Composite Multi Layer Pipe With Aluminium Core Size Inner Dia 25mm And Outer Dia 32mm, GI Pipe 100mm Dia 3m Long, GI Tank Nipple 25mm 6 Inch Check Nut And Washer, PPR Elbow 32mm, PPR Socket 32mm, PPR…
Indian Army
Ministry of Defence › Department of Military Affairs
Delivers to
Baramulla, Jammu and Kashmir
Overview
11 facts from the tenderMinistry of Defence published this goods tender on GeM on 13 Oct 2026, for Baramulla, Jammu and Kashmir. The estimated value is ₹49.1 L and the EMD is ₹2.5 L. It closes on 14 Oct 2026, 3:00 pm IST. Bid number GEM/2026/R/751088.
From the bid document
TimelineBid → reverse auction
- Bid published17 Sep 2026
- Bid closed28 Sep 2026 · 5:00 pm
- RA issued12 Oct 2026
- RA startsin 6h 10m13 Oct 2026 · 3:00 pm
- RA ends14 Oct 2026 · 3:00 pm
Parent bid GEM/2026/B/8049691Bid document
Bidding
- Bid type
- Reverse auction
- Evaluation method
- Total value wise evaluation
- Packet type
- Two Packet Bid
- Reverse auction
- Yes, 50% Lowest Priced Technically Qualified Bidders
- Auction for bid
- GEM/2026/B/8049691
- Total quantity
- 25,484
Buyer
- Created by
- Amit@14
- Location
- Baramulla · Jammu and Kashmir
- Portal
- GeM
Important dates
- Published
- 13 Oct 2026, 3:00 pm IST
- Closes
- 14 Oct 2026, 3:00 pm IST
Bid & reverse auction
This reverse auction is the price round of bid GEM/2026/B/8049691. GeM's auction document lists only the auction, so the items, delivery, eligibility and buyer terms below come from the bid document and are marked From the bid document.
Items & delivery
From the bid document
63 items · Address masked by GeM
***********Baramulla
GeM masks the full address in this document.01Composite Multi Layer Pipe With Aluminium Core Size Inner Dia 25mm And Outer Dia 32mmQuantity5,100Delivery60 daysDetailsClose
- Delivery
- 60 days
02GI Pipe 100mm Dia 3m LongQuantity4Delivery60 daysDetailsClose
- Delivery
- 60 days
03GI Tank Nipple 25mm 6 Inch Check Nut And WasherQuantity32Delivery60 daysDetailsClose
- Delivery
- 60 days
04PPR Elbow 32mmQuantity86Delivery60 daysDetailsClose
- Delivery
- 60 days
05PPR Socket 32mmQuantity86Delivery60 daysDetailsClose
- Delivery
- 60 days
06PPR Equal Union Inner Dia 25mm And Outer Dia 32mmQuantity86Delivery60 daysDetailsClose
- Delivery
- 60 days
07PPR End Cap 32mm Dia Suitable For 32mm Outer Dia PipeQuantity86Delivery60 daysDetailsClose
- Delivery
- 60 days
08PPR Connector 32mm Dia Suitable For 25mm Outer Dia PipeQuantity86Delivery60 daysDetailsClose
- Delivery
- 60 days
09PPR Tee 32mm Dia Suitable For 32mm Outer Dia PipeQuantity86Delivery60 daysDetailsClose
- Delivery
- 60 days
10PPR Reducer 32mm Dia Suitable For 32mm Outer Dia PipeQuantity86Delivery60 daysDetailsClose
- Delivery
- 60 days
11GI Nipple 25mm 3 Inch LongQuantity86Delivery60 daysDetailsClose
- Delivery
- 60 days
12M Seal 100 Gm Each Pkt CompleteQuantity86Delivery60 daysDetailsClose
- Delivery
- 60 days
13Cotton Thread 100m Long CompleteQuantity86Delivery60 daysDetailsClose
- Delivery
- 60 days
14Bib Cock Brass 15mmQuantity40Delivery60 daysDetailsClose
- Delivery
- 60 days
15GI Nipple 25mm 4 Icnh LongQuantity49Delivery60 daysDetailsClose
- Delivery
- 60 days
16GI Nipple 25mm 6 Inch LongQuantity86Delivery60 daysDetailsClose
- Delivery
- 60 days
17GI Equal Union Inner Dia 25mm And Outer Dia 32mmQuantity49Delivery60 daysDetailsClose
- Delivery
- 60 days
18GI Tee 25mmQuantity49Delivery60 daysDetailsClose
- Delivery
- 60 days
19GI Tee 15mm ConfirmingQuantity49Delivery60 daysDetailsClose
- Delivery
