Browse all bids
GeMOpenGoodsReverse auctionBOQ

LED Bulb 20W Make Bajaj Or Havells Or Crompton, LED Bulb 15W Make Bajaj Or Havells Or Crompton, LED Bulb 9W Make Bajaj Or Havells Or Crompton, LED Bulb 7W Make Bajaj Or Havells Or Crompton, LED Bulb…

Indian Army

Ministry of Defence › Department of Military Affairs

Delivers to

Udhampur, Jammu and Kashmir

Overview

11 facts from the tender

Ministry of Defence published this goods tender on GeM on 14 Oct 2026, for Udhampur, Jammu and Kashmir. The EMD is ₹2 L. It closes on 15 Oct 2026, 3:00 pm IST. Bid number GEM/2026/R/751936.

From the bid document

TimelineBid → reverse auction

  1. Bid published4 Sep 2026
  2. Bid closed14 Sep 2026 · 12:00 pm
  3. RA issued13 Oct 2026
  4. RA ends15 Oct 2026 · 3:00 pm

Bidding

Bid type
Reverse auction
Evaluation method
Total value wise evaluation
Packet type
Two Packet Bid
Reverse auction
Yes, H1-Highest Priced Bid Elimination
Auction for bid
GEM/2026/B/7996309
Total quantity
8,379

Buyer

Created by
pradnyavk101
Location
Udhampur · Jammu and Kashmir
Portal
GeM

Important dates

Published
14 Oct 2026, 3:00 pm IST
Closes
15 Oct 2026, 3:00 pm IST

Bid & reverse auction

This reverse auction is the price round of bid GEM/2026/B/7996309. GeM's auction document lists only the auction, so the items, delivery, eligibility and buyer terms below come from the bid document and are marked From the bid document.

Bid document (PDF) Reverse auction document (PDF)

