22 facts from the tender

Ministry of Railways published this works tender on eProcure on 8 Oct 2026, for Mumbai CST. The estimated value is ₹3.7 Cr and the EMD is ₹7.4 L. It closes on 30 Oct 2026, 3:00 pm IST. Tender ID 92542719 · Ref PA-LD-C-T-2026-04.

Timeline

  1. Published8 Oct 2026 · 12:56 pm
  2. Closes30 Oct 2026 · 3:00 pm

Bidding

Bid type
Open/Advertised
Contract type
Works - General · Expenditure
Tender type
Open
Tendering section
WORKS
Bidding system
Single Packet System
Bidding style
Single Rate for Tender
Validity of offer
60 days
Completion period
18 Months
Tender document cost
None
JV / consortium
Not allowed
Ranking order
Lowest to Highest
Expenditure type
Capital (Works)
Pre-bid meeting
None

Buyer

Inviting authority
DEE-C-PA-ELECTRICAL/CENTRAL RLY
Organisation type
Central Govt. Ministry/Department
Product category
Railway related Products
Location
Mumbai CST
Portal
eProcure
Inviting officer
DEE/C/PADEE-C-PA-ELECTRICAL/CENTRAL RLY

Important dates

Published
8 Oct 2026, 12:56 pm IST
Bidding starts
16 Oct 2026
Closes
30 Oct 2026, 3:00 pm IST

Declarations by the buyer

  • Complies with the Public Procurement (Make in India) Order 2017
  • The tender inviting authority confirms this tender does not violate the GFR rules on procurement through GeM
  • Bidders from a country sharing a land border with India must be registered with the competent authority