- 60 days
20GI Socket 25mmQuantity49Delivery60 daysDetailsClose
- Delivery
- 60 days
21Gate Valve Brass Gun Metal 25mm DiaQuantity49Delivery60 daysDetailsClose
- Delivery
- 60 days
22GI Pipe 15 Mm Dia Med GradeQuantity49Delivery60 daysDetailsClose
- Delivery
- 60 days
23GI Pipe 20 Mm Dia Med GradeQuantity49Delivery60 daysDetailsClose
- Delivery
- 60 days
24GI Reducer 25mm To 15mmQuantity74Delivery60 daysDetailsClose
- Delivery
- 60 days
25GI Elbow 25mmQuantity74Delivery60 daysDetailsClose
- Delivery
- 60 days
26GI Elbow 15mmQuantity74Delivery60 daysDetailsClose
- Delivery
- 60 days
27GI Nipple 15mm 4 Inch LongQuantity67Delivery60 daysDetailsClose
- Delivery
- 60 days
28GI Nipple 15mm 6inch LongQuantity67Delivery60 daysDetailsClose
- Delivery
- 60 days
29GI Socket 15mmQuantity74Delivery60 daysDetailsClose
- Delivery
- 60 days
30GI Union 15mmQuantity74Delivery60 daysDetailsClose
- Delivery
- 60 days
31GI Union 25mmQuantity74Delivery60 daysDetailsClose
- Delivery
- 60 days
32GI Plug 25mmQuantity74Delivery60 daysDetailsClose
- Delivery
- 60 days
33GI Plug 15mmQuantity49Delivery60 daysDetailsClose
- Delivery
- 60 days
34TMT Anchor Pins To Secure CML Pipe At 10m DistanceQuantity539Delivery60 daysDetailsClose
- Delivery
- 60 days
35Triplex Plunger Pump Of 5 HP 450 RPM Coupled With 10 HP Diesel Engine 1500 RPMQuantity4Delivery60 daysDetailsClose
- Delivery
- 60 days
36Triplex Plunger Pump Of 7.5 HP 550 RPMQuantity2Delivery60 daysDetailsClose
- Delivery
- 60 days
37Pre Fabricated Pump Shed Of Size 2.4M X 2.4M And Height 1.8MQuantity6Delivery60 daysDetailsClose
- Delivery
- 60 days
38Rotational Moulded Polyethylene Water Storage Tank Double Layer 5000 Ltr CapacityQuantity20Delivery60 daysDetailsClose
- Delivery
- 60 days
39Quick Setting CompoundQuantity351Delivery60 daysDetailsClose
- Delivery
- 60 days
40Natural SandQuantity35Delivery60 daysDetailsClose
- Delivery
- 60 days
41Aggregate 20mmQuantity23Delivery60 daysDetailsClose
- Delivery
- 60 days
42Aggregate 40mmQuantity22Delivery60 daysDetailsClose
- Delivery
- 60 days
43Common Burnt Clay Building Bricks Size 230x115x75mmQuantity16,284Delivery60 daysDetailsClose
- Delivery
- 60 days
44HDPE Sand Bag Laminated Off Size 75x40cmQuantity800Delivery60 daysDetailsClose
- Delivery
- 60 days
45Aggregate 63mmQuantity57Delivery60 daysDetailsClose
- Delivery
- 60 days
4616 Inch 400mm Diameter Mortar Pan Tasla Weight Of The Finished Unit 1.50 KgQuantity8Delivery60 daysDetailsClose
- Delivery
- 60 days
47BrickTrowel Size 305 Mm High Quality Dropforged Carbon Steel BladeQuantity8Delivery60 daysDetailsClose
- Delivery
- 60 days
48Plaster TrowelQuantity4Delivery60 daysDetailsClose
- Delivery
- 60 days
49Shovel Square Wood HandleQuantity4Delivery60 daysDetailsClose
- Delivery
- 60 days
50Drop Forged High Grade Carbon Steel Brick Hammer 1.2 Kg Wood HandleQuantity4Delivery60 daysDetailsClose
- Delivery
- 60 days
51Non Slip Heavy Duty Industrial Rubber GlovesQuantity24Delivery60 daysDetailsClose
- Delivery
- 60 days
52Adjustable Spanner 12 InchQuantity8Delivery60 daysDetailsClose
- Delivery
- 60 days
53Hacksaw Frame With 2 BladeQuantity8Delivery60 daysDetailsClose
- Delivery
- 60 days
54Single Piece Hot Forged Carbon Steel Powrah Weight Of The Assembly Must Be 2.00 KgsQuantity8Delivery60 daysDetailsClose
- Delivery
- 60 days
55Pipe Wrench 12 InchQuantity4Delivery60 daysDetailsClose
- Delivery
- 60 days
56Pipe Wrench 18 InchQuantity4Delivery60 daysDetailsClose
- Delivery
- 60 days