Items & delivery

From the bid document

92 items · Address masked by GeM

Delivery location · all items

***********Udhampur

GeM masks the full address in this document.
Showing 92 of 92
01LED Bulb 20W Make Bajaj Or Havells Or CromptonQuantity352Delivery15 daysDetailsClose
Delivery
15 days
02LED Bulb 15W Make Bajaj Or Havells Or CromptonQuantity325Delivery15 daysDetailsClose
Delivery
15 days
03LED Bulb 9W Make Bajaj Or Havells Or CromptonQuantity661Delivery15 daysDetailsClose
Delivery
15 days
04LED Bulb 7W Make Bajaj Or Havells Or CromptonQuantity70Delivery15 daysDetailsClose
Delivery
15 days
05LED Bulb 12W Inverter Based Recharge Make Bajaj Or Havells Or CromptonQuantity83Delivery15 daysDetailsClose
Delivery
15 days
06Bulb LED Rechargeble Make Bajaj Or Havells Or CromptonQuantity45Delivery15 daysDetailsClose
Delivery
15 days
07Fan Capacitor 2.5 MFD Make HavellsQuantity117Delivery15 daysDetailsClose
Delivery
15 days
08Bulk Head Fitting 9W Make Bajaj Or Havells Or CromptonQuantity10Delivery15 daysDetailsClose
Delivery
15 days
09Plug 5 Amp 3 Pin Make Greaves Or Anchor Or L And T Or CGQuantity239Delivery15 daysDetailsClose
Delivery
15 days
10Cable 2.5 Sq Mm Single Core Black Colour Make KEI Or Finolex Or HavellsQuantity74Delivery15 daysDetailsClose
Delivery
15 days
11Cable 2.5 Sq Mm Single Core Red Colour Make KEI Or Finolex Or HavellsQuantity25Delivery15 daysDetailsClose
Delivery
15 days
12Cable 2.5 Sq Mm Twin Core Black Colour Make KEI Or Finolex Or HavellsQuantity6Delivery15 daysDetailsClose
Delivery
15 days
13Three Core 16 Sqmm Make KEI Or Finolex Or HavellsQuantity4Delivery15 daysDetailsClose
Delivery
15 days
14Al Cable 2 Core 16 Sqmm Make KEI Or Finolex Or HavellsQuantity2Delivery15 daysDetailsClose
Delivery
15 days
15Flexible Copper Wire 2 Sqmm Make KEI Or Finolex Or HavellsQuantity12Delivery15 daysDetailsClose
Delivery
15 days
16PVC Al Wire 3 Core 10 Sq Mm Make KEI Or Finolex Or HavellsQuantity15Delivery15 daysDetailsClose
Delivery
15 days
17PVC Al Wire 3 Core 16 Sq Mm Make KEI Or Finolex Or HavellsQuantity9Delivery15 daysDetailsClose
Delivery
15 days
18PVC Al Wire 3 Core 4 Sq Mm Make KEI Or Finolex Or HavellsQuantity12Delivery15 daysDetailsClose
Delivery
15 days
19PVC Al Wire 3 Core 6 Sq Mm Make KEI Or Finolex Or HavellsQuantity3Delivery15 daysDetailsClose
Delivery
15 days
20LED Ceiling Light 2 Feet X 2 Feet Make Bajaj Or Havells Or CromptonQuantity10Delivery15 daysDetailsClose
Delivery
15 days
21Angle Holder Make Bajaj Or Phillips Or CGQuantity239Delivery15 daysDetailsClose
Delivery
15 days
22Socket Outlet 5 Amp Flush Type 5 Pin Anchor Or Siemens Or L And T Or HavellsQuantity302Delivery15 daysDetailsClose
Delivery
15 days
23PVC Insulate Copper Cable 1 Sqmm Single Red As Per Sample Make KEI Or Finolex Or HavellsQuantity40Delivery15 daysDetailsClose
Delivery
15 days
24PVC Insulate Copper Cable 1 Sqmm Single Black As Per Sample Make KEI Or Finolex Or HavellsQuantity3Delivery15 daysDetailsClose
Delivery
15 days
254sqmm Copper Wire Make KEI Or Finolex Or HavellsQuantity5Delivery15 daysDetailsClose
Delivery
15 days
26Eelct Cable 2 Core 1 Sq Mm Make KEI Or Finolex Or HavellsQuantity14Delivery15 daysDetailsClose
Delivery
15 days
27Two Core Copper Cable 1.5 Sq Mm Make KEI Or Finolex Or HavellsQuantity31Delivery15 daysDetailsClose
Delivery
15 days
28Cable 1.5 Sqmm Single Core Red Colour Make KEI Or Finolex Or HavellsQuantity62Delivery15 daysDetailsClose
Delivery
15 days
29Cable 1.5 Sqmm Single Core Balck Colour Make KEI Or Finolex Or HavellsQuantity12Delivery15 daysDetailsClose