Schedule of work

284 items
ItemQuantityRailways’ estimated rateAmount
Schedule 1 · PART-I (A) - OHE items of Electrical Portion of "ROB in lieu of LC gate no. 02 at km 199/6-7 on Pune Daund section
1Preparation of designs & drawings for overhead equipment (With profile drg under new ROB)0.60 Kilometre₹25,622.56₹15,373.54
2Supply of fabricated / roled galvanised traction masts, portals, TTC.10 MT₹1,49,167.38₹14,91,673.80
3Erection of Portal &TTC Boom by Road crane :-Erection in PB.10 MT₹25,931.93₹2,59,319.30
4Supply of fabricated galvanised of small parts of steel (SPS).0.60 MT₹1,54,507.17₹92,704.30
5Erection of fabricated galvanised of small parts of steel (SPS):-Erection in PB.0.60 MT₹16,802.41₹10,081.45
6Supply Guy rod assembly including SPS4 Each₹7,806.66₹31,226.64
7Erection in PB.4 Each₹2,429.82₹9,719.28
8Supply of conventional type single bracket assembly including Insulators and SPS.12 Each₹25,883.59₹3,10,603.08
9Erection in PB.12 Each₹2,381.47₹28,577.64
10Supply of conventional type OHE along with supply of dropper wire, dropper clips & components (Contact & catenary wire will be supply at Daund/Pune Railway Depot)0.60 Kilometre₹62,346.83₹37,408.10
11Erection of conventional type OHE along with dropper wire, dropper clips and components (in PB)0.60 Kilometre₹58,882.58₹35,329.55
12Supply of 3 pulley type Regulating equipment with counter weight assembly & SPs for conventional type OHE.2 Each₹86,691.65₹1,73,383.30
13Erection in PB.2 Each₹7,814.70₹15,629.40
14Supply of materials for termination of Double Overhead equipment conductor including insulator.2 Each₹14,026.18₹28,052.36
15Erection in PB.2 Each₹3,825.18₹7,650.36
16Supply of Anticreep arrangement with 65 Sq. mm catenary wire for conventional type OHE.(Catenary wire will be supplied by Rly.at DD/PAdepot)2 Each₹23,795.37₹47,590.74
17Erection in PB.2 Each₹1,824.77₹3,649.54
18Supply of Solid core cut-in insulator with component.4 Each₹13,368.77₹53,475.08
19Erection in PB.4 Each₹1,601.62₹6,406.48
20Supply of Solid core suspension insulator with component.2 Each₹13,368.77₹26,737.54
21Erection in PB.2 Each₹917.64₹1,835.28
22Supply copper jumper.8 Each₹4,377.86₹35,022.88
23Erection in PB.8 Each₹1,234.24₹9,873.92
24Supply & erection of structure bond.₹11,833.20
25Supply and erection of Galvanized Steel (GI) flat for earth (50 X 6 mm)₹6,304.80
26Transfer of equipment from one mast or support to another in PB10 Each₹5,507.35₹55,073.50
27Dismantling of OHE including SPS, DA, cantilever etc but without structures in PB.0.60 Kilometre₹61,428.40₹36,857.04
28Dismantling of Portal / TTC uprights & mast by cutting.10 MT₹10,858.41₹1,08,584.10
29Reclaimation of OHE mast, portal/TTC upright.12 Each₹7,490.83₹89,889.96
30Splicing and extension of an anchored OHE including supply of contact & catenary splice.4 Set₹8,135.62₹32,542.48
31Dismentalling of Regulating equipment with counter weight assembly in PB4 Each₹7,004.70₹28,018.80
32Dismantling of termination.2 Each₹1,772.20₹3,544.40
33Dismantling of bracket assembly.10 Each₹1,172.96₹11,729.60
34Dismantling of Guy Rod assembly.4 Each₹608.27₹2,433.08
35Dismantling of anticreep arrangement2 Each₹12,297.28₹24,594.56
36Dismantling of 25KV Post/Pin insulator2 Each₹1,396.98₹2,793.96
37Supply and erection of Caution Board.₹3,763.94
38Supply & erection of retro-reflective Number Plate including hardware.₹14,340.40
39Dismantalling & re-erection of Number Plate.10 Each₹74.12₹741.20
40Dismantalling of various types of bonds20 Each₹111.17₹2,223.40
41Breaking of foundation up to 200 mm below track formation.10 Numbers₹2,552.27₹25,522.70
42Transportation of Railway material and Loading/ Unloading of Steel Structures.1,500 MT-Km₹19.17₹28,755
43Slewing of OHE20 Each Span₹4,329.57₹86,591.40
44Provision of False Catenary under Bridge (Contact Wire supplied by Railway)2 Numbers₹27,824.83₹55,649.66
Schedule 2 · PART-I (B) - Foundation items of Electrical Portion of "ROB in lieu of LC gate no. 02 at km 199/6-7 on Pune Daund section
1Cement concrete for foundation & Plinth :- In other than hardsoil & rock80 cum₹7,999.06₹6,39,924.80
2Cement concrete forfoundation & Plinth :- In hard soil & rocky soil.40 cum₹10,080.50₹4,03,220
Schedule 3 · PART-II (A) - OHE items of ROB in lieu of LC gate no. 08 at km 218/4-5 on Pune Daund section
1Preparation of designs & drawings for overhead equipment (With profile drg under new ROB)0.60 Kilometre₹25,622.56₹15,373.54
