11 facts from the tender

Ministry of Defence published this goods tender on GeM on 7 Oct 2026, for Medak, Telangana. No EMD is required. It closed on 8 Oct 2026, 11:00 am IST. Bid number GEM/2026/R/747172.

From the bid document

TimelineBid → reverse auction

  1. Bid published8 Sep 2026
  2. Bid closed18 Sep 2026 · 3:00 pm
  3. RA issued7 Oct 2026
  4. RA started7 Oct 2026 · 10:00 am
  5. RA ended8 Oct 2026 · 11:00 am
53 lots
  1. Schedule 1 Fastener17 Oct 2026, 10:00 am → 8 Oct 2026, 10:00 amDocument
  2. Schedule 2 Fastener27 Oct 2026, 10:00 am → 8 Oct 2026, 10:00 amDocument
  3. Schedule 3 Fastener37 Oct 2026, 10:00 am → 8 Oct 2026, 10:00 amDocument
  4. Schedule 4 Fastener47 Oct 2026, 10:00 am → 8 Oct 2026, 10:00 amDocument
  5. Schedule 5 Fastener57 Oct 2026, 10:00 am → 8 Oct 2026, 10:00 amDocument
  6. Schedule 6 Fastener67 Oct 2026, 10:00 am → 8 Oct 2026, 10:00 amDocument
  7. Schedule 7 Fastener77 Oct 2026, 10:00 am → 8 Oct 2026, 10:00 amDocument
  8. Schedule 8 Fastener87 Oct 2026, 10:00 am → 8 Oct 2026, 10:00 amDocument
  9. Schedule 9 Fastener97 Oct 2026, 10:00 am → 8 Oct 2026, 10:00 amDocument
  10. Schedule 10 Fastener107 Oct 2026, 10:00 am → 8 Oct 2026, 10:00 amDocument
  11. Schedule 11 Fastener117 Oct 2026, 10:00 am → 8 Oct 2026, 10:00 amDocument
  12. Schedule 12 Fastener127 Oct 2026, 10:00 am → 8 Oct 2026, 10:00 amDocument
  13. Schedule 13 Fastener137 Oct 2026, 10:00 am → 8 Oct 2026, 10:00 amDocument
  14. Schedule 14 Fastener147 Oct 2026, 10:00 am → 8 Oct 2026, 10:00 amDocument
  15. Schedule 15 Fastener157 Oct 2026, 10:00 am → 8 Oct 2026, 10:00 amDocument
  16. Schedule 16 Fastener167 Oct 2026, 10:00 am → 8 Oct 2026, 10:00 amDocument
  17. Schedule 17 Fastener177 Oct 2026, 10:00 am → 8 Oct 2026, 10:00 amDocument
  18. Schedule 18 Fastener187 Oct 2026, 11:00 am → 8 Oct 2026, 11:00 amDocument
  19. Schedule 19 Fastener197 Oct 2026, 11:00 am → 8 Oct 2026, 11:00 amDocument
  20. Schedule 20 Fastener207 Oct 2026, 11:00 am → 8 Oct 2026, 11:00 amDocument
  21. Schedule 21 Fastener217 Oct 2026, 11:00 am → 8 Oct 2026, 11:00 amDocument
  22. Schedule 22 Fastener227 Oct 2026, 11:00 am → 8 Oct 2026, 11:00 amDocument
  23. Schedule 23 Fastener237 Oct 2026, 11:00 am → 8 Oct 2026, 11:00 amDocument
  24. Schedule 24 Fastener247 Oct 2026, 11:00 am → 8 Oct 2026, 11:00 amDocument
  25. Schedule 25 Fastener257 Oct 2026, 11:00 am → 8 Oct 2026, 11:00 amDocument
  26. Schedule 26 Fastener267 Oct 2026, 11:00 am → 8 Oct 2026, 11:00 amDocument
  27. Schedule 27 Fastener277 Oct 2026, 11:00 am → 8 Oct 2026, 11:00 amDocument
  28. Schedule 28 Fastener287 Oct 2026, 11:00 am → 8 Oct 2026, 11:00 amDocument
  29. Schedule 29 Fastener297 Oct 2026, 11:00 am → 8 Oct 2026, 11:00 amDocument
  30. Schedule 30 Fastener307 Oct 2026, 11:00 am → 8 Oct 2026, 11:00 amDocument
  31. Schedule 31 Fastener317 Oct 2026, 11:00 am → 8 Oct 2026, 11:00 amDocument
  32. Schedule 32 Fastener327 Oct 2026, 11:00 am → 8 Oct 2026, 11:00 amDocument
  33. Schedule 33 Fastener337 Oct 2026, 11:00 am → 8 Oct 2026, 11:00 amDocument
  34. Schedule 34 Fastener347 Oct 2026, 11:00 am → 8 Oct 2026, 11:00 amDocument
  35. Schedule 36 Fastener367 Oct 2026, 11:00 am → 8 Oct 2026, 11:00 amDocument
  36. Schedule 37 Fastener377 Oct 2026, 11:00 am → 8 Oct 2026, 11:00 amDocument
  37. Schedule 38 Fastener387 Oct 2026, 11:00 am → 8 Oct 2026, 11:00 amDocument
  38. Schedule 39 Fastener397 Oct 2026, 11:00 am → 8 Oct 2026, 11:00 amDocument
  39. Schedule 40 Fastener407 Oct 2026, 11:00 am → 8 Oct 2026, 11:00 amDocument
  40. Schedule 41 Fastener417 Oct 2026, 11:00 am → 8 Oct 2026, 11:00 amDocument
  41. Schedule 42 Fastener427 Oct 2026, 11:00 am → 8 Oct 2026, 11:00 amDocument
  42. Schedule 43 Fastener437 Oct 2026, 11:00 am → 8 Oct 2026, 11:00 amDocument
  43. Schedule 44 Fastener447 Oct 2026, 11:00 am → 8 Oct 2026, 11:00 amDocument
  44. Schedule 45 Fastener457 Oct 2026, 11:00 am → 8 Oct 2026, 11:00 amDocument
  45. Schedule 46 Fastener467 Oct 2026, 11:00 am → 8 Oct 2026, 11:00 amDocument
  46. Schedule 47 Fastener477 Oct 2026, 11:00 am → 8 Oct 2026, 11:00 amDocument
  47. Schedule 48 Fastener487 Oct 2026, 11:00 am → 8 Oct 2026, 11:00 amDocument
  48. Schedule 49 Fastener497 Oct 2026, 11:00 am → 8 Oct 2026, 11:00 amDocument
  49. Schedule 50 Fastener507 Oct 2026, 11:00 am → 8 Oct 2026, 11:00 amDocument
  50. Schedule 51 Fastener517 Oct 2026, 11:00 am → 8 Oct 2026, 11:00 amDocument
  51. Schedule 52 Fastener527 Oct 2026, 11:00 am → 8 Oct 2026, 11:00 amDocument
  52. Schedule 53 Fastener537 Oct 2026, 11:00 am → 8 Oct 2026, 11:00 amDocument
  53. Schedule 54 Fastener547 Oct 2026, 11:00 am → 8 Oct 2026, 11:00 amDocument