Delivery
15 days
30Flexible Cable 1.5 Sqmm Make KEI Or Finolex Or HavellsQuantity25Delivery15 daysDetailsClose
Delivery
15 days
31LED Security Light 100W Make Bajaj Or Havells Or CromptonQuantity20Delivery15 daysDetailsClose
Delivery
15 days
32LED Security Light 50W Make Bajaj Or Havells Or CromptonQuantity79Delivery15 daysDetailsClose
Delivery
15 days
33LED Security Light 40 W Make Bajaj Or Havells Or CromptonQuantity15Delivery15 daysDetailsClose
Delivery
15 days
34LED Security Light 30W Make Bajaj Or Havells Or CromptonQuantity22Delivery15 daysDetailsClose
Delivery
15 days
35Street Light 16 W Make Bajaj Or Havells Or CromptonQuantity13Delivery15 daysDetailsClose
Delivery
15 days
36Street Light 32 W Make Bajaj Or Havells Or CromptonQuantity8Delivery15 daysDetailsClose
Delivery
15 days
37Casing Caping 25 Mm Make Havells Or Presto Plast Or ISI MarkedQuantity949Delivery15 daysDetailsClose
Delivery
15 days
38Casing Caping 32 Mm Make Havells Or Presto Plast Or ISI MarkedQuantity46Delivery15 daysDetailsClose
Delivery
15 days
39Casing Caping 20 Mm Make Havells Or Presto Plast Or ISI MarkedQuantity6Delivery15 daysDetailsClose
Delivery
15 days
40SS Comb 5 By 6 Amp Make Greaves Or Anchor Or L And T Or CGQuantity592Delivery15 daysDetailsClose
Delivery
15 days
41SS Comb 16 Amp Make Greaves Or Anchor Or L And T Or CGQuantity388Delivery15 daysDetailsClose
Delivery
15 days
42Inverter Tube Light 2 Feet Long Make Bajaj Or Phillips Or CGQuantity52Delivery15 daysDetailsClose
Delivery
15 days
43Inverter Tube Light 18 By 20W Make Bajaj Or Phillips Or CGQuantity620Delivery15 daysDetailsClose
Delivery
15 days
44Inverter Tube Light 36 W Make Bajaj Or Phillips Or CGQuantity10Delivery15 daysDetailsClose
Delivery
15 days
45Insulation Tape Make Steel Grip Or FaxellQuantity460Delivery15 daysDetailsClose
Delivery
15 days
46PVC Switch Board 4 Inch X 4 Inch Make Greaves Or Anchor Or L And T Or CGQuantity35Delivery15 daysDetailsClose
Delivery
15 days
47Switch Board PVC 7 Inch X 4 Inch Make Greaves Or Anchor Or L And T Or CGQuantity82Delivery15 daysDetailsClose
Delivery
15 days
48PVC Board 6 Feet X 8 Feet Make Greaves Or Anchor Or L And T Or CGQuantity70Delivery15 daysDetailsClose
Delivery
15 days
49PVC Board 8 Feet X 10 Feet Make Greaves Or Anchor Or L And T Or CGQuantity10Delivery15 daysDetailsClose
Delivery
15 days
50Switch 6 Amp Make Greaves Or Anchor Or L And T Or CGQuantity497Delivery15 daysDetailsClose
Delivery
15 days
51Switch 15 Amp Make Greaves Or Anchor Or L And T Or CGQuantity54Delivery15 daysDetailsClose
Delivery
15 days
52Socket 15 Amp Make Greaves Or Anchor Or L And T Or CGQuantity119Delivery15 daysDetailsClose
Delivery
15 days
53Main Swtich 100 Amp Make Greaves Or Anchor Or L And T Or CGQuantity14Delivery15 daysDetailsClose
Delivery
15 days
54Main Swtich 32 Amp DP Make Greaves Or Anchor Or L And T Or CGQuantity6Delivery15 daysDetailsClose
Delivery
15 days
55Main Swtich 32 Amp TPN Make Greaves Or Anchor Or L And T Or CGQuantity47Delivery15 daysDetailsClose
Delivery
15 days
56Main Swtich 63 Amp TPN Make Greaves Or Anchor Or L And T Or CGQuantity2Delivery15 daysDetailsClose
Delivery
15 days
57Bed Switch Make Greaves Or Anchor Or L And T Or CGQuantity143Delivery15 daysDetailsClose
Delivery
15 days
58Fan Regulator Make Bajaj Or Phillips Or Khaitian Or CGQuantity96Delivery15 daysDetailsClose
Delivery
15 days
59Change Over 63 Amp TPN Make Havells Or Standard Or L And TQuantity7Delivery15 daysDetailsClose
Delivery
15 days
60Change Over 4 Pole 63 AMP Make Havells Or Standard Or L And TQuantity8Delivery15 daysDetailsClose