57Heavy Duty Crow Bar 5 Feet LengthQuantity4Delivery60 daysDetailsClose
- Delivery
- 60 days
58Aluminium Spirit Levels 12 Inch 300 MmQuantity8Delivery60 daysDetailsClose
- Delivery
- 60 days
59High Tenacity Nylon Monofilament Line 1.2 Mm To 1.5mm DiameterQuantity4Delivery60 daysDetailsClose
- Delivery
- 60 days
60Heavy Duty Metal Hand Rammers For Earth CompactionQuantity4Delivery60 daysDetailsClose
- Delivery
- 60 days
61Spanner Adjustable 18 InchQuantity6Delivery60 daysDetailsClose
- Delivery
- 60 days
62Plumbing Dye Set 25-50 MmQuantity4Delivery60 daysDetailsClose
- Delivery
- 60 days
63Hacksaw Frame Blade Double EndQuantity12Delivery60 daysDetailsClose
- Delivery
- 60 days
No matching items. Try another name, code or schedule.
Tender documents
Bid files and supporting documents, linked directly from GeM.
- Reverse auction documentOpen
Auction dates, extension rule and offer validity
- Bid documentOpen
Items, delivery, eligibility and buyer terms: the auction runs on these
- Specification DocumentOpen
Applies to items 1–63 · From the bid document
- BOQ Detail DocumentOpen
Applies to items 1–63 · From the bid document
- Buyer uploaded ATC documentOpen
From the bid document
Policy & contract references
- General terms and conditionsOpen
From the reverse auction
- General terms and conditionsOpen
From the bid document
Documents you must submit
- Experience Criteria
- Past Performance
- Bidder Turnover
- Certificate (Requested in ATC)
- OEM Authorization Certificate
- OEM Annual Turnover
Eligibility
From the bid and reverse-auction documents
Experience
3 years
Min. turnover
₹24 L
a year, 3-year average
OEM turnover
₹24 L
Past performance
70%
of the bid quantity
Experience & turnover exemptions
Startups
No exemptionExemption conditions
Exemptions depend on the evidence and conditions specified in the bid.
Preferences & relaxations
From the bid document
- EMD exemption: no
- Inspection required: no
Check each criterion against the tender notice before you bid.
Commercial conditions
From the bid document
- EMD
- ₹245,574
- Performance guarantee
- 5% for 14 months
- Offer validity
- 140 days
Reverse auction extension
From the reverse auctionIf any seller submits the offer price during last 30 minutes of RA end time, then RA will be automatically extended for next 30 minutes from the last participation time. There is no limit on such RA extension cycle.
Buyer requirements & conditions
Buyer-added conditions from the bid and the reverse-auction documents.
From the bid document
After award of contract – Successful Bidder shall have to get Detailed Design Drawings approved from buyer before starting fabrication. Successful Bidder shall submit Detailed Design Drawings for Buyer's approval, within 5 days of award of contract. Buyer shall, either approve the drawings or will provide complete list of modification required in the drawings within 5 days. Seller shall be required to ensure supply as per approved Drawings with modifications as communicated by Buyer. If there is delay from buyer side in approval of drawing– the delivery period shall be refixed without LD for the period of delay in approval of Drawing.
Actual delivery (and Installation & Commissioning (if covered in scope of supply)) is to be done at following address AOR 19 INF DIV . . . . .
Bidder financial standing: The bidder should not be under liquidation, court receivership or similar proceedings, should not be bankrupt. Bidder to upload undertaking to this effect with bid.
