Supply And Construction Of Under Ground FDC With RCC Structure
- Delivery
- 45 days
Indian Army
Ministry of Defence › Department of Military Affairs
Delivers to
Chamoli, Uttarakhand
Ministry of Defence published this goods tender on GeM on 10 Oct 2026, for Chamoli, Uttarakhand. The EMD is ₹6 L. It closes on 12 Oct 2026, 8:00 pm IST. Bid number GEM/2026/R/749901.
From the bid document
Parent bid GEM/2026/B/8032847Bid document
This reverse auction is the price round of bid GEM/2026/B/8032847. GeM's auction document lists only the auction, so the items, delivery, eligibility and buyer terms below come from the bid document and are marked From the bid document.
From the bid document
5 items · Address masked by GeM
***********Chamoli
GeM masks the full address in this document.No matching items. Try another name, code or schedule.
Bid files and supporting documents, linked directly from GeM.
Auction dates, extension rule and offer validity
Items, delivery, eligibility and buyer terms: the auction runs on these
Applies to items 1, 2, 3, 4, 5 · From the bid document
Applies to items 1, 2, 3, 4, 5 · From the bid document
From the bid document
From the reverse auction
From the bid document
From the bid document
From the bid and reverse-auction documents
Experience
3 years
Min. turnover
₹1 Cr
a year, 3-year average
OEM turnover
₹2 Cr
Past performance
70%
of the bid quantity
Yes | Complete
View PDF · p. 1Yes | Complete
View PDF · p. 1Exemptions depend on the evidence and conditions specified in the bid.
From the bid document
Check each criterion against the tender notice before you bid.
From the bid document
If any seller submits the offer price during last 15 minutes of RA end time, then RA will be automatically extended for next 15 minutes from the last participation time. There is no limit on such RA extension cycle.
Buyer-added conditions from the bid and the reverse-auction documents.
From the bid document
Bidder financial standing: The bidder should not be under liquidation, court receivership or similar proceedings, should not be bankrupt. Bidder to upload undertaking to this effect with bid.
Bidder shall submit the following documents along with their bid for Vendor Code Creation:
Experience Criteria: The Bidder or its OEM {themselves or through reseller(s)} should have regularly, manufactured and supplied same or similar Category Products to any Central / State Govt Organization / PSU for 3 years before the bid opening date. Copies of relevant contracts to be submitted along with bid in support of having supplied some quantity during each of the year. In case of bunch bids, the primary product having highest value should meet this criterion.
Installation, Commissioning, Testing, Configuration, Training (if any - which ever is applicable as per scope of supply) is to be carried out by OEM / OEM Certified resource or OEM authorised Reseller.
NON DISCLOSURE DECLARATION CERTIFICATE (On Bidder Letter Head) to be uploaded with bid:
OPTION CLAUSE: The Purchaser reserves the right to increase or decrease the quantity to be ordered up to 50 percent of bid quantity at the time of placement of contract. The purchaser also reserves the right to increase the ordered quantity up to 50% of the contracted quantity during the currency of the contract at the contracted rates. The delivery period of quantity shall commence from the last date of original delivery order and in cases where option clause is exercised during the extended delivery period the additional time shall commence from the last date of extended delivery period. The additional delivery time shall be (Increased quantity ÷ Original quantity) × Original delivery period (in days), subject to minimum of 30 days. If the original delivery period is less than 30 days, the additional time equals the original delivery period. The Purchaser may extend this calculated delivery duration up to the original delivery period while exercising the option clause. Bidders must comply with these terms.
Supplier shall ensure that the Invoice is raised in the name of Consignee with GSTIN of Consignee only.
Without prejudice to Buyer’s right to price adjustment by way of discount or any other right or remedy available to Buyer, Buyer may terminate the Contract or any part thereof by a written notice to the Seller, if:
The seller is required to print logo as per buyer's requirement.
The successful bidder has to supply all essential accessories required for the successful installation and commissioning of the goods supplied. Besides standard accessories as per normal industry practice, following accessories must be part of supply and cost should be included in bid price: As Per Technical Specification and Drawing .