2Supply of fabricated / roled galvanised traction masts, portals, TTC.12 MT₹1,49,167.38₹17,90,008.56
3Erection of Portal &TTC Boom by Road crane :-Erection in PB.12 MT₹25,931.93₹3,11,183.16
4Supply of fabricated galvanised of small parts of steel (SPS).0.60 MT₹1,54,507.17₹92,704.30
5Erection of fabricated galvanised of small parts of steel (SPS):-Erection in PB.0.60 MT₹16,802.41₹10,081.45
6Supply Guy rod assembly including SPS2 Each₹7,806.66₹15,613.32
7Erection in PB.2 Each₹2,429.82₹4,859.64
8Supply of conventional type single bracket assembly including Insulators and SPS.16 Each₹25,883.59₹4,14,137.44
9Erection in PB.16 Each₹2,381.47₹38,103.52
10Supply of conventional type OHE along with supply of dropper wire, dropper clips & components (Contact & catenary wire will be supply at Daund/Pune Railway Depot)0.60 Kilometre₹62,346.83₹37,408.10
11Erection of conventional type OHE along with dropper wire, dropper clips and components (in PB)0.60 Kilometre₹58,882.58₹35,329.55
12Supply of 3 pulley type Regulating equipment with counter weight assembly & SPs for conventional type OHE.2 Each₹86,691.65₹1,73,383.30
13Erection in PB.2 Each₹7,814.70₹15,629.40
14Supply of materials for termination of Double Overhead equipment conductor including insulator.2 Each₹14,026.18₹28,052.36
15Erection in PB.2 Each₹3,825.18₹7,650.36
16Supply of Anticreep arrangement with 65 Sq. mm catenary wire for conventional type OHE.(Catenary wire will be supplied by Rly.at DD/PAdepot)3 Each₹23,795.37₹71,386.11
17Erection in PB.3 Each₹1,824.77₹5,474.31
18Supply of Solid core cut-in insulator with component.6 Each₹13,368.77₹80,212.62
19Erection in PB.6 Each₹1,601.62₹9,609.72
20Supply of Solid core suspension insulator with component.4 Each₹13,368.77₹53,475.08
21Erection in PB.4 Each₹917.64₹3,670.56
22Supply copper jumper.12 Each₹4,377.86₹52,534.32
23Erection in PB.12 Each₹1,234.24₹14,810.88
24Supply & erection of structure bond.₹15,777.60
25Supply and erection of Galvanized Steel (GI) flat for earth (50 X 6 mm)₹6,304.80
26Transfer of equipment from one mast or support to another in PB18 Each₹5,507.35₹99,132.30
27Dismantling of OHE including SPS, DA, cantilever etc but without structures in PB.0.60 Kilometre₹61,428.40₹36,857.04
28Dismantling of Portal / TTC uprights & mast by cutting.10 MT₹10,858.41₹1,08,584.10
29Reclaimation of OHE mast, portal/TTC upright.18 Each₹7,490.83₹1,34,834.94
30Splicing and extension of an anchored OHE including supply of contact & catenary splice.8 Set₹8,135.62₹65,084.96
31Dismentalling of Regulating equipment with counter weight assembly in PB3 Each₹7,004.70₹21,014.10
32Dismantling of termination.3 Each₹1,772.20₹5,316.60
33Dismantling of bracket assembly.20 Each₹1,172.96₹23,459.20
34Dismantling of Guy Rod assembly.6 Each₹608.27₹3,649.62
35Dismantling of anticreep arrangement3 Each₹12,297.28₹36,891.84
36Dismantling of 25KV Post/Pin insulator4 Each₹1,396.98₹5,587.92
37Supply and erection of Caution Board.₹3,763.94
38Supply & erection of retro-reflective Number Plate including hardware.₹25,812.72
39Dismantalling & re-erection of Number Plate.18 Each₹74.12₹1,334.16
40Dismantalling of various types of bonds.20 Each₹111.17₹2,223.40
41Breaking of foundation up to 200 mm below track formation.8 Numbers₹2,552.27₹20,418.16
42Erection of 150 Sq. mm. Hard Drawn Stranded copper conductor for feederwire of size 37/2.25 Sq. mm. overall diameter 15.75mm500 Metre₹31.54₹15,770
43Supply and erection of materials for termination of all Aluminium 2 5 k V Feeder / Return conductor (single SPIDER)₹64,109.76
44Transportation of Railway material and Loading/ Unloading of Steel Structures from Railway Store to site .1,500 MT-Km₹19.17₹28,755
45Slewing of OHE20 Each Span₹4,329.57₹86,591.40
46Provision of False Catenary under Bridge (Contact Wire supplied by Railway)2 Numbers₹27,824.83₹55,649.66
Schedule 4 · Part-II (B) - Foundation items ROB in lieu of LC gate no. 08 at km 218/4-5 on Pune Daund section Part-II (B) - Foundation items ROB in lieu of LC gate no. 08 at km 218/4-5 on Pune Daund section Part-II (B) - Foundation items ROB in lieu of LC gate no. 08 at km 218/4-5 on Pune Daund section Part-II (B) - Foundation items ROB in lieu of LC gate no. 08 at km 218/4-5 on Pune Daund section Part-II (B) - Foundation items ROB in lieu of LC gate no. 08 at km 218/4-5 on Pune Daund section
