Browse all bids
GeMOpenGoodsBidCustom itemExtended

Intra-Operative Nerve Monitoring System

Regional Institute Of Medical Sciences Imphal Manipur

Ministry of Health and Family Welfare › Department of Health and Family Welfare › Lamphelpat, Imphal

Delivers to

Imphal West, Manipur

Overview

11 facts from the tender

Ministry of Health and Family Welfare published this goods tender on GeM on 25 Aug 2026, for Imphal West, Manipur. The EMD is ₹1.8 L. It closes on 23 Oct 2026, 1:00 pm IST. Bid number GEM/2026/B/7958698.

Deadline extended from 15 Sep 2026, 1:00 pm IST.

Timeline

  1. Published25 Aug 2026 · 12:31 pm
  2. Reverse auctionIf the bid qualifies, after evaluation

Bidding

Bid type
Bid
Evaluation method
Total value wise evaluation
Packet type
Two Packet Bid
Reverse auction
Yes, 50% Lowest Priced Technically Qualified Bidders
Total quantity
1

Buyer

Created by
sopur.rims-mn
Location
Imphal West · Manipur
Portal
GeM

Important dates

Published
25 Aug 2026, 12:31 pm IST
Original closing date
15 Sep 2026, 1:00 pm IST
Closes
23 Oct 2026, 1:00 pm IST

Items & delivery

1 item · 1 delivery location

Item 1

Intra-Operative Nerve Monitoring System

Quantity1 set
Delivery location

795004,Lamphelpat

Delivery
120 days
Specifications & requirements · 4
Comprehensive Maintenance ( Minimum Percentage )
3 %
Comprehensive Maintenance ( Maximum Percentage )
25 %
Warranty of required product
2 Year
Comprehensive Maintenance Duration (Post Warranty)
8 Year

Tender documents

Documents you must submit

  • Experience Criteria
  • Past Performance
  • Bidder Turnover
  • Certificate (Requested in ATC)
  • OEM Authorization Certificate
  • OEM Annual Turnover
Show all 10
  • Additional Doc 1 (Requested in ATC)
  • Additional Doc 2 (Requested in ATC)
  • Additional Doc 3 (Requested in ATC)
  • Compliance of BoQ specification and supporting document

Eligibility

Experience

3 years

Min. turnover

₹45 L

a year, 3-year average

OEM turnover

₹3.6 Cr

Past performance

20%

of the bid quantity

Experience & turnover exemptions

Micro & small enterprises (MSE)

Complete exemption
Exemption conditions

Yes | Complete

View PDF · p. 2

Exemptions depend on the evidence and conditions specified in the bid.

Preferences & relaxations

  • MSE purchase preference
  • MII preference: no
  • EMD exemption: no
  • Inspection required: no

Check each criterion against the tender notice before you bid.

Commercial conditions

EMD
₹180,000
Performance guarantee
4% for 36 months
Offer validity
180 days
Warranty
2 Year

Buyer requirements & conditions

Buyer-added conditions from the bid document.

Buyer-added terms and requirements

View PDF · p. 6
  • 1.Experience Certificate for the supply of the same to any Govt/ PSU/ any renowned private organisation along with Supply/ Purchase Order.
  • 2.If the agency is registered under MSME or NSIC, then EMD exemption certificate needs to be enclosed.
  • 3.Make in india specific authorisation certificate needs to be enclosed.

Bidder financial standing: The bidder should not be under liquidation, court receivership or similar proceedings, should not be bankrupt. Bidder to upload undertaking to this effect with bid.

Bidders shall quote only those products (Part of Service delivery) in the bid which are not obsolete in the market and has at least 7 years residual market life i.e. the offered product shall not be declared end-of- life by the OEM before this period.

Bidders are advised to check applicable GST on their own before quoting. Buyer will not take any responsibility in this regards. GST reimbursement will be as per actuals or as per applicable rates (whichever is lower), subject to the maximum of quoted GST %.