Delivery
15 days
61Al Cable 10 Sqmm 2 Core Make KEI Or Finolex Or HavellsQuantity8Delivery15 daysDetailsClose
Delivery
15 days
62Pendent Holders Make Anchor Or Siemens Or L And T Or HavellsQuantity101Delivery15 daysDetailsClose
Delivery
15 days
632 Pin Male Plug Socket Anchor Or Siemens Or L And T Or HavellsQuantity10Delivery15 daysDetailsClose
Delivery
15 days
64MCB 6 Amp Make Greaves Or Anchor Or L And T Or CGQuantity100Delivery15 daysDetailsClose
Delivery
15 days
65MCB 6 Amp DP Make Greaves Or Anchor Or L And T Or CGQuantity29Delivery15 daysDetailsClose
Delivery
15 days
66MCB 10 AMP Make Greaves Or Anchor Or L And T Or CGQuantity72Delivery15 daysDetailsClose
Delivery
15 days
67MCB 10 AMP DP Make Greaves Or Anchor Or L And T Or CGQuantity22Delivery15 daysDetailsClose
Delivery
15 days
68MCB SPN 16Amp Make Greaves Or Anchor Or L And T Or CGQuantity132Delivery15 daysDetailsClose
Delivery
15 days
69MCB 16 DP Make Greaves Or Anchor Or L And T Or CGQuantity37Delivery15 daysDetailsClose
Delivery
15 days
70MCB 20 Amp Make Greaves Or Anchor Or L And T Or CGQuantity7Delivery15 daysDetailsClose
Delivery
15 days
71MCB 25 Amp Make Greaves Or Anchor Or L And T Or CGQuantity6Delivery15 daysDetailsClose
Delivery
15 days
72MCB 32 Amp DP Make Greaves Or Anchor Or L And T Or CGQuantity98Delivery15 daysDetailsClose
Delivery
15 days
73MCB 63 Amp SP Make Greaves Or Anchor Or L And T Or CGQuantity41Delivery15 daysDetailsClose
Delivery
15 days
74MCB 63 Amp DP Make Greaves Or Anchor Or L And T Or CGQuantity13Delivery15 daysDetailsClose
Delivery
15 days
75MCB 63 Amp 4P Make Greaves Or Anchor Or L And T Or CGQuantity5Delivery15 daysDetailsClose
Delivery
15 days
76MCB 40 Amp SP Make Greaves Or Anchor Or L And T Or CGQuantity15Delivery15 daysDetailsClose
Delivery
15 days
77MCB 40 Amp DP Make Greaves Or Anchor Or L And T Or CGQuantity5Delivery15 daysDetailsClose
Delivery
15 days
78MCB 32 Amp SP Make Greaves Or Anchor Or L And T Or CGQuantity88Delivery15 daysDetailsClose
Delivery
15 days
79MCCB 150 Amp Make Greaves Or Anchor Or L And T Or CGQuantity1Delivery15 daysDetailsClose
Delivery
15 days
80MCCB 250 Amp Make Greaves Or Anchor Or L And T Or CGQuantity1Delivery15 daysDetailsClose
Delivery
15 days
81MCB Box Make Greaves Or Anchor Or L And T Or CGQuantity10Delivery15 daysDetailsClose
Delivery
15 days
82MCB Box 8 Way Make Greaves Or Anchor Or L And T Or CGQuantity8Delivery15 daysDetailsClose
Delivery
15 days
83MCB Box 6 Way Make Greaves Or Anchor Or L And T Or CGQuantity10Delivery15 daysDetailsClose
Delivery
15 days
84MCB Box 4 Way Make Greaves Or Anchor Or L And T Or CGQuantity18Delivery15 daysDetailsClose
Delivery
15 days
85MCB Box 2 Way Make Greaves Or Anchor Or L And T Or CGQuantity8Delivery15 daysDetailsClose
Delivery
15 days
86PVC Wire 2.5 Sqmm Make KEI Or Finolex Or HavellsQuantity13Delivery15 daysDetailsClose
Delivery
15 days
87Plug 15 Amp 3 Pin Make Anchor Or Siemens Or L And T Or HavellsQuantity200Delivery15 daysDetailsClose
Delivery
15 days
88Cable 4 Sqmm Make KEI Or Finolex Or HavellsQuantity1Delivery15 daysDetailsClose
Delivery
15 days
89Plier Side Cutting 300 Mm Make Taparia Or StanelyQuantity9Delivery15 daysDetailsClose
Delivery
15 days
90PVC Wire 10 Sq Mm Make KEI Or Finolex Or HavellsQuantity2Delivery15 daysDetailsClose
Delivery
15 days
91PVC Wire 16 Sqmm Make KEI Or Finolex Or HavellsQuantity2Delivery15 daysDetailsClose
Delivery
15 days
92Al Cable 10 Sqmm 4 Core Make KEI Or Finolex Or HavellsQuantity30Delivery15 daysDetailsClose
Delivery
15 days