1Cement concrete forfoundation & Plinth :- In other than hardsoil & rock80 cum₹7,999.06₹6,39,924.80
2Cement concrete forfoundation & Plinth :- In hard soil & rocky soil.40 cum₹10,080.50₹4,03,220
Schedule 5 · PART-III (A) OHE items of ROB in lieu of LC gate no. 36A at km 136/16- 17 on Pune Lonavala section.
1Preparation of designs & drawings for overhead equipment (With profile drg under new ROB)0.60 Kilometre₹25,622.56₹15,373.54
2Supply of fabricated / roled galvanised traction masts, portals, TTC.10 MT₹1,49,167.38₹14,91,673.80
3Erection of Portal &TTC Boom by Road crane :-Erection in PB.10 MT₹25,931.93₹2,59,319.30
4Supply of fabricated galvanised of small parts of steel (SPS).0.60 MT₹1,54,507.17₹92,704.30
5Erection of fabricated galvanised of small parts of steel (SPS):-Erection in PB.0.60 MT₹16,802.41₹10,081.45
6Supply Guy rod assembly including SPS2 Each₹7,806.66₹15,613.32
7Erection in PB.2 Each₹2,429.82₹4,859.64
8Supply of conventional type single bracket assembly including Insulators and SPS.16 Each₹25,883.59₹4,14,137.44
9Erection in PB.16 Each₹2,381.47₹38,103.52
10Erection of 130 sq.mm large Span Wire (in PB).100 Metre₹49.03₹4,903
11Supply of conventional type OHE along with supply of dropper wire, dropper clips & components (Contact & catenary wire will be supply at Daund/Pune Railway Depot)0.60 Kilometre₹62,346.83₹37,408.10
12Erection of conventional type OHE along with dropper wire, dropper clips and components (in PB)0.60 Kilometre₹58,882.58₹35,329.55
13Supply of 3 pulley type Regulating equipment with counter weight assembly & SPs for conventional type OHE.1 Each₹86,691.65₹86,691.65
14Erection in PB.1 Each₹7,814.70₹7,814.70
15Supply of materials for termination of Double Overhead equipment conductor including insulator.2 Each₹14,026.18₹28,052.36
16Erection in PB.2 Each₹3,825.18₹7,650.36
17Supply of Anticreep arrangement with 65 Sq. mm catenary wire for conventional type OHE.(Catenary wire will be supplied by Rly.at DD/PAdepot)1 Each₹23,795.37₹23,795.37
18Erection in PB.1 Each₹1,824.77₹1,824.77
19Supply of Solid core cut-in insulator with component.4 Each₹13,368.77₹53,475.08
20Erection in PB.4 Each₹1,601.62₹6,406.48
21Supply of Solid core suspension insulator with component.2 Each₹13,368.77₹26,737.54
22Erection in PB.2 Each₹917.64₹1,835.28
23Supply copper jumper.4 Each₹4,377.86₹17,511.44
24Erection in PB.4 Each₹1,234.24₹4,936.96
25Supply & erection of structure bond.₹7,888.80
26Supply and erection of Galvanized Steel (GI) flat for earth (50 X 6 mm)₹3,152.40
27Transfer of equipment from one mast or support to another in PB16 Each₹5,507.35₹88,117.60
28Dismantling of OHE including SPS, DA, cantilever etc but without structures in PB.0.60 Kilometre₹61,428.40₹36,857.04
29Dismantling of Portal / TTC uprights & mast by cutting.9.60 MT₹10,858.41₹1,04,240.74
30Reclaimation of OHE mast, portal/TTC upright.8 Each₹7,490.83₹59,926.64
31Splicing and extension of an anchored OHE including supply of contact & catenary splice.8 Set₹8,135.62₹65,084.96
32Dismentalling of Regulating equipment with counter weight assembly in PB1 Each₹7,004.70₹7,004.70
33Dismantling of termination.1 Each₹1,772.20₹1,772.20
34Dismantling of bracket assembly.16 Each₹1,172.96₹18,767.36
35Dismantling of Guy Rod assembly.2 Each₹608.27₹1,216.54
37Dismantling of anticreep arrangement1 Each₹12,297.28₹12,297.28
37Dismantling of 25KV Post/Pin insulator4 Each₹1,396.98₹5,587.92
38Supply and erection of Caution Board.₹1,881.97
39Supply & erection of retro-reflective Number Plate including hardware.₹11,472.32
40Dismantalling & re-erection of Number Plate.8 Each₹74.12₹592.96
41Dismantalling of various types of bonds.8 Each₹111.17₹889.36
42Breaking of foundation up to 200 mm below track formation.8 Numbers₹2,552.27₹20,418.16
43Transportation of Railway material and Loading/ Unloading of Steel Structures from Mumbai to site .1,500 MT-Km₹19.17₹28,755
44Slewing of OHE20 Each Span₹4,329.57₹86,591.40
45Provision of False Catenary under Bridge (Contact Wire supplied by Railway)2 Numbers₹27,824.83₹55,649.66
Schedule 6 · Part-III (B) - Foundation items of ROB in lieu of LC gate no. 36A at km 136/16-17 on Pune Lonavala section.
1Cement concrete forfoundation & Plinth :- In other than hardsoil & rock60 cum₹7,999.06₹4,79,943.60
2Cement concrete forfoundation & Plinth :- In hard soil & rocky soil.40 cum₹10,080.50₹4,03,220
