 daysDetailsClose
- Delivery
- 20 days
62Aggregates 20mmQuantity52Delivery20 daysDetailsClose
- Delivery
- 20 days
63Aggregates 40mmQuantity4Delivery20 daysDetailsClose
- Delivery
- 20 days
64Aggregates 63mmQuantity4Delivery20 daysDetailsClose
- Delivery
- 20 days
65Mild Steel Bar Of Size 8mm Dia Conf To IS 432 Part I 1982Quantity374Delivery20 daysDetailsClose
- Delivery
- 20 days
66Mild Steel Bar Of Size 12mm Dia Conf To IS 432 Part I 1982Quantity1,804Delivery20 daysDetailsClose
- Delivery
- 20 days
67Mild Steel Bar Of Size 16mm Dia Conf To IS 432 Part I 1982Quantity1,240Delivery20 daysDetailsClose
- Delivery
- 20 days
68MS Binding WireQuantity70Delivery20 daysDetailsClose
- Delivery
- 20 days
69GI Chainlink Fencing 50 Into 50mm Dia 3 Point 80mm SWGQuantity280Delivery20 daysDetailsClose
- Delivery
- 20 days
708mm Dia MS Plane Bar For Tie Rod For Chain Link FencingQuantity300Delivery20 daysDetailsClose
- Delivery
- 20 days
71OG Colour Synthetic Enamel Paint 20 LtrQuantity16Delivery20 daysDetailsClose
- Delivery
- 20 days
72Red Oxide Primer 20 LtrQuantity8Delivery20 daysDetailsClose
- Delivery
- 20 days
73Thinner 20 LtrQuantity8Delivery20 daysDetailsClose
- Delivery
- 20 days
74Roller Brush 12 InchQuantity12Delivery20 daysDetailsClose
- Delivery
- 20 days
75Roller Brush 4 InchQuantity12Delivery20 daysDetailsClose
- Delivery
- 20 days
76Roller Brush 2 InchQuantity12Delivery20 daysDetailsClose
- Delivery
- 20 days
No matching items. Try another name, code or schedule.
Tender documents
Bid files and supporting documents, linked directly from GeM.
- Bid documentOpen
Full bid details and conditions
- Specification DocumentOpen
Applies to items 1–76
- BOQ Detail DocumentOpen
Applies to items 1–76
Policy & contract references
Documents you must submit
- Experience Criteria
- Past Performance
- Bidder Turnover
- Certificate (Requested in ATC)
- OEM Authorization Certificate
- OEM Annual Turnover
Show all 8
- Additional Doc 1 (Requested in ATC)
- Compliance of BoQ specification and supporting document
Eligibility
Experience
2 years
Min. turnover
₹38 L
a year, 3-year average
OEM turnover
₹3.9 Cr
Past performance
20%
of the bid quantity
Experience & turnover exemptions
Startups
No exemptionExemption conditions
Exemptions depend on the evidence and conditions specified in the bid.
Preferences & relaxations
- MSE purchase preference
- MII preference
- Class-1/2 local suppliers
- EMD exemption: no
- Inspection required: no
Check each criterion against the tender notice before you bid.
Commercial conditions
- EMD
- ₹290,000
- Performance guarantee
- Not required
- Offer validity
- 180 days
Buyer requirements & conditions
Buyer-added conditions from the bid document.
Actual delivery (and Installation & Commissioning (if covered in scope of supply)) is to be done at following address 56 INF Div AOR Arunachal Pradesh North East Region 3 Engr Det NCO PIN- .
Bidder shall submit the following documents along with their bid for Vendor Code Creation:
- a.Copy of PAN Card.
- b.Copy of GSTIN.
- c.Copy of Cancelled Cheque.
- d.Copy of EFT Mandate duly certified by Bank.
Experience Criteria: The Bidder or its OEM {themselves or through reseller(s)} should have regularly, manufactured and supplied same or similar Category Products to any Central / State Govt Organization / PSU for 2 years before the bid opening date. Copies of relevant contracts to be submitted along with bid in support of having supplied some quantity during each of the year. In case of bunch bids, the primary product having highest value should meet this criterion.
Scope of supply (Bid price to include all cost components) : Only supply of Goods
OPTION CLAUSE: The Purchaser reserves the right to increase or decrease the quantity to be ordered up to 50 percent of bid quantity at the time of placement of contract. The purchaser also reserves the right to increase the ordered quantity up to 50% of the contracted quantity during the currency of the contract at the contracted rates. The delivery period of quantity shall commence from the last date of original delivery order and in cases where option clause is exercised during the extended delivery period the additional time shall commence from the last date of extended delivery period. The additional delivery time shall be (Increased quantity ÷ Original quantity) × Original delivery period (in days), subject to minimum of 30 days. If the original delivery period is less than 30 days, the additional time equals the original delivery period. The Purchaser may extend this calculated delivery duration up to the original delivery period while exercising the option clause. Bidders must comply with these terms.
OPTIONAL SITE VISIT:
- 1.The Bidder is advised to visit and examine the installation site and its surroundings and obtain for itself on its own responsibility all information that may be necessary for preparing the Bid. The costs of visiting the site shall be borne by the Bidder. At their Own Cost and A Cert regarding Site Visit reqd to upload duly signed by Engr Rep.
- 2.The Bidder representative shall be allowed entry upon consignee premises for such visits, only upon the express conditions that the Bidder will release and indemnify the Buyer and Consignee against all liabilities arising out of such visit including death or injury, loss or damage to property, and any other loss, damage, costs, and expenses incurred as a result of such visit.