Bidders shall quote only those products (Part of Service delivery) in the bid which are not obsolete in the market and has at least 3 years residual market life i.e. the offered product shall not be declared end-of- life by the OEM before this period.
Bidders are advised to check applicable GST on their own before quoting. Buyer will not take any responsibility in this regards. GST reimbursement will be as per actuals or as per applicable rates (whichever is lower), subject to the maximum of quoted GST %.
Bidder shall submit the following documents along with their bid for Vendor Code Creation:
- a.Copy of PAN Card.
- b.Copy of GSTIN.
- c.Copy of Cancelled Cheque.
- d.Copy of EFT Mandate duly certified by Bank.
End User Certificate: Wherever Bidders are insisting for End User Certificate from the Buyer, same shall be provided in Buyer’s standard format only.
Experience Criteria: The Bidder or its OEM {themselves or through reseller(s)} should have regularly, manufactured and supplied same or similar Category Products to any Central / State Govt Organization / PSU for 3 years before the bid opening date. Copies of relevant contracts to be submitted along with bid in support of having supplied some quantity during each of the year. In case of bunch bids, the primary product having highest value should meet this criterion.
Manufacturer Authorization:Wherever Authorised Distributors/service providers are submitting the bid, Authorisation Form /Certificate with OEM/Original Service Provider details such as name, designation, address, e-mail Id and Phone No. required to be furnished along with the bid
NON DISCLOSURE DECLARATION CERTIFICATE (On Bidder Letter Head) to be uploaded with bid:
- 1.I M/s. M/s hereby declare that I shall not disclose the contract or any provision, specification, plan, design, pattern, sample or information thereof to any third party during and after expiry of Contract.
- 2.If defying the norms as per the Contract a legal action may be taken against me as per the existing Rules.
OPTION CLAUSE: The Purchaser reserves the right to increase or decrease the quantity to be ordered up to 50 percent of bid quantity at the time of placement of contract. The purchaser also reserves the right to increase the ordered quantity up to 50% of the contracted quantity during the currency of the contract at the contracted rates. The delivery period of quantity shall commence from the last date of original delivery order and in cases where option clause is exercised during the extended delivery period the additional time shall commence from the last date of extended delivery period. The additional delivery time shall be (Increased quantity ÷ Original quantity) × Original delivery period (in days), subject to minimum of 30 days. If the original delivery period is less than 30 days, the additional time equals the original delivery period. The Purchaser may extend this calculated delivery duration up to the original delivery period while exercising the option clause. Bidders must comply with these terms.
Products supplied shall be nontoxic and harmless to health. In the case of toxic materials, Material Safety Data Sheet may be furnished along with the material.
Shelf Life: The Product/Spare parts to be supplied as part of the services must have minimum 10 Shelf Life. On the date of supply, minimum 10 usable shelf life should be available / balance.
- 1.The Seller shall not assign the Contract in whole or part without obtaining the prior written consent of buyer.
- 2.The Seller shall not sub-contract the Contract in whole or part to any entity without obtaining the prior written consent of buyer.
- 3.The Seller shall, notwithstanding the consent and assignment/sub-contract, remain jointly and severally liable and responsible to buyer together with the assignee/ sub-contractor, for and in respect of the due performance of the Contract and the Sellers obligations there under.
While generating invoice in GeM portal, the seller must upload scanned copy of GST invoice and the screenshot of GST portal confirming payment of GST.
IMPORTED PRODUCTS: In case of imported products, OEM or Authorized Seller of OEM should have a registered office in India to provide after sales service support in India. The certificate to this effect should be submitted.
Pre-dispatch inspection at Seller premises (Fee/Charges to be borne by the BUYER): Before dispatch, the goods will be inspected by Buyer / Consignee or their Authorized Representative or by Nominated External Inspection Agency (independently or jointly with Buyer or Consignee as decided by the Buyer) at Seller premises (or at designated place for inspection as declared / communicated by the seller) for their compliance to the contract specifications. Fee/Charges taken by the External inspection Agency and any external laboratories testing charges shall be borne by the Buyer. For in-house testing, the Sellers will provide necessary facilities free of cost. Seller shall notify the Buyer through e-mail about readiness of goods for pre-dispatch inspection and Buyer will notify the Seller about the Authorized Representative/ Nominated External Inspection Agency and the date for testing. The goods would be dispatched to consignee only after clearance in pre-dispatch inspection. Consignee's right of rejection as per GTC in respect of the goods finally received at his location shall in no way be limited or waived by reason of the goods having previously been inspected, tested and passed by Buyer/ Consignee or its Nominated External Inspection Agency prior to the goods' shipment. While bidding, the sellers should take into account 7 days for inspection from the date of email offering the goods for inspection. Any delay in inspection beyond 7 days shall be on the part of the buyer and shall be regularised without Liquidated Damages. When there is requirement of submission the advance sample, the seller shall inform the buyer promptly through emails about the date of submission of sample to the buyer nominated Inspection agency.
