SUPPLY OF ANIMAL TRANSPORT SHELTER
***********South West delhi
GeM masks the full address in this document.- Delivery
- 120 days
Specifications & requirements · 1
- DrawingDocument1
- View
Indian Army
Ministry of Defence › Department of Military Affairs
Delivers to
South West Delhi, Delhi
Ministry of Defence published this goods tender on GeM on 10 Oct 2026, for South West Delhi, Delhi. The EMD is ₹90,000. It closes on 12 Oct 2026, 4:00 pm IST. Bid number GEM/2026/R/749591.
From the bid document
Parent bid GEM/2026/B/7968959Bid document
This reverse auction is the price round of bid GEM/2026/B/7968959. GeM's auction document lists only the auction, so the items, delivery, eligibility and buyer terms below come from the bid document and are marked From the bid document.
From the bid document
1 item · Address masked by GeM
***********South West delhi
GeM masks the full address in this document.No matching items. Try another name, code or schedule.
Bid files and supporting documents, linked directly from GeM.
Auction dates, extension rule and offer validity
Items, delivery, eligibility and buyer terms: the auction runs on these
Applies to item 1 · From the bid document
Applies to item 1 · From the bid document
From the bid document
From the reverse auction
From the bid document
From the bid document
From the bid and reverse-auction documents
Experience
3 years
Min. turnover
₹15 L
a year, 3-year average
OEM turnover
₹20 L
Past performance
30%
of the bid quantity
Exemptions depend on the evidence and conditions specified in the bid.
From the bid document
Check each criterion against the tender notice before you bid.
From the bid document
If any seller submits the offer price during last 15 minutes of RA end time, then RA will be automatically extended for next 15 minutes from the last participation time. There is no limit on such RA extension cycle.
Buyer-added conditions from the bid and the reverse-auction documents.
From the bid document
After award of contract – Successful Bidder shall have to get Detailed Design Drawings approved from buyer before starting fabrication. Successful Bidder shall submit Detailed Design Drawings for Buyer's approval, within 5 days of award of contract. Buyer shall, either approve the drawings or will provide complete list of modification required in the drawings within 10 days. Seller shall be required to ensure supply as per approved Drawings with modifications as communicated by Buyer. If there is delay from buyer side in approval of drawing– the delivery period shall be refixed without LD for the period of delay in approval of Drawing.
Bidder financial standing: The bidder should not be under liquidation, court receivership or similar proceedings, should not be bankrupt. Bidder to upload undertaking to this effect with bid.
Bidders are advised to check applicable GST on their own before quoting. Buyer will not take any responsibility in this regards. GST reimbursement will be as per actuals or as per applicable rates (whichever is lower), subject to the maximum of quoted GST %.
Bidder shall submit the following documents along with their bid for Vendor Code Creation:
Data Sheet of the product(s) offered in the bid, are to be uploaded along with the bid documents. Buyers can match and verify the Data Sheet with the product specifications offered. In case of any unexplained mismatch of technical parameters, the bid is liable for rejection.
End User Certificate: Wherever Bidders are insisting for End User Certificate from the Buyer, same shall be provided in Buyer’s standard format only.
Experience Criteria: The Bidder or its OEM {themselves or through reseller(s)} should have regularly, manufactured and supplied same or similar Category Products to any Central / State Govt Organization / PSU for 3 years before the bid opening date. Copies of relevant contracts to be submitted along with bid in support of having supplied some quantity during each of the year. In case of bunch bids, the primary product having highest value should meet this criterion.
Malicious Code Certificate: The seller should upload following certificate in the bid:-
Manufacturer Authorization:Wherever Authorised Distributors/service providers are submitting the bid, Authorisation Form /Certificate with OEM/Original Service Provider details such as name, designation, address, e-mail Id and Phone No. required to be furnished along with the bid
NON DISCLOSURE DECLARATION CERTIFICATE (On Bidder Letter Head) to be uploaded with bid:
OPTION CLAUSE: The Purchaser reserves the right to increase or decrease the quantity to be ordered up to 50 percent of bid quantity at the time of placement of contract. The purchaser also reserves the right to increase the ordered quantity up to 50% of the contracted quantity during the currency of the contract at the contracted rates. The delivery period of quantity shall commence from the last date of original delivery order and in cases where option clause is exercised during the extended delivery period the additional time shall commence from the last date of extended delivery period. The additional delivery time shall be (Increased quantity ÷ Original quantity) × Original delivery period (in days), subject to minimum of 30 days. If the original delivery period is less than 30 days, the additional time equals the original delivery period. The Purchaser may extend this calculated delivery duration up to the original delivery period while exercising the option clause. Bidders must comply with these terms.
