Micro & small enterprises (MSE)
Complete exemptionExemption conditions
Yes | Complete
View PDF · p. 1Upid Web Portal - Irrigation Department
Irrigation and Flood Control Department Uttar Pradesh › Irrigation And Water Resources Department Mechanical
Delivers to
Lucknow, Mirzapur, Uttar Pradesh
Irrigation and Flood Control Department Uttar Pradesh published this goods tender on GeM on 10 Oct 2026, for Lucknow, Mirzapur, Uttar Pradesh. The EMD is ₹1.8 L. It closes on 12 Oct 2026, 6:00 pm IST. Bid number GEM/2026/R/749733.
From the bid document
Parent bid GEM/2026/B/7831617Bid document RA schedules
This reverse auction is the price round of bid GEM/2026/B/7831617. GeM's auction document lists only the auction, so the items, delivery, eligibility and buyer terms below come from the bid document and are marked From the bid document.
From the bid document
8 items · 3 delivery locations · 8 of 8 auction lots matched to items
Delivery location226010,3/435-A Vishwas Khand-3 Gomti Nagar Lucknow- 226010
Delivery location226010,3/435-A Vishwas Khand-3 Gomti Nagar Lucknow- 226010
Delivery location231001,Pathrahiya near Railway Station Mirzapur
Delivery location231001,Pathrahiya near Railway Station Mirzapur
Delivery location242001,Executive Engineer Tubewell Division ,Shahjahanpur
Delivery location226010,3/435-A Vishwas Khand-3 Gomti Nagar Lucknow- 226010
Delivery location226010,3/435-A Vishwas Khand-3 Gomti Nagar Lucknow- 226010
Delivery location242001,Executive Engineer Tubewell Division ,Shahjahanpur
No matching items. Try another name, code or schedule.
Bid files and supporting documents, linked directly from GeM.
Auction dates, extension rule and offer validity
Items, delivery, eligibility and buyer terms: the auction runs on these
Applies to item 1 · From the bid document
Applies to item 2 · From the bid document
Applies to item 3 · From the bid document
Applies to item 4 · From the bid document
Applies to item 5 · From the bid document
Applies to item 6 · From the bid document
Applies to item 7 · From the bid document
Applies to item 8 · From the bid document
From the bid document
From the reverse auction
From the bid document
From the bid and reverse-auction documents
Experience
3 years
Min. turnover
₹80 L
a year, 3-year average
OEM turnover
₹7 Cr
Past performance
50%
of the bid quantity
Yes | Complete
View PDF · p. 1Exemptions depend on the evidence and conditions specified in the bid.
From the bid document
Check each criterion against the tender notice before you bid.
From the bid document
If any seller submits the offer price during last minutes of RA end time, then RA will be automatically extended for next minutes from the last participation time. (A maximum of times)
Buyer-added conditions from the bid and the reverse-auction documents.
From the bid document
OPTION CLAUSE: The Purchaser reserves the right to increase or decrease the quantity to be ordered up to 25 percent of bid quantity at the time of placement of contract. The purchaser also reserves the right to increase the ordered quantity up to 25% of the contracted quantity during the currency of the contract at the contracted rates. The delivery period of quantity shall commence from the last date of original delivery order and in cases where option clause is exercised during the extended delivery period the additional time shall commence from the last date of extended delivery period. The additional delivery time shall be (Increased quantity ÷ Original quantity) × Original delivery period (in days), subject to minimum of 30 days. If the original delivery period is less than 30 days, the additional time equals the original delivery period. The Purchaser may extend this calculated delivery duration up to the original delivery period while exercising the option clause. Bidders must comply with these terms.
Buyer Added text based ATC clauses 7.0 ELIGIBILITY CRITERIA- 7.1 DETAILS OF SUPPLIES MADE TO GOVT. DEPARTMENT / GOVT. UNDERTAKING The bidder shall submit statement containing details of manufactured and supplied, minim um 50 % (In case of fraction round off up to next whole number) of tendered quantity HSC Centrif gal Pumps [for which the bidder is intending to submit their offer] having discharge capacity of P umps (as tendered) or more to Government Departments/ Undertakings/PSUs directly or hrough their Authorized Representatives/Dealer up-to 31.03.2023 in the format annexed as “Section III(D)- Purchase Orders Details -Annexure-A1” herewith. To meet this requirement, the bidders shall submit copies of supply orders/invoices as a proof of supplies actually made. However, this condition shall not be applicable to those dders who have already supplied same to Irrigation Department U.P., but they are required to furnish the details as required under this clause. If firm has supplied lesser number of p mps to Irrigation Department U.P. firm would have to submit the supply order / invoices fo rest quantity. 7.2 PERFORMANCE CERTIFICATES IN RESPECT OF SUPPLIES REFERRED ABOVE The bidder shall submit performance certificates corresponding to the same supplies men oned in "Supply Order Statement Annexure-A1" of satisfactory performance for a minimum period of 30 months related to the supplies executed. Performance Certificate must be iss ed in the name of Original Equipment Manufacturer (OEM) even though supply is m ade through their Authorized Representatives/Dealer. The bidders shall submit det ils of Performance Certificates in the format annexed as “Performance Certificate Stateme t Annexure-A2” herewith. NOTE:- The above conditions 7.2 shall not be applicable to the bidders, who have supplied the Horizontal plit Casing Centrifugal Pumps of discharge Capacity as mentioned in 7.1 to Irrigation Department, .P. but they are required to submit invariably the details of supplies made to Irrigation Depart ment, U.P. in Supply Order Statement, Annexure A1. The performance in such case shall be evaluated on the basis of their past supplies at the departmental level, in case performanc of their past supplies is found unsatisfactory or unwanting, their Technical Part shall prima y be rejected on this ground alone and no further evaluation of Technical Part shall be don Such bidder may also please note that their consideration in earlier tender shall not be a b sis of their claim for consideration in the ensuing tender. If firm has supplied lesser numbe of pumps, as required, to the Irrigation Department U.P., firm would have to submit the pe ormance certificates of rest quantities of orders as mentioned in Annexure-A1. 7.3 DETAILS REGARDING INFRASTRUCTURE FACILITIES
Buyer uploaded ATC document Click here to view the file.
From the reverse auction
Participation by the bidder in RA process would be considered as their consent for extension in offer validity by 30 days by the date of RA initiation.
Search similar in the explorerFind this tender in the explorer