- 3.The Bidder shall not be entitled to hold any claim against Buyer for noncompliance due to lack of any kind of pre-requisite information as it is the sole responsibility of the Bidder to obtain all the necessary information with regard to site, surrounding, working conditions, weather etc. on its own before submission of the bid.
Without prejudice to Buyer’s right to price adjustment by way of discount or any other right or remedy available to Buyer, Buyer may terminate the Contract or any part thereof by a written notice to the Seller, if:
- i)The Seller fails to comply with any material term of the Contract. ii) The Seller informs Buyer of its inability to deliver the Material(s) or any part thereof within the stipulated Delivery Period or such inability otherwise becomes apparent. iii) The Seller fails to deliver the Material(s) or any part thereof within the stipulated Delivery Period and/or to replace/rectify any rejected or defective Material(s) promptly. iv) The Seller becomes bankrupt or goes into liquidation.
- v)The Seller makes a general assignment for the benefit of creditors. vi) A receiver is appointed for any substantial property owned by the Seller. vii) The Seller has misrepresented to Buyer, acting on which misrepresentation Buyer has placed the Purchase Order on the Seller.
- 8.Turnover Bidder Turn Over Criteria: The minimum average annual financial turnover of the bidder during the last three years, ending on 31st March of the previous financial year, should be as indicated in the bid document. Documentary evidence in the form of certified Audited Balance Sheets of relevant periods or a certificate from the Chartered Accountant / Cost Accountant indicating the turnover details for the relevant period shall be uploaded with the bid. In case the date of constitution / incorporation of the bidder is less than 3 year old, the average turnover in respect of the completed financial years after the date of constitution shall be taken into account for this criteria.
- 9.Turnover OEM Turn Over Criteria: The minimum average annual financial turnover of the OEM of the offered product during the last three years, ending on 31st March of the previous financial year, should be as indicated in the bid document. Documentary evidence in the form of certified Audited Balance Sheets of relevant periods or a certificate from the Chartered Accountant / Cost Accountant indicating the turnover details for the relevant period shall be uploaded with the bid. In case the date of constitution / incorporation of the OEM is less than 3 year old, the average turnover in respect of the completed financial years after the date of constitution shall be taken into account for this criteria. In case of bunch bids, the OEM of CATEGORY RELATED TO primary product having highest bid value should meet this criterion.
IMPORTED PRODUCTS: In case of imported products, OEM or Authorized Seller of OEM should have a registered office in India to provide after sales service support in India. The certificate to this effect should be submitted.
Availability of Service Centres: Bidder/OEM must have a Functional Service Centre in the State of each Consignee's Location in case of carry-in warranty. (Not applicable in case of goods having on-site warranty). If service center is not already there at the time of bidding, successful bidder / OEM shall have to establish one within 30 days of award of contract. Payment shall be released only after submission of documentary evidence of having Functional Service Centre.
Dedicated /toll Free Telephone No. for Service Support : BIDDER/OEM must have Dedicated/toll Free Telephone No. for Service Support.
Escalation Matrix For Service Support : Bidder/OEM must provide Escalation Matrix of Telephone Numbers for Service Support.
Bidder's offer is liable to be rejected if they don't upload any of the certificates / documents sought in the Bid document, ATC and Corrigendum if any.
ISO 9001: The bidder or the OEM of the offered products must have ISO 9001 certification.
Material Test Certificate Should Be Sent Along with The Supply. The Material Will Be Checked by Buyer’s Lab & the Results of the Lab will be the Sole Criteria for Acceptance of the Item.
The bidder is required to upload, along with the bid, all relevant certificates such as BIS licence, type test certificate, approval certificates and other certificates as prescribed in the Product Specification given in the bid document.
To be eligible for award of contract, Bidder / OEM must possess following Certificates / Test Reports on the date of bid opening (to be uploaded with bid): As per bid docus uploaded. .
Warranty period of the supplied products shall be 1 years from the date of final acceptance of goods or after completion of installation, commissioning & testing of goods (if included in the scope of supply), at consignee location. OEM Warranty certificates must be submitted by Successful Bidder at the time of delivery of Goods. The seller should guarantee the rectification of goods in case of any break down during the guarantee period. Seller should have well established Installation, Commissioning, Training, Troubleshooting and Maintenance Service group in INDIA for attending the after sales service. Details of Service Centres near consignee destinations are to be uploaded along with the bid.
Buyer uploaded ATC document Click here to view the file.
Similar open tenders
Soonest first- 20h 0mleftPURCHASE OF TOOLS EQUIPMENT MACHINARY AND FURNITURE ITEMLabour and Employment Department Gujarat · Closes 16 Oct 2026
- 23h 0mleftEntry And Mid Level Desktop Computer, Online UPS (?10 KVA) With Battery Conforming To IS…Ministry of Defence · Closes 16 Oct 2026
- 4 daysleftCNC TOOLSMinistry of Defence · Closes 20 Oct 2026
- 5 daysleftSiemens make MCC panel sparesPMO · Closes 21 Oct 2026
- 7 daysleftEnd Mill Cutter Carbide Zero Five MMMinistry of Defence · Closes 23 Oct 2026
- 8 daysleftPrefabricated Structure 14700x6000x2400mm As Per Specification And Schedule Of Structure…Ministry of Defence · Closes 24 Oct 2026
- 10 daysleftSPECIFIC TO TYPE TOOLSMinistry of Defence · Closes 26 Oct 2026
- 15 daysleftTool and EquipmentTechnical Education Department Chhattisgarh · Closes 31 Oct 2026
Search similar in the explorerFind this tender in the explorer