Bidding

Bid type
Reverse auction
Evaluation method
Item wise evaluation
Packet type
Two Packet Bid
Reverse auction
Yes, H1-Highest Priced Bid Elimination
Auction for bid
GEM/2026/B/7996688
Total quantity
30,706

Buyer

Created by
DGMIMMNP
Location
Medak · Telangana
Portal
GeM

Important dates

Published
7 Oct 2026, 10:00 am IST
Closed
8 Oct 2026, 11:00 am IST

Bid & reverse auction

This reverse auction is the price round of bid GEM/2026/B/7996688. GeM's auction document lists only the auction, so the items, delivery, eligibility and buyer terms below come from the bid document and are marked From the bid document.

Bid document (PDF) Reverse auction document (PDF)

Items & delivery

From the bid document

54 items · Address masked by GeM · 53 of 53 auction lots matched to items

Delivery location · all items

***********Medak

GeM masks the full address in this document.
Showing 54 of 54
01Fastener1Quantity100Delivery150 daysAuctionAuction 7 Oct 2026, 10:00 → 8 Oct 2026, 10:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
02Fastener2Quantity300Delivery150 daysAuctionAuction 7 Oct 2026, 10:00 → 8 Oct 2026, 10:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
03Fastener3Quantity200Delivery150 daysAuctionAuction 7 Oct 2026, 10:00 → 8 Oct 2026, 10:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
04Fastener4Quantity300Delivery150 daysAuctionAuction 7 Oct 2026, 10:00 → 8 Oct 2026, 10:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
05Fastener5Quantity300Delivery150 daysAuctionAuction 7 Oct 2026, 10:00 → 8 Oct 2026, 10:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
06Fastener6Quantity100Delivery150 daysAuctionAuction 7 Oct 2026, 10:00 → 8 Oct 2026, 10:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
07Fastener7Quantity200Delivery150 daysAuctionAuction 7 Oct 2026, 10:00 → 8 Oct 2026, 10:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
08Fastener8Quantity1,200Delivery150 daysAuctionAuction 7 Oct 2026, 10:00 → 8 Oct 2026, 10:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
09Fastener9Quantity1,400Delivery150 daysAuctionAuction 7 Oct 2026, 10:00 → 8 Oct 2026, 10:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
10Fastener10Quantity400Delivery150 daysAuctionAuction 7 Oct 2026, 10:00 → 8 Oct 2026, 10:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
11Fastener11Quantity1Delivery150 daysAuctionAuction 7 Oct 2026, 10:00 → 8 Oct 2026, 10:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
12Fastener12Quantity3,900Delivery150 daysAuctionAuction 7 Oct 2026, 10:00 → 8 Oct 2026, 10:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
13Fastener13Quantity400Delivery150 daysAuctionAuction 7 Oct 2026, 10:00 → 8 Oct 2026, 10:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
14Fastener14Quantity400Delivery150 daysAuctionAuction 7 Oct 2026, 10:00 → 8 Oct 2026, 10:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
15Fastener15Quantity800Delivery150 daysAuctionAuction 7 Oct 2026, 10:00 → 8 Oct 2026, 10:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
16Fastener16Quantity300Delivery150 daysAuctionAuction 7 Oct 2026, 10:00 → 8 Oct 2026, 10:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
17Fastener17Quantity3,900Delivery150 daysAuctionAuction 7 Oct 2026, 10:00 → 8 Oct 2026, 10:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
18Fastener18Quantity400Delivery150 daysAuctionAuction 7 Oct 2026, 11:00 → 8 Oct 2026, 11:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
19Fastener19Quantity300Delivery150 daysAuctionAuction 7 Oct 2026, 11:00 → 8 Oct 2026, 11:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
20Fastener20Quantity200Delivery150 daysAuctionAuction 7 Oct 2026, 11:00 → 8 Oct 2026, 11:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
21Fastener21Quantity1,500Delivery150 daysAuctionAuction 7 Oct 2026, 11:00 → 8 Oct 2026, 11:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
22Fastener22Quantity100Delivery150 daysAuctionAuction 7 Oct 2026, 11:00 → 8 Oct 2026, 11:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
23Fastener23Quantity400Delivery150 daysAuctionAuction 7 Oct 2026, 11:00 → 8 Oct 2026, 11:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
24Fastener24Quantity1,000Delivery150 daysAuctionAuction 7 Oct 2026, 11:00 → 8 Oct 2026, 11:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
