Browse all bids
GeMClosedGoodsReverse auction

Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1)

Directorate Of Employment & Training

Labour and Employment Department Gujarat › Det

Delivers to

Banaskantha, Gujarat

Overview

11 facts from the tender

Labour and Employment Department Gujarat published this goods tender on GeM on 9 Oct 2026, for Banaskantha, Gujarat. The estimated value is ₹75,000 and no EMD is required. It closed on 10 Oct 2026, 4:00 pm IST. Bid number GEM/2026/R/748932.

From the bid document

TimelineBid → reverse auction

  1. Bid published25 Aug 2026
  2. Bid closed15 Sep 2026 · 4:00 pm
  3. RA issued8 Oct 2026
  4. RA started9 Oct 2026 · 4:00 pm
  5. RA ended10 Oct 2026 · 4:00 pm

Bidding

Bid type
Reverse auction
Evaluation method
Total value wise evaluation
Packet type
Two Packet Bid
Reverse auction
Yes, H1-Highest Priced Bid Elimination
Auction for bid
GEM/2026/B/7960400
Total quantity
1

Buyer

Created by
DANTIWADA_CON
Location
Banaskantha · Gujarat
Portal
GeM

Important dates

Published
9 Oct 2026, 4:00 pm IST
Closed
10 Oct 2026, 4:00 pm IST

Bid & reverse auction

This reverse auction is the price round of bid GEM/2026/B/7960400. GeM's auction document lists only the auction, so the items, delivery, eligibility and buyer terms below come from the bid document and are marked From the bid document.

Bid document (PDF) Reverse auction document (PDF)

Items & delivery

From the bid document

1 item · 1 delivery location

Item 1

Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1)

Quantity1 pieces
Delivery location

385505,GOVT. INDUSTRIAL TRAINING INSTITUTE, DANTIWADA, OPP. MODEL SCHOOL, DANTIWADA COLONY, TA- DANTIWADA, DI - BANASKANTHA

Delivery
20 days
Specifications & requirements · 10
Bis Required
Yes
Specification Name
बड के िलए आवOयक अनुमत मूVय /Bid Requirement (Allowed Values)
Rating (in KVA)
5
Input Voltage (AC, 50 Hz)
Single Phase, 160V - 260V
Output Voltage (AC, 50 Hz)
Single Phase, 230V±1%,
Availability of Inbuilt Isolation Transformer
Yes, No
Type of Battery
SMF-VRLA (Sealed Maintenance Free-Valve Regulated Lead Acid) / Stationary Lead Acid Batteries
Backup Time
60.0 (minute)
Minimum Standard Warranty
1.0 (year)
The above specifications are mentioned due to GeM portal limitations. The actual requirement must be as per ATC
As Attached specification in Buyer uploaded ATC document. ** NOTE – The bidder must be required to supply all items/materials in accordance with the specifications mentioned in the ATC (Additional Terms & Conditions) of the bid.

Tender documents

Bid files and supporting documents, linked directly from GeM.

Policy & contract references

Documents you must submit

  • Experience Criteria
  • Past Performance
  • Bidder Turnover
  • Certificate (Requested in ATC)
  • OEM Authorization Certificate
  • OEM Annual Turnover
Show all 7
  • Additional Doc 1 (Requested in ATC)

Eligibility

From the bid document

Experience

3 years

OEM turnover

₹2 L

Past performance

10%

of the bid quantity

Experience & turnover exemptions

Micro & small enterprises (MSE)

No exemption
From the reverse auction
Exemption conditions

Startups

Complete exemption
From the reverse auction
Exemption conditions

Yes | Complete

View PDF · p. 1

Exemptions depend on the evidence and conditions specified in the bid.

Preferences & relaxations

From the bid document

  • MSE purchase preference
  • MII preference
  • EMD exemption
  • Inspection required: no

Check each criterion against the tender notice before you bid.

Commercial conditions

From the bid document

EMD
Not required
Performance guarantee
5% for 13 months
Offer validity
180 days

Payment terms

From the bid document

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

View PDF · p. 2

Reverse auction extension

From the reverse auction

If any seller submits the offer price during last 15 minutes of RA end time, then RA will be automatically extended for next 15 minutes from the last participation time. There is no limit on such RA extension cycle.

View PDF · p. 1

Buyer requirements & conditions

Buyer-added conditions from the bid and the reverse-auction documents.