Schedule 7 · PART-IV (A) OHE items of ROB in lieu of LC gate no. 45(Kanhe gate) at Km 148/5-6 on Kanhe-Vadgaon block section.
1Preparation of designs & drawings for overhead equipment (With profile drg under new ROB)0.50 Kilometre₹25,622.56₹12,811.28
2Supply of fabricated / roled galvanised traction masts, portals, TTC.7 MT₹1,49,167.38₹10,44,171.66
3Manual erection of traction masts, fabricated/Rolled including TTC / Portals.:- Erection in PB.7 MT₹16,802.41₹1,17,616.87
4Supply of fabricated galvanised of small parts of steel (SPS).0.36 MT₹1,54,507.17₹55,622.58
5Erection of fabricated galvanised of small parts of steel (SPS).: - Erection in PB.0.36 MT₹16,802.41₹6,048.87
6Supply Guy rod assembly including SPS2 Each₹7,806.66₹15,613.32
7Erection in PB.2 Each₹2,429.82₹4,859.64
8Supply of conventional type single bracket assembly including Insulators and SPS.14 Each₹25,883.59₹3,62,370.26
9Erection in PB.14 Each₹2,381.47₹33,340.58
10Supply of conventional type OHE along with supply of dropper wire, dropper clips & components (Contact & catenary wire will be supply at Daund/Pune Railway Depot)0.50 Kilometre₹62,346.83₹31,173.42
11Erection of conventional type OHE along with dropper wire, dropper clips and components (in PB)0.50 Kilometre₹58,882.58₹29,441.29
12Supply of materials for termination of Double Overhead equipment conductor including insulator.2 Each₹14,026.18₹28,052.36
13Erection in PB.2 Each₹3,825.18₹7,650.36
14Supply of Solid core cut-in insulator with component.4 Each₹13,368.77₹53,475.08
15Erection in PB.4 Each₹1,601.62₹6,406.48
16Supply copper jumper.4 Each₹4,377.86₹17,511.44
17Erection in PB.4 Each₹1,234.24₹4,936.96
18Supply & erection of structure bond.₹15,777.60
19Supply and erection of Galvanized Steel (GI) flat for earth (50 X 6 mm)₹3,152.40
20Transfer of equipment from one mast or support to another in PB16 Each₹5,507.35₹88,117.60
21Dismantling of OHE including SPS, DA, cantilever etc but without structures in PB.0.50 Kilometre₹61,428.40₹30,714.20
22Dismantling of Portal / TTC uprights & mast by cutting.5.76 MT₹10,858.41₹62,544.44
23Reclaimation of OHE mast, portal/TTC upright.16 Each₹7,490.83₹1,19,853.28
24Splicing and extension of an anchored OHE including supply of contact & catenary splice.4 Set₹8,135.62₹32,542.48
25Dismantling of termination.1 Each₹1,772.20₹1,772.20
26Dismantling of bracket assembly.16 Each₹1,172.96₹18,767.36
27Dismantling of Guy Rod assembly.2 Each₹608.27₹1,216.54
28Dismantling of 25KV Post/Pin insulator4 Each₹1,396.98₹5,587.92
29Supply and erection of Caution Board.₹1,881.97
30Supply & erection of retro-reflective Number Plate including hardware.₹22,944.64
31Dismantalling & re-erection of Number Plate.8 Each₹74.12₹592.96
32Dismantalling of various types of bonds.16 Each₹111.17₹1,778.72
33Breaking of foundation up to 200 mm below track formation.16 Numbers₹2,552.27₹40,836.32
34Erection of 150 Sq. mm. Hard Drawn Stranded copper conductor for feederwire of size 37/2.25 Sq. mm. overall diameter 15.75mm500 Metre₹31.54₹15,770
35Supply and erection of materials for termination of all Aluminium 2 5 k V Feeder / Return conductor (single SPIDER)₹64,109.76
36Transportation of Railway material and Loading/ Unloading of Steel Structures from Mumbai to site .1,000 MT-Km₹19.17₹19,170
37Slewing of OHE20 Each Span₹4,329.57₹86,591.40
38Provision of False Catenary under Bridge (Contact Wire supplied by Railway)2 Numbers₹27,824.83₹55,649.66
Schedule 8 · Part- IV (B) - Foundation items of ROB in lieu of LC gate no. 45(Kanhe gate) at Km 148/5-6 on Kanhe-Vadgaon block section.
1Cement concrete forfoundation & Plinth :- In other than hardsoil & rock24 cum₹7,999.06₹1,91,977.44
2Cement concrete forfoundation & Plinth :- In hard soil & rocky soil.16 cum₹10,080.50₹1,61,288
Schedule 9 · PART-V (A) NI related OHE work of Lonand-Phaltan and Ahmednagar- Beed-Parli section
1Preparation of designs & drawings for overhead equipment4 Kilometre₹25,622.56₹1,02,490.24
2Supply of fabricated / roled galvanised traction masts, portals, TTC.35 MT₹1,49,167.38₹52,20,858.30
3Manual erection of traction masts, fabricated/Rolled including TTC / Portals :- Erection in PB.4 MT₹16,802.41₹67,209.64
4Manual erection of traction masts, fabricated/Rolled including TTC / Portals :- Erection in NPB.10 MT₹8,401.21₹84,012.10
5Erection of Portal & TTC Boom by Road crane :- Erection in PB.4 MT₹25,931.93₹1,03,727.72