The successful bidder has to supply all essential accessories required for the successful installation and commissioning of the goods supplied. Besides standard accessories as per normal industry practice, following accessories must be part of supply and cost should be included in bid price: yes .
Without prejudice to Buyer’s right to price adjustment by way of discount or any other right or remedy available to Buyer, Buyer may terminate the Contract or any part thereof by a written notice to the Seller, if:
While generating invoice in GeM portal, the seller must upload scanned copy of GST invoice and the screenshot of GST portal confirming payment of GST.
Nominated Inspection Agency: On behalf of the Buyer organization, any one of the following Inspection Agency would be conducting inspection of stores before acceptance: Pre-dispatch Inspection at Seller Premises (applicable only if pre-dispatch inspection clause has been selected in ATC): Board Of officer Post Receipt Inspection at consignee site before acceptance of stores: Board Of officer
Testing of Sample: The testing of advance sample and bulk sample during PDI will be carried at the designated AHSP labs.When testing facilities are not available, the facilities of Govt labs/NABL/Accredited labs will be utilized. The testing charges outside the designated AHSP labs to be borne by seller's.
Bidders can also submit the EMD with Banker’s Cheque in favour of COMMANDING OFFICER payable at 20 ENGINEER REGIMENT . Bidder has to upload scanned copy / proof of the BC along with bid and has to ensure delivery of hardcopy to the Buyer within 5 days of Bid End date / Bid Opening date.
Bidders can also submit the EMD with Payment online through RTGS / internet banking in Beneficiary name SUPPLY SERVICE IMPREST ACCOUNT Account No. 38972677848 IFSC Code SBIN0062235 Bank Name STATE BANK OF INDIA Branch address TAURAS STATION CANTEEN DELHI CANTT . Bidder to indicate bid number and name of bidding entity in the transaction details field at the time of on- line transfer. Bidder has to upload scanned copy / proof of the Online Payment Transfer along with bid.
Successful Bidder can submit the Performance Security in the form of Account Payee Demand Draft also (besides PBG which is allowed as per GeM GTC). DD should be made in favour of COMMANDING OFFICER payable at 20 ENGINEER REGIMENT . After award of contract, Successful Bidder can upload scanned copy of the DD in place of PBG and has to ensure delivery of hard copy to the original DD to the Buyer within 15 days of award of contract.
Bidder's offer is liable to be rejected if they don't upload any of the certificates / documents sought in the Bid document, ATC and Corrigendum if any.
ISO 9001: The bidder or the OEM of the offered products must have ISO 9001 certification.
Material Test Certificate Should Be Sent Along with The Supply. The Material Will Be Checked by Buyer’s Lab & the Results of the Lab will be the Sole Criteria for Acceptance of the Item.
Buyer uploaded ATC document Click here to view the file.
Availability of Service Centres: Bidder/OEM must have a Functional Service Centre in the State of each Consignee's Location in case of carry-in warranty. (Not applicable in case of goods having on-site warranty). If service center is not already there at the time of bidding, successful bidder / OEM shall have to establish one within 30 days of award of contract. Payment shall be released only after submission of documentary evidence of having Functional Service Centre.
Warranty period of the supplied products shall be 2 years from the date of final acceptance of goods or after completion of installation, commissioning & testing of goods (if included in the scope of supply), at consignee location. OEM Warranty certificates must be submitted by Successful Bidder at the time of delivery of Goods. The seller should guarantee the rectification of goods in case of any break down during the guarantee period. Seller should have well established Installation, Commissioning, Training, Troubleshooting and Maintenance Service group in INDIA for attending the after sales service. Details of Service Centres near consignee destinations are to be uploaded along with the bid.
Timely Servicing / rectification of defects during warranty period: After having been notified of the defects / service requirement during warranty period, Seller has to complete the required Service / Rectification within 7 days time limit. If the Seller fails to complete service / rectification with defined time limit, a penalty of 0.5% of Unit Price of the product shall be charged as penalty for each week of delay from the seller. Seller can deposit the penalty with the Buyer directly else the Buyer shall have a right to recover all such penalty amount from the Performance Security (PBG).Cumulative Penalty cannot exceed more than 10% of the total contract value after which the Buyer shall have the right to get the service / rectification done from alternate sources at the risk and cost of the Seller besides forfeiture of PBG. Seller shall be liable to re-imberse the cost of such service / rectification to the Buyer.
OPTIONAL SITE VISIT:
From the reverse auction
Participation by the bidder in RA process would be considered as their consent for extension in offer validity by 30 days by the date of RA initiation.
Search similar in the explorerFind this tender in the explorer