25Fastener25Quantity100Delivery150 daysAuctionAuction 7 Oct 2026, 11:00 → 8 Oct 2026, 11:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
26Fastener26Quantity500Delivery150 daysAuctionAuction 7 Oct 2026, 11:00 → 8 Oct 2026, 11:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
27Fastener27Quantity200Delivery150 daysAuctionAuction 7 Oct 2026, 11:00 → 8 Oct 2026, 11:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
28Fastener28Quantity200Delivery150 daysAuctionAuction 7 Oct 2026, 11:00 → 8 Oct 2026, 11:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
29Fastener29Quantity200Delivery150 daysAuctionAuction 7 Oct 2026, 11:00 → 8 Oct 2026, 11:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
30Fastener30Quantity200Delivery150 daysAuctionAuction 7 Oct 2026, 11:00 → 8 Oct 2026, 11:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
31Fastener31Quantity100Delivery150 daysAuctionAuction 7 Oct 2026, 11:00 → 8 Oct 2026, 11:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
32Fastener32Quantity200Delivery150 daysAuctionAuction 7 Oct 2026, 11:00 → 8 Oct 2026, 11:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
33Fastener33Quantity2,400Delivery150 daysAuctionAuction 7 Oct 2026, 11:00 → 8 Oct 2026, 11:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
34Fastener34Quantity5,400Delivery150 daysAuctionAuction 7 Oct 2026, 11:00 → 8 Oct 2026, 11:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
35Fastener35Quantity130Delivery150 daysAuctionNot in the reverse auctionDetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
36Fastener36Quantity65Delivery150 daysAuctionAuction 7 Oct 2026, 11:00 → 8 Oct 2026, 11:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
37Fastener37Quantity65Delivery150 daysAuctionAuction 7 Oct 2026, 11:00 → 8 Oct 2026, 11:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
38Fastener38Quantity65Delivery150 daysAuctionAuction 7 Oct 2026, 11:00 → 8 Oct 2026, 11:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
39Fastener39Quantity65Delivery150 daysAuctionAuction 7 Oct 2026, 11:00 → 8 Oct 2026, 11:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
40Fastener40Quantity65Delivery150 daysAuctionAuction 7 Oct 2026, 11:00 → 8 Oct 2026, 11:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
41Fastener41Quantity130Delivery150 daysAuctionAuction 7 Oct 2026, 11:00 → 8 Oct 2026, 11:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
42Fastener42Quantity65Delivery150 daysAuctionAuction 7 Oct 2026, 11:00 → 8 Oct 2026, 11:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
43Fastener43Quantity65Delivery150 daysAuctionAuction 7 Oct 2026, 11:00 → 8 Oct 2026, 11:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
44Fastener44Quantity65Delivery150 daysAuctionAuction 7 Oct 2026, 11:00 → 8 Oct 2026, 11:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
45Fastener45Quantity65Delivery150 daysAuctionAuction 7 Oct 2026, 11:00 → 8 Oct 2026, 11:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
46Fastener46Quantity65Delivery150 daysAuctionAuction 7 Oct 2026, 11:00 → 8 Oct 2026, 11:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
47Fastener47Quantity65Delivery150 daysAuctionAuction 7 Oct 2026, 11:00 → 8 Oct 2026, 11:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
48Fastener48Quantity130Delivery150 daysAuctionAuction 7 Oct 2026, 11:00 → 8 Oct 2026, 11:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
49Fastener49Quantity800Delivery150 daysAuctionAuction 7 Oct 2026, 11:00 → 8 Oct 2026, 11:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
50Fastener50Quantity600Delivery150 daysAuctionAuction 7 Oct 2026, 11:00 → 8 Oct 2026, 11:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
51Fastener51Quantity100Delivery150 daysAuctionAuction 7 Oct 2026, 11:00 → 8 Oct 2026, 11:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
52Fastener52Quantity200Delivery150 daysAuctionAuction 7 Oct 2026, 11:00 → 8 Oct 2026, 11:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
53Fastener53Quantity100Delivery150 daysAuctionAuction 7 Oct 2026, 11:00 → 8 Oct 2026, 11:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess
54Fastener54Quantity200Delivery150 daysAuctionAuction 7 Oct 2026, 11:00 → 8 Oct 2026, 11:00DetailsClose
Delivery
150 days