From the bid document

OPTION CLAUSE: The Purchaser reserves the right to increase or decrease the quantity to be ordered up to 25 percent of bid quantity at the time of placement of contract. The purchaser also reserves the right to increase the ordered quantity up to 25% of the contracted quantity during the currency of the contract at the contracted rates. The delivery period of quantity shall commence from the last date of original delivery order and in cases where option clause is exercised during the extended delivery period the additional time shall commence from the last date of extended delivery period. The additional delivery time shall be (Increased quantity ÷ Original quantity) × Original delivery period (in days), subject to minimum of 30 days. If the original delivery period is less than 30 days, the additional time equals the original delivery period. The Purchaser may extend this calculated delivery duration up to the original delivery period while exercising the option clause. Bidders must comply with these terms.

02

Buyer Added Bid Specific ATC

View PDF · p. 6

Buyer Added text based ATC clauses After award of contract – Successful Bidder shall have to get advance sample approved from buyer before bulk manufacturing / starting bulk supplies.Successful Bidder shall submit 1.samples for Buyer's approval, within 15 days of award of contract. Buyer shall, as per contract specificati ons framework, either approve the advance sample or will provide complete list of modification required in the sample within 15 days of receipt of advance sample. Seller shall be required to ensure supply as per a pproved sample with modifications as communicated by Buyer. If there is delay from buyer side in approv al of advance sample – the delivery period shall be refixed without LD for the period of delay in sample ap proval. In case, the sample is found to have major deviations / not conforming to the Contract specification s, the buyer atits discretion may call for fresh samples for approval before allowing bulk supplies or mayt e rminate the contract after notifying the deviations to the seller. Unless otherwise provided in the contract , all samples required for test shall be supplied by the contractor free of cost. Where under the contract, the contractor is required to submit an advance sample, any expenses incurred by the contractor on or in con nection with the production of stores in bulk, before the sample has been approved unconditionally shall b e borne by the Seller and he shall not claim any compensation in the event of such sample being foundu n acceptable by the Buyer / Consignee 2.Forms of EMD and PBG : Bidders can also submit the EMD with Account Payee Demand Draft in favour of IMC SOCIETY OF Dantiwada Payable at Dantiwada. Bidder has to upload scanned copy / proof of the DD alo ng with bid and has to ensure delivery of hardcopy to the Buyer within 5 days of Bid End date / Bid Openin g date. 3.Bidder financial standing: The bidder should not be under liquidation, court receivership or similar proce edings, should not be bankrupt. Bidder to upload undertaking to this effect with bid. Undertaking is must b e in rs 300 Stamp as per Gov. Rules and Regulation. 4.Certificates:- Bidder's offer is liable to be rejected if they don't upload any of the certificates / documents sought in the Bid document, ATC and Corrigendum if any. 5.Bidders are advised to check applicable GST on their own before quoting. Buyer will not take any respon sibility in this regards. GST reimbursement will be as per actuals or as per applicable rates (whichever is lo wer), subject to the maximum of quoted GST % 6.Installation, Commissioning, Testing, Configuration, Trai ning is to be carried out by OEM / OEM Certified resource or OEM authorised Reseller. No Extra MOney will be paid Out for It. 7.Manufacturer Authorization: Wherever Authorised Distributors/service providers are submitting the bid, A uthorisation Form /Certificate with OEM/Original Service Provider details such as name, designation, addre ss, e-mail Id and Phone No. required to be furnished along with the bid. 8.Scope of supply (Bid price to include all cost components) : Supply Installation Testing Commissioning of Goods and Training of operators and providing Statutory Clearances required (if any). For Required materi alInformation Seller is Advised to visit the buyers premises. its not mendatory but its advisable for quotatin g the price. 9.Successful Bidder can submit the Performance Security in the form of Fixed Deposit Receipt also (beside s PBG which is allowed as per GeM GTC). FDR should be made out or pledged in the name of MEMBER SEC RETARY , IMC SOCIETY OF ITI Dantiwada A/C (Name of the Seller). The bank should certify on it that the de posit can be withdrawn only on the demand or with the sanction of the pledgee. For release of Security De posit, the FDR will be released in favour of bidder by the Buyer after making endorsement on the back of t he FDR duly signed and stamped along with covering letter. Successful Bidder has to upload scanned c op y of the FDR document in place of PBG and has to ensure delivery of hard copy of Original FDR to the Bu ye r within 15 days of award of contract. 10.Warranty :- Successful bidder will have to ensure that adequate number of dedicated technical service personals / eng ineers are designated / deployed for attending to the Service Request in a time bound man ner and for ens uring Timely Servicing / rectification of defects during warranty period, as per Service level agreement indicated in the relevant clause of the bid. Timely Servicing / rectification of defects during warr anty period: After having been notified of the defects / service requirement during warranty period, Seller has to complete the required Service / Rectification wit hin 15 days time limit. If the Seller fails to complet e service / rectification with defined time limit, a penalty of 0.5% of Unit Price of the product shall be charg ed as penalty for each week of delay from the seller. Sell er can deposit the penalty with the Buyer directly else the Buyer shall have a right to recover all such penalty amount from the Performance Security (PBG). Cumulative Penalty cannot exceed more than 10% of the total contract value after which the Buyer shall h ave the right to get the service / rectification done from al ternate sources at the risk and cost of the Seller besides forfeiture of PBG. Seller shall be liable to re-imberse the cost of such service / rectification to the b uyer available to Buyer, Buyer may terminate the Contract or any part thereof by a written notice to the S eller,if :

