Testing Service For On-Board /Commissioned Equipment/ Instrument Related To Plant - WT-5175G Job Work Of Phased Array Ultrasonic Testing PAUT In All Four Units At UTPS During AOH-COH R&M And As And When Required By GSECL UTPS Metallurgy; As Per Sche..
394680,GSECL UKAI TPS, UKAI DAM, DIST: TAPI
Specifications & requirements · 7
- Type of tests required
- WT-5175G Job work of Phased array Ultrasonic testing PAUT in all four Units at UTPS during AOH-COH R&M and as and when required by GSECL UTPS Metallurgy
- Details of tests required
- As per Schedule B and scope of work mentioned in ATC
- Eligible Testing Lab
- As Per ATC
- Testing location
- Premise (onsite)
- Time within which samples/instruments need to be tested once provided by buyer
- As Per ATC
- Reports required
- As Per ATC
- Minimum Floor Price defined by Buyer
- No