6Erection of Portal & TTC Boom by Road crane :-Erection in NPB.17 MT₹12,965.96₹2,20,421.32
7Supply of fabricated galvanised of small parts of steel (SPS).10 MT₹1,54,507.17₹15,45,071.70
8Erection of fabricated galvanised of small parts of steel (SPS):- Erection in PB.3 MT₹16,802.41₹50,407.23
9Erection of fabricated galvanised of small parts of steel (SPS):- Erection in NPB.7 MT₹8,401.21₹58,808.47
10Supply Guy rod assembly including SPS10 Each₹7,806.66₹78,066.60
11Erection in PB.2 Each₹2,429.82₹4,859.64
12Erection in NPB.8 Each₹1,214.91₹9,719.28
13Supply of conventional type single bracket assembly including Insulators and SPS.50 Each₹25,883.59₹12,94,179.50
14Erection in PB.10 Each₹2,381.47₹23,814.70
15Erection in NPB.40 Each₹1,190.73₹47,629.20
16Erection of 130 sq.mm large Span Wire (in PB).200 Metre₹55.57₹11,114
17Erection of 130 sq.mm large Span Wire (in NPB).200 Metre₹27.03₹5,406
18Supply of conventional type OHE along with supply of dropper wire, dropper clips & components (Contact & catenary wire will be supply at Daund/Pune Railway Depot)4 Kilometre₹62,346.83₹2,49,387.32
19Erection of conventional type OHE along with dropper wire, dropper clips and components (in PB)0.80 Kilometre₹58,882.58₹47,106.06
20Manual erection of conventional type OHE along with all required components including supply of dropper wire (in NPB)3.20 Kilometre₹29,441.29₹94,212.13
21Supply of 3 pulley type Regulating equipment with counter weight assembly & SPs for conventional type OHE.8 Each₹86,691.65₹6,93,533.20
22Erection in PB.4 Each₹7,814.70₹31,258.80
23Erection in NPB.4 Each₹3,907.35₹15,629.40
24Supply of materials for termination of Double Overhead equipment conductor including insulator.8 Each₹14,026.18₹1,12,209.44
25Erection in PB.4 Each₹3,825.18₹15,300.72
26Erection in NPB.4 Each₹1,912.58₹7,650.32
27Supply of Anticreep arrangement with 65 Sq. mm catenary wire for conventional type OHE.(Catenary wire will be supplied by Rly.at DD/PAdepot)4 Each₹23,795.37₹95,181.48
28Erection in PB.2 Each₹1,824.77₹3,649.54
29Erection in NPB.2 Each₹911.63₹1,823.26
30Supply of Solid core cut-in insulator with component.8 Each₹13,368.77₹1,06,950.16
31Erection in PB.2 Each₹1,601.62₹3,203.24
32Erection in NPB.6 Each₹800.81₹4,804.86
33Supply of Solid core suspension insulator with component.8 Each₹13,368.77₹1,06,950.16
34Erection in PB.2 Each₹917.64₹1,835.28
35Erection in NPB.6 Each₹459.57₹2,757.42
36Supply of 25 KV solid core Post insulator with component.20 Each₹9,719.24₹1,94,384.80
37Erection in PB.10 Each₹1,272.08₹12,720.80
38Erection in NPB.10 Each₹636.78₹6,367.80
39Supply of Conventional type Section Insulator assembly including insulator.6 Each₹53,415.51₹3,20,493.06
40Erection in PB.3 Each₹8,782.90₹26,348.70
41Erection in NPB.3 Each₹4,391.45₹13,174.35
42Supply of 25 KV Single Pole Isolator complete Assembly including operating rod & post insulator with mounting base.6 Each₹88,459.22₹5,30,755.32
43Erection in PB.3 Each₹9,409.87₹28,229.61
44Erection in NPB.3 Each₹4,704.94₹14,114.82
45Supply copper jumper.20 Each₹4,377.86₹87,557.20
46Erection in PB.10 Each₹1,234.24₹12,342.40
47Erection in NPB.10 Each₹617.12₹6,171.20
48Supply & erection of structure bond.₹98,610
49Supply & erection of longitudinal / inter Rail bond.₹7,315.10
50Supply & erection of Transverse & special bond.₹11,537
51Supply and erection of Single earth electrode.₹59,440
52Supply and erection of Galvanized Steel(GI) flat for earth (50 X 6 mm)₹15,762
53Supply of 36 x 28mm Aluminium bus bar.20 Metre₹679.95₹13,599
54Erection in PB.10 Metre₹76.60₹766
55Erection in NPB.10 Metre₹39.05₹390.50
56Supply of Bus connectors/terminals, splice suitable for 36x28mm Aluminium bus bar.8 Each₹2,785.91₹22,287.28
57Erection in PB.4 Each₹1,053.77₹4,215.08
58Erection in NPB.4 Each₹526.90₹2,107.60
59Transfer of equipment from one mast or support to another.20 Each₹4,493.57₹89,871.40
60Transfer of equipment from one mast or support to another in PB10 Each₹5,507.35₹55,073.50
61Dismantling of OHE including SPS, DA, cantilever etc but without structures in PB.1 Kilometre₹61,428.40₹61,428.40
62Dismantling of OHE including SPS, DA, cantilever etc but without structures in NPB1 Kilometre₹30,714.20₹30,714.20
63Dismantling of Portal / TTC uprights & mast by cutting.5 MT₹10,858.41₹54,292.05
64Dismantling of OHE portal booms / TTC boom including SPS.4 MT₹25,065.05₹1,00,260.20