Specifications & requirements

ITC on GST
जीएसट उपकर कर Hे1डट /ITC on GST Cess

Tender documents

Bid files and supporting documents, linked directly from GeM.

Policy & contract references

Documents you must submit

  • Certificate (Requested in ATC)

Eligibility

Experience & turnover exemptions

Micro & small enterprises (MSE)

No exemption
From the reverse auction
Exemption conditions

Exemptions depend on the evidence and conditions specified in the bid.

Preferences & relaxations

From the bid document

  • MSE purchase preference
  • MII preference
  • Class-1/2 local suppliers
  • EMD exemption
  • Inspection required: no

Check each criterion against the tender notice before you bid.

Commercial conditions

From the bid document

EMD
Not required
Performance guarantee
Not required
Offer validity
180 days

Payment terms

From the bid document

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

View PDF · p. 3

Reverse auction extension

From the reverse auction

If any seller submits the offer price during last minutes of RA end time, then RA will be automatically extended for next minutes from the last participation time. (A maximum of times)

View PDF · p. 1

Buyer requirements & conditions

Buyer-added conditions from the bid and the reverse-auction documents.

From the bid document

OPTION CLAUSE: The Purchaser reserves the right to increase or decrease the quantity to be ordered up to 50 percent of bid quantity at the time of placement of contract. The purchaser also reserves the right to increase the ordered quantity up to 50% of the contracted quantity during the currency of the contract at the contracted rates. The delivery period of quantity shall commence from the last date of original delivery order and in cases where option clause is exercised during the extended delivery period the additional time shall commence from the last date of extended delivery period. The additional delivery time shall be (Increased quantity ÷ Original quantity) × Original delivery period (in days), subject to minimum of 30 days. If the original delivery period is less than 30 days, the additional time equals the original delivery period. The Purchaser may extend this calculated delivery duration up to the original delivery period while exercising the option clause. Bidders must comply with these terms.