Testing of Sample: The testing of advance sample and bulk sample during PDI will be carried at the designated AHSP labs.When testing facilities are not available, the facilities of Govt labs/NABL/Accredited labs will be utilized. The testing charges outside the designated AHSP labs to be borne by seller's.
Bidders can also submit the EMD with Fixed Deposit Receipt made out or pledged in the name of A/C Commanding Officer 14 Engr Regt C/o 56 APO . The bank should certify on it that the deposit can be withdrawn only on the demand or with the sanction of the pledgee. For release of EMD, the FDR will be released in the favour of the bidder by the Buyer after making endorsement on the back of the FDR duly signed and stamped along with covering letter. Bidder has to upload scanned copy/ proof of the FDR along with bid and has to ensure delivery of hardcopy to the Buyer within 5 days of Bid End date/ Bid Opening date
Bidders can also submit the EMD with Banker’s Cheque in favour of Commanding Officer 14 Engr Regt C/o 56 APO payable at Baramulla . Bidder has to upload scanned copy / proof of the BC along with bid and has to ensure delivery of hardcopy to the Buyer within 5 days of Bid End date / Bid Opening date.
Successful Bidder can submit the Performance Security in the form of Account Payee Demand Draft also (besides PBG which is allowed as per GeM GTC). DD should be made in favour of Commanding Officer 14 Engr Regt C/o 56 APO payable at Baramulla . After award of contract, Successful Bidder can upload scanned copy of the DD in place of PBG and has to ensure delivery of hard copy to the original DD to the Buyer within 15 days of award of contract.
NET WORTH: Net Worth of the OEM should be positive as per the last audited financial statement.
Scope of supply (Bid price to include all cost components) : Supply Installation Testing Commissioning of Goods and Training of operators and providing Statutory Clearances required (if any)
- 24.Purchase Preference (Centre) Purchase preference to Micro and Small Enterprises (MSEs): Purchase preference will be given to MSEs as defined in Public Procurement Policy for Micro and Small Enterprises (MSEs) Order, 2012 dated 23.03.2012 issued by Ministry of Micro, Small and Medium Enterprises and its subsequent Orders/Notifications issued by concerned Ministry. If the bidder wants to avail the Purchase preference, the bidder must be the manufacturer of the offered product in case of bid for supply of goods. Traders are excluded from the purview of Public Procurement Policy for Micro and Small Enterprises. In respect of bid for Services, the bidder must be the Service provider of the offered Service. Relevant documentary evidence in this regard shall be uploaded along with the bid in respect of the offered product or service. If L-1 is not an MSE and MSE Seller (s) has/have quoted price within L-1+ 15% of margin of purchase preference /price band defined in relevant policy, such Seller shall be given opportunity to match L-1 price and contract will be awarded for percentage of 30% of total value.
- 25.Purchase Preference (Centre) Procurement under this bid is reserved for purchase from Micro and Small Enterprises whose credentials are validated online through Udyog Aadhaar/URC for that product/service category. If the bidder wants to avail the reservation benefit, the bidder must be the manufacturer of the offered product in case of bid for supply of goods. Traders are excluded from the purview of Public Procurement Policy for Micro and Small Enterprises. In respect of bid for Services, the bidder must be the Service provider of the offered Service. Relevant documentary evidence in this regard shall be uploaded along with the bid in respect of the offered product or service.
Bidder's offer is liable to be rejected if they don't upload any of the certificates / documents sought in the Bid document, ATC and Corrigendum if any.
ISO 9001: The bidder or the OEM of the offered products must have ISO 9001 certification.