  • i)The Seller fails to comply with any material term of the Contract. ii) The Seller informs Buyer of its inability to deliver the Material(s) or any part there of within the stipulate d Delivery Period or such inability otherwise becomes apparent. iii) The Seller fails to deliver the Material(s) or any part thereof within the stipulated Delivery Period and/or to replace/rectify any rejected or defective Material(s) promptly. iv) The Seller becomes bankrupt or goes into liquidation
  • v)The Seller makes a general assignment for the benefit of creditors. vi) A receiver is appointed for any substantial property owned by the Seller. vii) The Seller has misrepresented to Buyer, acting on which mis representation Buyer has placed the Purc hase Order on the Seller. 12.While generating invoice in GeM portal, the seller must upload scanned copy of GST invoice and the scr eenshot of GST portal confirming payment of GST. ** The bidder firm must not have been blacklisted by any State/Central Government or any Government or ganization. A declaration to this effect must be submitted on a notarized stamp paper of .300. ** The bidder must have a valid GST registration certificate and submit a copy of the same. **Bidder must have one office in Gujarat. Please upload the copy of any one of the following: Property tax bill/Electricity Bill/Telephone Bill/GST Registration/Lease agreement etc.. Trader/ Reseller of any product sh all not be eligible to get benefits as startup. And EMD Exemption. and also Startup Will get Benefits of Star tup only when they have Total annual production shall be twice the bid quantity. and Having NSIC/CSPO+ MSE certificate * Note : The Bidder has to upload Check list duly signed and stamp sample given in Buyer uploaded ATC d ocument) with necessary details and submit documents in relevant window on GeM as per check list. FOR GETTING MSE/MII PURCHASE PREFERENCE BIDDER MUST ELIGIBLE AS PER GUJARAT STATE PURCHASE POL ICY. * This bid will be governed as per "Gujarat State Procurement Policy 2024" published by Industries and Mi nes Department, Gujarat. * Bidders are advised to check clauses of Gujarat State Procurement Policy 2024 (like EMD Exemption, Stat -up related,Security deposite, turnover, Purchase Preference etc...) before participation. * In case of any conflict in the terms and conditions given in this bid in ATC, the Gujarat State Procurement Policy 2024 provisions shall prevail. However, if there is such an ATC which has no counterpart in the said policy, then the ATC shall prevail. * Warranty period of the supplied products shall be years (mentioned in specification) from the date of fina l acceptance of goods or after completion of installation, commissioning & testing of goods (if included in t he scope of supply), at consignee location. OEM Warranty certificates must be submitted by Successful Bi dder at the time of delivery of Goods. The seller should guarantee the rectification of goods in case of any break down during the guarantee period. Seller should have well established Installation, Commissioning, Training, Troubleshooting and Maintenance Service group in INDIA for attending the after sales service. De ta ils of Service Centres near consignee destinations are to be uploaded along with the bid. * Turnover of the bidder :- The minimum average annual financial turnover or actual production of the bidd er/ during the last three years, ending on 31st March of the previous financial year, should be at least twic e the bid value. (Bid Estimated value mentioned in bid document) Documentary evidence in the form of ce rtified Audited Balance She ets of relevant periods or a certificate from the Chartered Accountant/ Cost Acc ountant indicating the finan cial turnover or actual production details for the relevant period shall be uploa ded with the bid. In case the date of constitution / incorporation of the bidder is less than 3 year old, the av erage financial turnover or actual production in respect of the completed financial years after the date of c onstitution shall be taken in to account for this criteria. * The warranty provided by the bidder must be on site at consignee place. Seller is liable for All Required C omponent for Successfull Installtion and Working of Item. without providing the completion certificate to b uyer And NOC For Payment Release.no payment will be made to bidder and no Interest will be paid for late payment. .
03

Buyer Added Bid Specific ATC

View PDF · p. 9

Buyer uploaded ATC document Click here to view the file.

From the reverse auction

Reverse auction — offer validity

View PDF · p. 1

Participation by the bidder in RA process would be considered as their consent for extension in offer validity by 30 days by the date of RA initiation.

Similar open tenders

Soonest first

Search similar in the explorerFind this tender in the explorer

Open on GeM