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

  • a.Copy of PAN Card.
  • b.Copy of GSTIN.
  • c.Copy of Cancelled Cheque.
  • d.Copy of EFT Mandate duly certified by Bank.
03

Certificates

View PDF · p. 41

Bidder's offer is liable to be rejected if they don't upload any of the certificates / documents sought in the Bid document, ATC and Corrigendum if any.

  • 4.Purchase Preference (Centre) Purchase preference to Micro and Small Enterprises (MSEs): Purchase preference will be given to MSEs as defined in Public Procurement Policy for Micro and Small Enterprises (MSEs) Order, 2012 dated 23.03.2012 issued by Ministry of Micro, Small and Medium Enterprises and its subsequent Orders/Notifications issued by concerned Ministry. If the bidder wants to avail the Purchase preference, the bidder must be the manufacturer of the offered product in case of bid for supply of goods. Traders are excluded from the purview of Public Procurement Policy for Micro and Small Enterprises. In respect of bid for Services, the bidder must be the Service provider of the offered Service. Relevant documentary evidence in this regard shall be uploaded along with the bid in respect of the offered product or service. If L-1 is not an MSE and MSE Seller (s) has/have quoted price within L-1+ 15% of margin of purchase preference /price band defined in relevant policy, such Seller shall be given opportunity to match L-1 price and contract will be awarded for percentage of 25% of total value.
  • 5.Purchase Preference (Centre) Purchase Preference linked with Local Content (PP-LC) Policy: The bid clause regarding “Preference to Make In India products” stands modified in this bid and shall be governed by the PPLC Policy No. FP-20013/2/2017-FP-PNG dated 17.11.2020 issued by MoP&NG as amended up to date. Accordingly, bidders with Local Content less than or equal to 20% will be treated as “Non Local Supplier”. The prescribed LC shall be applicable on the date of Bid opening. Sanctions on the bidders for false / wrong declaration or not fulfilling the Local Content requirement shall be as per the PPLC policy. Further following additional provisions are added in the certification and verification of local content provision of the Preference to Make in India clause:
  • i.In case of foreign bidder, certificate from the statutory auditor or cost auditor of their own office or subsidiary in India giving the percentage of local content is also acceptable. In case office or subsidiary in India does not exist or Indian office/subsidiary is not required to appoint statutory auditor or cost auditor, certificate from practicing cost accountant or practicing chartered accountant giving the percentage of local content is also acceptable. ii. Along with Each Invoice: The local content certificate (issued by statutory auditor on behalf of procuring company) shall be submitted along with each invoice raised. However, the % of local content may vary with each invoice while maintaining the overall % of local content for the total work/purchase of the pro-rata local content requirement. In case, it is not satisfied cumulatively in the invoices raised up to that stage, the supplier shall indicate how the local content requirement would be met in the subsequent stages. iii. The bidder shall submit an undertaking from the authorized signatory of bidder having the Power of Attorney along with the bid stating the bidder meets the mandatory minimum LC requirement and such undertaking shall become a part of the contract.
  • 6.Purchase Preference (Centre) Procurement under this bid is reserved for purchase from Micro and Small Enterprises whose credentials are validated online through Udyog Aadhaar/URC for that product/service category. If the bidder wants to avail the reservation benefit, the bidder must be the manufacturer of the offered product in case of bid for supply of goods. Traders are excluded from the purview of Public Procurement Policy for Micro and Small Enterprises. In respect of bid for Services, the bidder must be the Service provider of the offered Service. Relevant documentary evidence in this regard shall be uploaded along with the bid in respect of the offered product or service.

Warranty period of the supplied products shall be 2 years from the date of final acceptance of goods or after completion of installation, commissioning & testing of goods (if included in the scope of supply), at consignee location. OEM Warranty certificates must be submitted by Successful Bidder at the time of delivery of Goods. The seller should guarantee the rectification of goods in case of any break down during the guarantee period. Seller should have well established Installation, Commissioning, Training, Troubleshooting and Maintenance Service group in INDIA for attending the after sales service. Details of Service Centres near consignee destinations are to be uploaded along with the bid.

08

Buyer Added Bid Specific ATC

View PDF · p. 42

Buyer Added text based ATC clauses The DRDL approved source vendors for the published Fasteners are eligible to participate in the bidding pr ocess and other vendors will be disqualified during the technical evaluation of the bid .

09

Buyer Added Bid Specific ATC

View PDF · p. 42

Buyer uploaded ATC document Click here to view the file.

From the reverse auction

Reverse auction — offer validity

View PDF · p. 1

Participation by the bidder in RA process would be considered as their consent for extension in offer validity by 30 days by the date of RA initiation.

Open on GeM