Material Test Certificate Should Be Sent Along with The Supply. The Material Will Be Checked by Buyer’s Lab & the Results of the Lab will be the Sole Criteria for Acceptance of the Item.
The bidder is required to upload, along with the bid, all relevant certificates such as BIS licence, type test certificate, approval certificates and other certificates as prescribed in the Product Specification given in the bid document.
- 30.Turnover Bidder Turn Over Criteria: The minimum average annual financial turnover of the bidder during the last three years, ending on 31st March of the previous financial year, should be as indicated in the bid document. Documentary evidence in the form of certified Audited Balance Sheets of relevant periods or a certificate from the Chartered Accountant / Cost Accountant indicating the turnover details for the relevant period shall be uploaded with the bid. In case the date of constitution / incorporation of the bidder is less than 3 year old, the average turnover in respect of the completed financial years after the date of constitution shall be taken into account for this criteria.
- 31.Turnover OEM Turn Over Criteria: The minimum average annual financial turnover of the OEM of the offered product during the last three years, ending on 31st March of the previous financial year, should be as indicated in the bid document. Documentary evidence in the form of certified Audited Balance Sheets of relevant periods or a certificate from the Chartered Accountant / Cost Accountant indicating the turnover details for the relevant period shall be uploaded with the bid. In case the date of constitution / incorporation of the OEM is less than 3 year old, the average turnover in respect of the completed financial years after the date of constitution shall be taken into account for this criteria. In case of bunch bids, the OEM of CATEGORY RELATED TO primary product having highest bid value should meet this criterion.
Availability of Service Centres: Bidder/OEM must have a Functional Service Centre in the State of each Consignee's Location in case of carry-in warranty. (Not applicable in case of goods having on-site warranty). If service center is not already there at the time of bidding, successful bidder / OEM shall have to establish one within 30 days of award of contract. Payment shall be released only after submission of documentary evidence of having Functional Service Centre.
Warranty period of the supplied products shall be 3 years from the date of final acceptance of goods or after completion of installation, commissioning & testing of goods (if included in the scope of supply), at consignee location. OEM Warranty certificates must be submitted by Successful Bidder at the time of delivery of Goods. The seller should guarantee the rectification of goods in case of any break down during the guarantee period. Seller should have well established Installation, Commissioning, Training, Troubleshooting and Maintenance Service group in INDIA for attending the after sales service. Details of Service Centres near consignee destinations are to be uploaded along with the bid.
Timely Servicing / rectification of defects during warranty period: After having been notified of the defects / service requirement during warranty period, Seller has to complete the required Service / Rectification within 15 days time limit. If the Seller fails to complete service / rectification with defined time limit, a penalty of 0.5% of Unit Price of the product shall be charged as penalty for each week of delay from the seller. Seller can deposit the penalty with the Buyer directly else the Buyer shall have a right to recover all such penalty amount from the Performance Security (PBG).Cumulative Penalty cannot exceed more than 10% of the total contract value after which the Buyer shall have the right to get the service / rectification done from alternate sources at the risk and cost of the Seller besides forfeiture of PBG. Seller shall be liable to re-imberse the cost of such service / rectification to the Buyer.
- 35.Past Project Experience Proof for Past Experience and Project Experience clause: For fulfilling the experience criteria any one of the following documents may be considered as valid proof for meeting the experience criteria:a. Contract copy along with Invoice(s) with self-certification by the bidder that service/supplies against the invoices have been executed.b. Execution certificate by client with contract value.c. Any other document in support of contract execution like Third Party Inspection release note, etc.Proof for Past Experience and Project Experience clause: For fulfilling the experience criteria any one of the following documents may be considered as valid proof for meeting the experience criteria:a. Contract copy along with Invoice(s) with self-certification by the bidder that service/supplies against the invoices have been executed.b. Execution certificate by client with contract value.c. Any other document in support of contract execution like Third Party Inspection release note, etc.