65Reclaimation of OHE mast, portal/TTC upright.20 Each₹7,490.83₹1,49,816.60
66Splicing and extension of an anchored OHE including supply of contact & catenary splice.4 Set₹8,135.62₹32,542.48
67Dismentalling of Regulating equipment with counter weight assembly in PB2 Each₹7,004.70₹14,009.40
68Dismentalling of Regulating equipment with counter weight assembly.2 Each₹3,963.75₹7,927.50
69Dismantling of termination.4 Each₹1,772.20₹7,088.80
70Dismantling of bracket assembly.10 Each₹1,172.96₹11,729.60
71Dismantling of Guy Rod assembly.2 Each₹608.27₹1,216.54
72Dismantling of anticreep arrangement4 Each₹12,297.28₹49,189.12
73Dismantling of Section insulator Assembly.4 Each₹9,193.96₹36,775.84
74Dismantling of Isolator including earth contact.1 Each₹3,303.11₹3,303.11
75Dismantling of 25KV Post/Pin insulator6 Each₹1,396.98₹8,381.88
76Supply and erection of Caution Board.₹94,098.50
77Supply & erection of retro-reflective Number Plate including hardware.₹1,14,723.20
78Dismantalling & re-erection of Number Plate.5 Each₹74.12₹370.60
79Dismantalling of various types of bonds.20 Each₹111.17₹2,223.40
80Breaking of foundation up to 200 mm below track formation.10 Numbers₹2,552.27₹25,522.70
81Supply & erection of Sectioning / Station Working Rule Diagram.2 Set₹6,604.64₹13,209.28
82Supply, transportation, erection, testing and commissioning of 25KVA, 25KV/240V, 1 ph., oil cooled, outdoor type auxiliary transformer with all accessories as per RDSO specification no. ETI/PSI/15(8/2003) and latest RDSO modification including fasteners for erection of ATs & SPS and split type arcing horn on bushing.₹3,76,933.35
83Supply, transportation, erection, testing and commissioning of 25 KV dropout fuse switch assembly including insulators.₹27,847.71
84Supply & erection of 9 Ton insulator with suspension clamps, arcing horn & fasteners.₹7,975.83
85Supply & erection of Danger board.₹580.06
86Supply & erection of Anti climbing device.₹1,319.63
87Design, supply, erection, testing & commissioning of outdoor type, water tight, HDGI junction box on LV side of AT of suitable size made out of 14 SWG sheets along with locking, earthing, red colour indication etc.₹9,717.61
88Supply and provision of GI pipe earthing complete with cement concrete earth chamber confirming to IS 3043 or latest.₹7,250.75
89Supply & laying of 'C' class GI pipe of 75 mm dia, 2 mtr long.₹1,015.10
90Erection of 150 Sq. mm. Hard Drawn Stranded copper conductor for Cross feeder & feeder wire of size 37/2.25 Sq. mm. overall diameter 15.75mm500 Metre₹31.54₹15,770
91Erection of Aluminium armoured PVC insulated PVC sheathed cable of size 2 x 185 sq.mm 1.1 kV grade with cable lugs, clamps, gland etc of suitable size required for successful commissioning of the cable.500 Metre₹21.14₹10,570
92Supply & laying through heavy duty conduit, 2 core x 25 sq mm copper un armoured cable. (AT to LV box & J/Box to C/O S/w)₹2,16,058.50
93Supply & laying of 150 mm size RCC hume pipe alongwith callar coupler etc.as per IS:451₹1,76,620
94Supply and erection of cast iron cable Route marker as per specification/drawing.₹23,880.50
95Supply and erection of RCC Warning cover₹4,024.80
96Transportation of Railway material and Loading/ Unloading of Steel Structures from Site to store/ vice versa8,000 MT-Km₹19.17₹1,53,360
97Excavation of cable trench 40 x100 cm in size & Back filling in all type of soil (normal and hard ) including spreading of river sand 200 mm layer and placing bricks size 200x100x75 mm across the trench and back filling by excavated soil as per IS specification400 Metre₹114.61₹45,844
98Supply of Key Box for Station.2 Numbers₹865.07₹1,730.14
99Supply, Erection ,testing and commissioning of Control and distribution panel with Auto change over switch 155 Amp capacity (3 sourse for CLS supply for 25 kVA AT as per latest RDSO specification.₹1,76,487.05
100Making of Horizontal Boring to track formation below 2mtrs. From formation level suitable for inserting of HDPE Pipe75 Metre₹6,190.91₹4,64,318.25
101Supply & Erection of 18 mm Solid copper busbar₹1,26,945
Schedule 10 · Part- V (B) - Foundation items of NI related OHE work of Lonand- Phaltan and Ahmednagar-Beed-Parli section
1Cement concrete forfoundation & Plinth :- In other than hardsoil & rock500 cum₹7,999.06₹39,99,530
2Cement concrete forfoundation & Plinth :- In hard soil & rocky soil.150 cum₹10,080.50₹15,12,075
Total₹3,69,91,871.69