Buyer Organization specific Integrity Pact shall have to be complied by all bidders. Bidders shall have to upload scanned copy of signed integrity pact as per Buyer organizations policy along with bid. Click here to view the file

End User Certificate: Wherever Bidders are insisting for End User Certificate from the Buyer, same shall be provided in Buyer’s standard format only.

Experience Criteria: The Bidder or its OEM {themselves or through reseller(s)} should have regularly, manufactured and supplied same or similar Category Products to any Central / State Govt Organization / PSU for 3 years before the bid opening date. Copies of relevant contracts to be submitted along with bid in support of having supplied some quantity during each of the year. In case of bunch bids, the primary product having highest value should meet this criterion.

Installation, Commissioning, Testing, Configuration, Training (if any - which ever is applicable as per scope of supply) is to be carried out by OEM / OEM Certified resource or OEM authorised Reseller.

Manufacturer Authorization:Wherever Authorised Distributors/service providers are submitting the bid, Authorisation Form /Certificate with OEM/Original Service Provider details such as name, designation, address, e-mail Id and Phone No. required to be furnished along with the bid

OPTION CLAUSE: The Purchaser reserves the right to increase or decrease the quantity to be ordered up to 50 percent of bid quantity at the time of placement of contract. The purchaser also reserves the right to increase the ordered quantity up to 50% of the contracted quantity during the currency of the contract at the contracted rates. The delivery period of quantity shall commence from the last date of original delivery order and in cases where option clause is exercised during the extended delivery period the additional time shall commence from the last date of extended delivery period. The additional delivery time shall be (Increased quantity ÷ Original quantity) × Original delivery period (in days), subject to minimum of 30 days. If the original delivery period is less than 30 days, the additional time equals the original delivery period. The Purchaser may extend this calculated delivery duration up to the original delivery period while exercising the option clause. Bidders must comply with these terms.

Scope of supply includes Training: Number of employees to be trained 4 , Place for Training RIMS Imphal and Duration of training 5 days.

The successful bidder has to supply all essential accessories required for the successful installation and commissioning of the goods supplied. Besides standard accessories as per normal industry practice, following accessories must be part of supply and cost should be included in bid price: All the items and accessories as per tender specification. .

IMPORTED PRODUCTS: In case of imported products, OEM or Authorized Seller of OEM should have a registered office in India to provide after sales service support in India. The certificate to this effect should be submitted.

17

Forms of EMD and PBG

View PDF · p. 8

Bidders can also submit the EMD with Account Payee Demand Draft in favour of Director RIMS payable at Imphal . Bidder has to upload scanned copy / proof of the DD along with bid and has to ensure delivery of hardcopy to the Buyer within 5 days of Bid End date / Bid Opening date.

18

Forms of EMD and PBG

View PDF · p. 8

Bidders can also submit the EMD with Fixed Deposit Receipt made out or pledged in the name of A/C Director RIMS Imphal . The bank should certify on it that the deposit can be withdrawn only on the demand or with the sanction of the pledgee. For release of EMD, the FDR will be released in the favour of the bidder by the Buyer after making endorsement on the back of the FDR duly signed and stamped along with covering letter. Bidder has to upload scanned copy/ proof of the FDR along with bid and has to ensure delivery of hardcopy to the Buyer within 5 days of Bid End date/ Bid Opening date

19

Forms of EMD and PBG

View PDF · p. 8

Successful Bidder can submit the Performance Security in the form of Fixed Deposit Receipt also (besides PBG which is allowed as per GeM GTC). FDR should be made out or pledged in the name of Director RIMS Imphal A/C (Name of the Seller). The bank should certify on it that the deposit can be withdrawn only on the demand or with the sanction of the pledgee. For release of Security Deposit, the FDR will be released in favour of bidder by the Buyer after making endorsement on the back of the FDR duly signed and stamped along with covering letter. Successful Bidder has to upload scanned copy of the FDR document in place of PBG and has to ensure delivery of hard copy of Original FDR to the Buyer within 15 days of award of contract.

