Design, Supply, Installation, Commissioning And Maintenance Of Grid Connected Roof Top Solar Power Plant Service - Hybrid With Battery Storage; As Per Scope Of Work; As Per Scope Of Work
226008,Uttar Pradesh State Institute of Forensic Sciences Piparsand, Sarojni Nagar, Lucknow
Specifications & requirements · 27
- Type of Solar Power Plant
- Hybrid with battery storage
- Total Shadow Free Roof Top Area available (In Square mts)
- As per Scope of Work
- Number of buildings/roofs available
- As per Scope of Work
- Ownership of the building/roof on which RTS needs to be installed
- Self-owned
- If the building is leased/hired, then what is the duration of the lease
- As per Scope of Work
- Capacity of the solar panel to be installed
- As per Scope of Work
- State/Union Territory where the RTS needs to be installed
- Uttar Pradesh
- Category of customer
- Institutional
- Are the components being used for the solar panel made in India and as per the Approved List of Models and Manufacturers list (ALMM List-I & ALMM List-II)
- Yes
- Number of years beyond 5 years for which maintenance is required
- As per Scope of Work
- Type of Solar Panel to be used
- Polycrystalline
- Is battery backup required
- Yes
- which kind of battery is required
- Lithium Ion
- Battery Capacity (In kWh)
- As per Scope of Work
- backup period of the battery
- As per Scope of Work
- Type of Earthing
- As per Scope of Work
- Scheduling of Weather Forecast
- Yes
- Is site visit available
- Yes
- what is the structure of the roof
- As per Scope of Work
- Is Project Completion Report required
- Yes
- CAMC report cycle
- As per Scope of Work
- The energy generated will be used by
- As per Scope of Work
- Electrical connected load (KW)
- As per Scope of Work
- Net Metering Required
- No
- Type of Net Meter to be installed
- Not Applicable
- Inverter Wiring Required
- Yes
- Minimum Floor Price defined by Buyer
- No