The total matches the advertised value.

Documents

12 files

Documents to submit

Commercial-Compliance

  • Affidavit as per attached format Annexure-V.

    Document required
  • ANNEXURE.V(A)

    Document required
  • Tender Form (First Sheet)

    Document required
  • Para 4 (a) to (h) to be furnished by the tenderer along with thetender at the time of tender bidding. (Ref: Page No. 4 to 9 ofTender Booklet)

    Document required
  • Power of Attorney

    Document required
  • Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.

    Document optional

Eligibility

Special Financial Criteria

  • Financial Eligibility Criteria:The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; whereV= Advertised value of the tender in crores of RupeesN= Number of years prescribed for completion of work for which bids have been invited.The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover.The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet

    Document required

Special Technical Criteria

  • Technical Eligibility Criteria:(a)The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited:

    1. Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or
    2. Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or
    3. One similar work costing not less than the amount equal to 60% of advertised value of the tender.As regards similar work, tenderer should have executed erection, testing, commissioning of any one of the following types of works.Similar nature work means:-"Execution of any 25 kV AC OHE work".in Central / Sate Govt / Semi-Govt Organizations / Authorities, PSUs, Govt of India undertakings shall only be considered to qualify above eligibility criteria. Necessary Certificate to be submitted along with offer. Certificates from private individuals for whom such works are executed / being executed shall not be accepted. Tenderers may carefully note that their Contract Agreement for this work is liable to be terminated at any time later, in case any of the information furnished by them is found to be untrue or any adverse point comes to light subsequently. The decision of Railway in this regard shall be final and binding. Note: The Joint Venture (JV) will be applicable only for tender cost more than 10 crores as per Railway Board's letter No. 2002/CE-I/CT/37/JV Pt.VIII dated 14.12.2012.Note-Bid Capacity for tenders having advertised value more than Rs. 10.00 Crore shall be applicable.
    Document required

Partnership firm/Joint Venture (JV) / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc.

  • Please submit a certificate in the prescribed format (please download the format from the link given below). Non submission of the certificate, or submission of certificate either not properly filled in, or in a format other than the prescribed format shall lead to summary rejection of your offer. ( Click here to download the Format of Self Certification)

Check each criterion against the tender notice before you bid.

Commercial conditions

EMD
₹739,800
Tender fee
None

Terms & conditions

Bidder declarations (10)

Certifications

  • I/we the tenderer (s) am/are signing this document after carefully reading the contents.

  • I/We the tenderer(s) also accept all the conditions of the tender and have signed all the pages in confirmation thereof.

  • I/we hereby declare that I/we have downloaded the tender documents from Indian Railway website www.ireps.gov.in . I/we have verified the content of the document from the website and there is no addition, no deletion or no alteration to the content of the tender document. In case of any discrepancy noticed at any stage i.e. evaluation of tenders, execution of work or final payment of the contract, the master copy available with the railway Administration shall be final and binding upon me/us.

  • I/we declare and certify that I/we have not made any misleading or false representation in the forms, statements and attachments in proof of the qualification requirements.

  • I/We also understand that my/our offer will be evaluated based on the documents/credentials submitted along with the offer and same shall be binding upon me/us.

  • I/We declare that the information and documents submitted along with the tender by me/us are correct and I/we are fully responsible for the correctness of the information and documents, submitted by us.

  • I/we certify that I/we the tenderer(s) is/are not blacklisted or debarred by Railways or any other Ministry / Department of Govt. of India from participation in tender on the date of submission of bids, either in individual capacity or as a HUF/ member of the partnership firm/LLP/JV/Society/Trust.

  • I/we understand that if the contents of the certificate submitted by us are found to be forged/false at any time during process for evaluation of tenders, it shall lead to forfeiture of the Bid Security and may also lead to any other action provided in the contract including banning of business for a period of upto two year. Further, I/we and all my/our constituents understand that my/our offer shall be summarily rejected.

  • I/we also understand that if the contents of the certificate submitted by us are found to be false/forged at any time after the award of the contract, it will lead to termination of the contract, along with forfeiture of Bid Security/Security Deposit and Performance guarantee and may also lead to any other action provided in the contract including banning of business for a period of upto two year.

  • I/We have read the clause regarding restriction on procurement from a bidder of a country which shares a land border with India and certify that I am/We are not from such a country or, if from such a country, have been registered with the competent Authority. I/We hereby certify that I/we fulfil all the requirements in this regard and am/are eligible to be considered (evidence of valid registration by the competent authority is enclosed)