Tender documents

Bid files and supporting documents, linked directly from GeM.

Policy & contract references

Documents you must submit

  • Experience Criteria
  • Past Performance
  • Bidder Turnover
  • Certificate (Requested in ATC)
  • OEM Authorization Certificate
  • OEM Annual Turnover
Show all 7
  • Additional Doc 1 (Requested in ATC)

Eligibility

From the bid and reverse-auction documents

Experience

3 years

Min. turnover

₹6 L

a year, 3-year average

OEM turnover

₹6 L

Past performance

50%

of the bid quantity

Experience & turnover exemptions

Micro & small enterprises (MSE)

Partial exemption
From the reverse auction
Experience required
1 year
Turnover required
1 (in lakhs)
Exemption conditions

Yes | Partial | Experience - 1 year | Turn over value - 1 (in lakhs)

View PDF · p. 3

Exemptions depend on the evidence and conditions specified in the bid.

Preferences & relaxations

From the bid document

  • MSE purchase preference
  • MII preference
  • Class-1/2 local suppliers
  • EMD exemption: no
  • Inspection required: no

Check each criterion against the tender notice before you bid.

Commercial conditions

From the bid document

EMD
₹196,680
Performance guarantee
5% for 12 months
Offer validity
90 days

Reverse auction extension

From the reverse auction

If any seller submits the offer price during last 30 minutes of RA end time, then RA will be automatically extended for next 30 minutes from the last participation time. There is no limit on such RA extension cycle.

View PDF · p. 3

Buyer requirements & conditions

Buyer-added conditions from the bid and the reverse-auction documents.

From the bid document

Actual delivery (and Installation & Commissioning (if covered in scope of supply)) is to be done at following address ENGR RECEPTION CELL, 370 FD COMPANY c/o 101 ENGINEER REGIMENT BATOTE JAMMU AND KASHMIR PIN 182143 .

Bidder financial standing: The bidder should not be under liquidation, court receivership or similar proceedings, should not be bankrupt. Bidder to upload undertaking to this effect with bid.

Bidders are advised to check applicable GST on their own before quoting. Buyer will not take any responsibility in this regards. GST reimbursement will be as per actuals or as per applicable rates (whichever is lower), subject to the maximum of quoted GST %.

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

  • a.Copy of PAN Card.
  • b.Copy of GSTIN.
  • c.Copy of Cancelled Cheque.
  • d.Copy of EFT Mandate duly certified by Bank.

End User Certificate: Wherever Bidders are insisting for End User Certificate from the Buyer, same shall be provided in Buyer’s standard format only.

Experience Criteria: The Bidder or its OEM {themselves or through reseller(s)} should have regularly, manufactured and supplied same or similar Category Products to any Central / State Govt Organization / PSU for 3 years before the bid opening date. Copies of relevant contracts to be submitted along with bid in support of having supplied some quantity during each of the year. In case of bunch bids, the primary product having highest value should meet this criterion.

OPTION CLAUSE: The Purchaser reserves the right to increase or decrease the quantity to be ordered up to 50 percent of bid quantity at the time of placement of contract. The purchaser also reserves the right to increase the ordered quantity up to 50% of the contracted quantity during the currency of the contract at the contracted rates. The delivery period of quantity shall commence from the last date of original delivery order and in cases where option clause is exercised during the extended delivery period the additional time shall commence from the last date of extended delivery period. The additional delivery time shall be (Increased quantity ÷ Original quantity) × Original delivery period (in days), subject to minimum of 30 days. If the original delivery period is less than 30 days, the additional time equals the original delivery period. The Purchaser may extend this calculated delivery duration up to the original delivery period while exercising the option clause. Bidders must comply with these terms.

Scope of supply includes Training: Number of employees to be trained 5 , Place for Training 7 and Duration of training 5 days.

Supplier shall ensure that the Invoice is raised in the name of Consignee with GSTIN of Consignee only.

The successful bidder has to supply all essential accessories required for the successful installation and commissioning of the goods supplied. Besides standard accessories as per normal industry practice, following accessories must be part of supply and cost should be included in bid price: YES .

  • 1.The Seller shall not assign the Contract in whole or part without obtaining the prior written consent of buyer.
  • 2.The Seller shall not sub-contract the Contract in whole or part to any entity without obtaining the prior written consent of buyer.
  • 3.The Seller shall, notwithstanding the consent and assignment/sub-contract, remain jointly and severally liable and responsible to buyer together with the assignee/ sub-contractor, for and in respect of the due performance of the Contract and the Sellers obligations there under.

Without prejudice to Buyer’s right to price adjustment by way of discount or any other right or remedy available to Buyer, Buyer may terminate the Contract or any part thereof by a written notice to the Seller, if:

  • i)The Seller fails to comply with any material term of the Contract. ii) The Seller informs Buyer of its inability to deliver the Material(s) or any part thereof within the stipulated Delivery Period or such inability otherwise becomes apparent. iii) The Seller fails to deliver the Material(s) or any part thereof within the stipulated Delivery Period and/or to replace/rectify any rejected or defective Material(s) promptly. iv) The Seller becomes bankrupt or goes into liquidation.
  • v)The Seller makes a general assignment for the benefit of creditors. vi) A receiver is appointed for any substantial property owned by the Seller. vii) The Seller has misrepresented to Buyer, acting on which misrepresentation Buyer has placed the Purchase Order on the Seller.

While generating invoice in GeM portal, the seller must upload scanned copy of GST invoice and the screenshot of GST portal confirming payment of GST.