- 36.Past Project Experience The Bidder / OEM {themselves or through reseller(s)}, should have executed project for supply and installation / commissioning of same or similar Category Products during preceding 3 financial years (i.e. current year and three previous financial years) as on opening of bid, as per following criteria:
- (i)Single order of at least 35% of estimated bid value; or
- (ii)Two orders of at least 20% each of estimated bid value; or
- (iii)Three orders of at least 15% each of estimated bid value. Satisfactory Performance certificate issued by respective Buyer Organization for the above Orders should be uploaded with bid. In case of bunch bids, the Category related to primary product having highest bid value should meet this criterion
- 37.Ration Item ATCs Inspection and Quality Check of Goods (Analysis, Verdict and appeal) Samples drawn by the inspecting officer at the time of inspection are known as Acceptance samples. Verdict shall be issued by CFL concerned on the basis of analysis of Original Sample. No additional time for tendering of stocks shall be given to the suppliers in case of rejection of stocks by CFL and verdict is issued after DP / Extended DP.
- (a). In the case of rejection of stores by the Inspecting Officer the SELLER will be at liberty to prefer an appeal and forward for examination his sample (Sample No.2) within fourteen days from the date of issue of verdict by CFL concerned rejecting the consignment for test to ST-7/8, DGST, QMG’s Branch, IHQ of MoD (Army), P-11 Havlock Lines, Lucknow Road, Timarpur, Delhi -110054 in duplicate under advice to the BUYER and the Composite Food Laboratory concerned. Failing which, the appeal will not be entertained and the consignment will be deemed to have been rejected finally.
- (b). Appeal sample will be preferred by the vendor at own risk and cost. No additional time will be offered or granted to the vendor to offset delays occurred in normal course for conduct of Appeal Board and no representation on ibid account will be accepted/ considered.
- 38.Ration Item ATCs Packing Material The items will be supplied by the successful bidder in its original packing material and the packing material will not be returned. Weight of packing material will not be included in quantity supplied and only net weight of the items will be counted. The packing should be of standardized weights of appropriate size. Item will not be accepted in non-standardized weights.Packing Material. The items will be supplied by the successful bidder in its original packing material and the packing material will not be returned. Weight of packing material will not be included in quantity supplied and only net weight of the items will be counted. The packing should be of standardized weights of appropriate size. Item will not be accepted in non-standardized weights.
- 39.Ration Item ATCs Pre-Dispatch Inspection The following Pre-dispatch Inspection clause will form part of the contract placed on successful Bidder :-
- (a)The CFL/ its representatives will carry out Pre-Despatch Inspection (PDI) of the stores in order to check their compliance with specifications in accordance with its usual standard procedures. Upon successful completion of such PDI, the Seller and CFL/ its representatives will issue and sign a Certificate of Conformity as per the specimen at Form DPM-21 (Available in MoD website and can be given on request).
- (b)The Seller shall provide all reasonable facilities, access and assistance to the CFL/ its representative for safety and convenience in the performance of their duties.
- (c)After completion of inspection the dispatch will be carried out under the supervision of CFL dispatch team, as per priority given in DI issued by the Directorate General Supplies and Transport, Integrated Headquarters of Ministry of Defence (Army).
- 40.Ration Item ATCs Shelf Life The supplier shall declare the shelf life/best before use for a minimum period equal to the warranty period as given in the DFS for the item. The item should be of the latest manufacture, conforming to the current production standard and having 100% defined life at the time of delivery.
Buyer uploaded ATC document Click here to view the file.
From the reverse auction
Reverse auction — offer validity
View PDF · p. 2Participation by the bidder in RA process would be considered as their consent for extension in offer validity by 30 days by the date of RA initiation.
Similar open tenders
Soonest first- TodayclosesStainless Steel Kitchen Sink With Single Bowl, Hydralic Door Closer, Glass Panes 600x900x…Ministry of Defence · Closes 13 Oct 2026
- TodayclosesPLASTIC BIB TAPS, PILLAR TAPS, ANGLE VALVES & STOP VALVES FOR HOT & COLD WATER SERVICES C…Ministry of Defence · Closes 13 Oct 2026
- 1 dayleftProcurement of Maint StockMinistry of Defence · Closes 14 Oct 2026
- 1 dayleftPROCUREMENT OF MAINTENANCE ITEMSMinistry of Defence · Closes 14 Oct 2026
- 2 daysleftBR MAINT ITEMSMinistry of Defence · Closes 15 Oct 2026
- 4 daysleftGI PIPE AND OTHER FITTINGSMinistry of Defence · Closes 17 Oct 2026
- 7 daysleftProvn of MTA StoresMinistry of Defence · Closes 20 Oct 2026
- 11 daysleftwater supplyMinistry of Defence · Closes 24 Oct 2026
Search similar in the explorerFind this tender in the explorer