The Buyer has an existing set up / inventory of similar products. The offered / supplied product must be compatible with existing system. The bidder has to ensure Compatibility of the supplied items or shall have to include in the supply the necessary hardware / software to make them compatible at no extra cost to the buyer. The details of items with which compatibility is required are as under: As Per Technical Specification and Drawing
While generating invoice in GeM portal, the seller must upload scanned copy of GST invoice and the screenshot of GST portal confirming payment of GST.
Scope of supply (Bid price to include all cost components) : Only supply of Goods
Availability of Service Centres: Bidder/OEM must have a Functional Service Centre in the State of each Consignee's Location in case of carry-in warranty. (Not applicable in case of goods having on-site warranty). If service center is not already there at the time of bidding, successful bidder / OEM shall have to establish one within 30 days of award of contract. Payment shall be released only after submission of documentary evidence of having Functional Service Centre.
Dedicated /toll Free Telephone No. for Service Support : BIDDER/OEM must have Dedicated/toll Free Telephone No. for Service Support.
Escalation Matrix For Service Support : Bidder/OEM must provide Escalation Matrix of Telephone Numbers for Service Support.
Bidder's offer is liable to be rejected if they don't upload any of the certificates / documents sought in the Bid document, ATC and Corrigendum if any.
ISO 9001: The bidder or the OEM of the offered products must have ISO 9001 certification.
Material Test Certificate Should Be Sent Along with The Supply. The Material Will Be Checked by Buyer’s Lab & the Results of the Lab will be the Sole Criteria for Acceptance of the Item.
The bidder is required to upload, along with the bid, all relevant certificates such as BIS licence, type test certificate, approval certificates and other certificates as prescribed in the Product Specification given in the bid document.
To be eligible for award of contract, Bidder / OEM must possess following Certificates / Test Reports on the date of bid opening (to be uploaded with bid): As Per Technical Specification and Drawing .
Successful bidder will have to ensure that adequate number of dedicated technical service personals / engineers are designated / deployed for attending to the Service Request in a time bound manner and for ensuring Timely Servicing / rectification of defects during warranty period, as per Service level agreement indicated in the relevant clause of the bid.
Timely Servicing / rectification of defects during warranty period: After having been notified of the defects / service requirement during warranty period, Seller has to complete the required Service / Rectification within 7 days time limit. If the Seller fails to complete service / rectification with defined time limit, a penalty of 0.5% of Unit Price of the product shall be charged as penalty for each week of delay from the seller. Seller can deposit the penalty with the Buyer directly else the Buyer shall have a right to recover all such penalty amount from the Performance Security (PBG).Cumulative Penalty cannot exceed more than 10% of the total contract value after which the Buyer shall have the right to get the service / rectification done from alternate sources at the risk and cost of the Seller besides forfeiture of PBG. Seller shall be liable to re-imberse the cost of such service / rectification to the Buyer.
Bidders can also submit the EMD with Account Payee Demand Draft in favour of Official Address payable at SBI . Bidder has to upload scanned copy / proof of the DD along with bid and has to ensure delivery of hardcopy to the Buyer within 5 days of Bid End date / Bid Opening date.
Bidders can also submit the EMD with Fixed Deposit Receipt made out or pledged in the name of A/C Official Address . The bank should certify on it that the deposit can be withdrawn only on the demand or with the sanction of the pledgee. For release of EMD, the FDR will be released in the favour of the bidder by the Buyer after making endorsement on the back of the FDR duly signed and stamped along with covering letter. Bidder has to upload scanned copy/ proof of the FDR along with bid and has to ensure delivery of hardcopy to the Buyer within 5 days of Bid End date/ Bid Opening date
NET WORTH: Net Worth of the OEM should be positive as per the last audited financial statement.
Buyer uploaded ATC document Click here to view the file.
From the reverse auction
Participation by the bidder in RA process would be considered as their consent for extension in offer validity by 30 days by the date of RA initiation.
Search similar in the explorerFind this tender in the explorer