20

Scope of Supply

View PDF · p. 8

Scope of supply (Bid price to include all cost components) : Supply Installation Testing Commissioning of Goods and Training of operators and providing Statutory Clearances required (if any)

21

Certificates

View PDF · p. 8

Bidder's offer is liable to be rejected if they don't upload any of the certificates / documents sought in the Bid document, ATC and Corrigendum if any.

22

Certificates

View PDF · p. 8

ISO 9001: The bidder or the OEM of the offered products must have ISO 9001 certification.

23

Certificates

View PDF · p. 8

The bidder is required to upload, along with the bid, all relevant certificates such as BIS licence, type test certificate, approval certificates and other certificates as prescribed in the Product Specification given in the bid document.

24

Buyer Added Bid Specific ATC

View PDF · p. 9

Buyer Added text based ATC clauses Additional term and conditions details Following mandatory documents must be attached in the bid document as specified; fa iling which bid will be treated as "Non-Responsive".

  • i)Documents with regard to Details compliance statement to be attached at "Additional Doc 1". ii) Documents with regard to Original Literature, Product catalogue, Technical dat asheet from the firm/OEM with Highlighting as per the technical specification must atta ch at "Additional Doc 2". iii) EMD of Rs. 1,80,000/- (Rupees One lakh eighty thousand only ) should be submitted in the form of DD/FD/BG. Hard Copy of EMD should reach RIMS, Imphal within 10 (ten) days fro m date of closing tender. The bidder seeking EMD exemption, must submit the valid supportin g document for the relevant category as per GeM GTC with the bid. Under MSE category, o nly manufacturers for goods and Service Providers for Services are eligible for exe mption from EMD. Traders are excluded from the purview of this Policy. EMD should be in the name of Director RIMS Imphal. iv) Documents with regard to list of Offering/Quoted items mentioning make, model & quantity of each items must be "Additional Doc 3".
  • v)If the supplied goods are not satisfied by the users of RIMS Imphal, then th e goo ds will be returned to the bidders. RIMS, Imphal, will not responsible for supply of sub- standard equipments/items, it should be whole responsible for the bidders. vi) Payment of the machine/equipment will be done only when complete installation, testing and commissioning of the machine i.e. at the stage of Clinical use condition. The machi ne should be verified and accepted by end users and competent Authority of RIMS Imphal. A dvance payment may be considered only when BG submitted by the firm as per the GFR Rul es. vii) The bidders/OEM should produce price reasonability proof and certificate before issuing C ontract Order. If the bidder/OEM was unable to produce price reasonability proof, then order will be cancelled without further notice. viii) All clarifications, grievances, and documentation must be submitted through the designate d "Representation/Clarifications window" on the GeM portal. Documents submitted via email or post (outside the system) will not be considered. ix) If the items are required to demonstrate, the bidders/OEM should demonstrate the items a t RIMS Imphal at bidders own cost.
  • x)RIMS, Imphal, have reserved/ right to cancel the tender at any stages of tender. xi) The bidders should Obtained OEM certificate/Authorization only, not third-party authorizati on. The OEM should be responsible of warranty and CAMC. We M/s ………………, declare that the above terms and conditions are accepted. xii) All necessary certificates for functioning of the machine should be obtained by bidders. xiii) The bidder/OEM should submit acceptance Certificate for 2 years’ warranty and 8 years CMC. xiv) If any false information, documents provided to RIMS Imphal, all responsible sh ould be bear by the bidder. We M/s……………………………………………………………………, declare that the above terms and con ditions and terms & conditions are accepted. With seal and sign of bidder .
  • 25.Turnover Bidder Turn Over Criteria: The minimum average annual financial turnover of the bidder during the last three years, ending on 31st March of the previous financial year, should be as indicated in the bid document. Documentary evidence in the form of certified Audited Balance Sheets of relevant periods or a certificate from the Chartered Accountant / Cost Accountant indicating the turnover details for the relevant period shall be uploaded with the bid. In case the date of constitution / incorporation of the bidder is less than 3 year old, the average turnover in respect of the completed financial years after the date of constitution shall be taken into account for this criteria.
  • 26.Turnover OEM Turn Over Criteria: The minimum average annual financial turnover of the OEM of the offered product during the last three years, ending on 31st March of the previous financial year, should be as indicated in the bid document. Documentary evidence in the form of certified Audited Balance Sheets of relevant periods or a certificate from the Chartered Accountant / Cost Accountant indicating the turnover details for the relevant period shall be uploaded with the bid. In case the date of constitution / incorporation of the OEM is less than 3 year old, the average turnover in respect of the completed financial years after the date of constitution shall be taken into account for this criteria. In case of bunch bids, the OEM of CATEGORY RELATED TO primary product having highest bid value should meet this criterion.
27