14

Scope of Supply

View PDF · p. 55

Scope of supply (Bid price to include all cost components) : Supply Installation Testing and Commissioning of Goods

  • 15.Turnover Bidder Turn Over Criteria: The minimum average annual financial turnover of the bidder during the last three years, ending on 31st March of the previous financial year, should be as indicated in the bid document. Documentary evidence in the form of certified Audited Balance Sheets of relevant periods or a certificate from the Chartered Accountant / Cost Accountant indicating the turnover details for the relevant period shall be uploaded with the bid. In case the date of constitution / incorporation of the bidder is less than 3 year old, the average turnover in respect of the completed financial years after the date of constitution shall be taken into account for this criteria.
  • 16.Turnover OEM Turn Over Criteria: The minimum average annual financial turnover of the OEM of the offered product during the last three years, ending on 31st March of the previous financial year, should be as indicated in the bid document. Documentary evidence in the form of certified Audited Balance Sheets of relevant periods or a certificate from the Chartered Accountant / Cost Accountant indicating the turnover details for the relevant period shall be uploaded with the bid. In case the date of constitution / incorporation of the OEM is less than 3 year old, the average turnover in respect of the completed financial years after the date of constitution shall be taken into account for this criteria. In case of bunch bids, the OEM of CATEGORY RELATED TO primary product having highest bid value should meet this criterion.
  • 17.Purchase Preference (Centre) Purchase preference to Micro and Small Enterprises (MSEs): Purchase preference will be given to MSEs as defined in Public Procurement Policy for Micro and Small Enterprises (MSEs) Order, 2012 dated 23.03.2012 issued by Ministry of Micro, Small and Medium Enterprises and its subsequent Orders/Notifications issued by concerned Ministry. If the bidder wants to avail the Purchase preference, the bidder must be the manufacturer of the offered product in case of bid for supply of goods. Traders are excluded from the purview of Public Procurement Policy for Micro and Small Enterprises. In respect of bid for Services, the bidder must be the Service provider of the offered Service. Relevant documentary evidence in this regard shall be uploaded along with the bid in respect of the offered product or service. If L-1 is not an MSE and MSE Seller (s) has/have quoted price within L-1+ 15% of margin of purchase preference /price band defined in relevant policy, such Seller shall be given opportunity to match L-1 price and contract will be awarded for percentage of 20% of total value.
  • 18.Purchase Preference (Centre) Purchase Preference linked with Local Content (PP-LC) Policy: The bid clause regarding “Preference to Make In India products” stands modified in this bid and shall be governed by the PPLC Policy No. FP-20013/2/2017-FP-PNG dated 17.11.2020 issued by MoP&NG as amended up to date. Accordingly, bidders with Local Content less than or equal to 20% will be treated as “Non Local Supplier”. The prescribed LC shall be applicable on the date of Bid opening. Sanctions on the bidders for false / wrong declaration or not fulfilling the Local Content requirement shall be as per the PPLC policy. Further following additional provisions are added in the certification and verification of local content provision of the Preference to Make in India clause:
  • i.In case of foreign bidder, certificate from the statutory auditor or cost auditor of their own office or subsidiary in India giving the percentage of local content is also acceptable. In case office or subsidiary in India does not exist or Indian office/subsidiary is not required to appoint statutory auditor or cost auditor, certificate from practicing cost accountant or practicing chartered accountant giving the percentage of local content is also acceptable. ii. Along with Each Invoice: The local content certificate (issued by statutory auditor on behalf of procuring company) shall be submitted along with each invoice raised. However, the % of local content may vary with each invoice while maintaining the overall % of local content for the total work/purchase of the pro-rata local content requirement. In case, it is not satisfied cumulatively in the invoices raised up to that stage, the supplier shall indicate how the local content requirement would be met in the subsequent stages. iii. The bidder shall submit an undertaking from the authorized signatory of bidder having the Power of Attorney along with the bid stating the bidder meets the mandatory minimum LC requirement and such undertaking shall become a part of the contract.

Nominated Inspection Agency: On behalf of the Buyer organization, any one of the following Inspection Agency would be conducting inspection of stores before acceptance: Pre-dispatch Inspection at Seller Premises (applicable only if pre-dispatch inspection clause has been selected in ATC): BOARD OF OFFICERS Post Receipt Inspection at consignee site before acceptance of stores: BOARD OF OFFICERS

Inspection of Stores by Inspection Authority of buyer or their authorised Inspecting officers / empanelled inspection agency or their representatives An independent third party Professional Inspection Body can help buyer in mitigating buyer's risk with pre-dispatch/post-dispatch inspection in order to ensure that equipment, components , solutions and documentation conform to contractual requirements. If an institutional buyer like Defense , Railways and MHA etc desires to appoint / nominate their own inspection authority / empanelled inspection agency for inspection of stores to be supplied against the contract , buyer can select this clause indicating cost of inspection in term of percentage which is 0.00 %. As per the contractual provisions / law , the buyer has a right before payment or acceptance to inspect goods at any reasonable place as indicated in contract and time and in any reasonable manner. When the seller is required or authorized to send the goods to the buyer, the inspection may be after their arrival. Expenses of inspection should be borne by the buyer but may be recovered from the seller if the goods do not conform to contractual specification and are rejected. Initially seller may pay for inspection charges as applicable and get the same reimbursed from buyer if store complies to contractual specification etc , on production of payment receipt issued by inspection agency as applicable. Seller/OEM shall send a notice in writing / e-mail to the Inspecting officer / inspection agency specifying the place where inspection is offered and the Inspecting officer shall on receipt of such notice notify to the seller the date and time when the stores would be inspected. The seller shall, at his own expenses, afford to the Inspecting officer , all reasonable facilities and such accommodation as may be necessary for satisfying himself that the stores are being and or have been manufactured in accordance with the technical particulars governing the supply . The decision of the purchaser/inspection authority regarding acceptance / rejection of consignment shall be final and binding on the seller. The Seller shall provide, without any extra charge, all materials, tools, labour and assistance of every kind which the Inspecting officer may demand of him for any test, and examination, other than special or independent test, which he shall require to be made on the seller's premises and the seller shall bear and pay all costs attendant thereon. The seller shall also provide , and deliver for test, free of charge, at such place other than his premises as the Inspecting officer may specify such material or stores as he may require for tests for which seller does not have the facilities or for special/ independent tests. In the event of rejection of stores or any part thereof by the Inspecting officer basis testing outside owing to lack of test facility at sellers premises ,the seller shall, on demand, pay to the buyer the costs incurred in the inspection and/or test. Cost of test shall be assessed at the rate charged by the Laboratory to private persons for similar work. Inspector shall have the right to put all the stores or materials forming part of the same or any part thereof to such tests as he may like fit and proper as per QAP/governing specification . The seller shall not be entitled to object on any ground whatsoever to the method of testing adopted by the Inspecting officer .. Unless otherwise provided for in the contract, the quantity of the stores or materials expended in test will be borne by seller . Inspecting officer is the Final Authority to Certify Performance / accept the consignment . The Inspecting officer’s decision as regards the rejection shall be final and binding on the seller. The seller shall if so required at his own expense mark or permit the Inspecing officer to mark all the approved stores with a recognised Government or purchaser's mark.

21

Certificates

View PDF · p. 57

Material Test Certificate Should Be Sent Along with The Supply. The Material Will Be Checked by Buyer’s Lab & the Results of the Lab will be the Sole Criteria for Acceptance of the Item.

22

Certificates

View PDF · p. 57

The bidder is required to upload, along with the bid, all relevant certificates such as BIS licence, type test certificate, approval certificates and other certificates as prescribed in the Product Specification given in the bid document.

Warranty period of the supplied products shall be 2 years from the date of final acceptance of goods or after completion of installation, commissioning & testing of goods (if included in the scope of supply), at consignee location. OEM Warranty certificates must be submitted by Successful Bidder at the time of delivery of Goods. The seller should guarantee the rectification of goods in case of any break down during the guarantee period. Seller should have well established Installation, Commissioning, Training, Troubleshooting and Maintenance Service group in INDIA for attending the after sales service. Details of Service Centres near consignee destinations are to be uploaded along with the bid.

Over and above the normal Warranty terms as per GeM GTC, the successful bidder / OEM shall have to provide Comprehensive Warranty during the entire Standard warranty period as per contract. : The comprehensive warranty shall be covering the following scope 1 YEAR (Upload an undertaking with the bid confirming compliance by the bidder if Bidder is taking onus of this compliance. In case OEM is taking onus of this compliance, OEM undertaking is to be uploaded along with Bidder undertaking)

Timely Servicing / rectification of defects during warranty period: After having been notified of the defects / service requirement during warranty period, Seller has to complete the required Service / Rectification within 5 days time limit. If the Seller fails to complete service / rectification with defined time limit, a penalty of 0.5% of Unit Price of the product shall be charged as penalty for each week of delay from the seller. Seller can deposit the penalty with the Buyer directly else the Buyer shall have a right to recover all such penalty amount from the Performance Security (PBG).Cumulative Penalty cannot exceed more than 10% of the total contract value after which the Buyer shall have the right to get the service / rectification done from alternate sources at the risk and cost of the Seller besides forfeiture of PBG. Seller shall be liable to re-imberse the cost of such service / rectification to the Buyer.

  • 26.Sample Clause After award of contract – Successful Bidder shall have to get advance sample approved from buyer before bulk manufacturing / starting bulk supplies. Successful Bidder shall submit 5 samples for Buyer's approval, within 7 days of award of contract. Buyer shall, as per contract specifications framework, either approve the advance sample or will provide complete list of modification required in the sample within 5 days of receipt of advance sample. Seller shall be required to ensure supply as per approved sample with modifications as communicated by Buyer. If there is delay from buyer side in approval of advance sample – the delivery period shall be refixed without LD for the period of delay in sample approval. In case, the sample is found to have major deviations / not conforming to the Contract specifications, the buyer at its discretion may call for fresh samples for approval before allowing bulk supplies or may terminate the contract after notifying the deviations to the seller. Unless otherwise provided in the contract, all samples required for test shall be supplied by the contractor free of cost. Where under the contract, the contractor is required to submit an advance sample, any expenses incurred by the contractor on or in connection with the production of stores in bulk, before the sample has been approved unconditionally shall be borne by the Seller and he shall not claim any compensation in the event of such sample being found unacceptable by the Buyer / Consignee.
27

Forms of EMD and PBG

View PDF · p. 58

Bidders can also submit the EMD with Fixed Deposit Receipt made out or pledged in the name of A/C COMMANDING OFFICER, 101 ENGINEER REGIMENT . The bank should certify on it that the deposit can be withdrawn only on the demand or with the sanction of the pledgee. For release of EMD, the FDR will be released in the favour of the bidder by the Buyer after making endorsement on the back of the FDR duly signed and stamped along with covering letter. Bidder has to upload scanned copy/ proof of the FDR along with bid and has to ensure delivery of hardcopy to the Buyer within 5 days of Bid End date/ Bid Opening date

28

Forms of EMD and PBG

View PDF · p. 58

Successful Bidder can submit the Performance Security in the form of Fixed Deposit Receipt also (besides PBG which is allowed as per GeM GTC). FDR should be made out or pledged in the name of COMMANDING OFFICER, 101 ENGINEER REGIMENT A/C (Name of the Seller). The bank should certify on it that the deposit can be withdrawn only on the demand or with the sanction of the pledgee. For release of Security Deposit, the FDR will be released in favour of bidder by the Buyer after making endorsement on the back of the FDR duly signed and stamped along with covering letter. Successful Bidder has to upload scanned copy of the FDR document in place of PBG and has to ensure delivery of hard copy of Original FDR to the Buyer within 15 days of award of contract.

  • 29.Ration Item ATCs Packing Material The items will be supplied by the successful bidder in its original packing material and the packing material will not be returned. Weight of packing material will not be included in quantity supplied and only net weight of the items will be counted. The packing should be of standardized weights of appropriate size. Item will not be accepted in non-standardized weights.Packing Material. The items will be supplied by the successful bidder in its original packing material and the packing material will not be returned. Weight of packing material will not be included in quantity supplied and only net weight of the items will be counted. The packing should be of standardized weights of appropriate size. Item will not be accepted in non-standardized weights.
  • 30.Ration Item ATCs Shelf Life The supplier shall declare the shelf life/best before use for a minimum period equal to the warranty period as given in the DFS for the item. The item should be of the latest manufacture, conforming to the current production standard and having 100% defined life at the time of delivery.
31

Buyer Added Bid Specific ATC

View PDF · p. 58

Buyer uploaded ATC document Click here to view the file.

From the reverse auction

Reverse auction — offer validity

View PDF · p. 3

Participation by the bidder in RA process would be considered as their consent for extension in offer validity by 30 days by the date of RA initiation.

Similar open tenders

Soonest first

Search similar in the explorerFind this tender in the explorer

Open on GeM