Service & Support

View PDF · p. 10

Availability of Service Centres: Bidder/OEM must have a Functional Service Centre in the State of each Consignee's Location in case of carry-in warranty. (Not applicable in case of goods having on-site warranty). If service center is not already there at the time of bidding, successful bidder / OEM shall have to establish one within 30 days of award of contract. Payment shall be released only after submission of documentary evidence of having Functional Service Centre.

28

Service & Support

View PDF · p. 10

Dedicated /toll Free Telephone No. for Service Support : BIDDER/OEM must have Dedicated/toll Free Telephone No. for Service Support.

29

Service & Support

View PDF · p. 10

Escalation Matrix For Service Support : Bidder/OEM must provide Escalation Matrix of Telephone Numbers for Service Support.

Bidder / OEM has to give an undertaking that after expiry of warranty period, it will provide Comprehensive Maintenance Service for next 5 years for the offered products at the rate not more than 5 % of contract price per annum. Buyer reserves the right to enter into a CMC agreement with the Successful Bidder / OEM after expiry of the Warranty period at above mentioned rate and the payment for the CMC charges would be made Annually after rendering of the CMC Services of the relevant CMC period. Performance Security of the successful bidder shall be forfeited if it fails to accept the CMC contract when called upon by the buyer. CMC would include cost of INR (Upload the undertaking). The original Performance Security of contract will be returned only after submission and verification of AMC Performance Security for 5% of total CMC value valid up to CMC period plus 2 months (if there is no other claim).

Warranty period of the supplied products shall be 2 years from the date of final acceptance of goods or after completion of installation, commissioning & testing of goods (if included in the scope of supply), at consignee location. OEM Warranty certificates must be submitted by Successful Bidder at the time of delivery of Goods. The seller should guarantee the rectification of goods in case of any break down during the guarantee period. Seller should have well established Installation, Commissioning, Training, Troubleshooting and Maintenance Service group in INDIA for attending the after sales service. Details of Service Centres near consignee destinations are to be uploaded along with the bid.

Over and above the normal Warranty terms as per GeM GTC, the successful bidder / OEM shall have to provide Comprehensive Warranty during the entire Standard warranty period as per contract. : The comprehensive warranty shall be covering the following scope main machine, software, hardware etc. (Upload an undertaking with the bid confirming compliance by the bidder if Bidder is taking onus of this compliance. In case OEM is taking onus of this compliance, OEM undertaking is to be uploaded along with Bidder undertaking)

Successful bidder will have to ensure that adequate number of dedicated technical service personals / engineers are designated / deployed for attending to the Service Request in a time bound manner and for ensuring Timely Servicing / rectification of defects during warranty period, as per Service level agreement indicated in the relevant clause of the bid.

Timely Servicing / rectification of defects during warranty period: After having been notified of the defects / service requirement during warranty period, Seller has to complete the required Service / Rectification within 4 days time limit. If the Seller fails to complete service / rectification with defined time limit, a penalty of 0.5% of Unit Price of the product shall be charged as penalty for each week of delay from the seller. Seller can deposit the penalty with the Buyer directly else the Buyer shall have a right to recover all such penalty amount from the Performance Security (PBG).Cumulative Penalty cannot exceed more than 10% of the total contract value after which the Buyer shall have the right to get the service / rectification done from alternate sources at the risk and cost of the Seller besides forfeiture of PBG. Seller shall be liable to re-imberse the cost of such service / rectification to the Buyer.

Similar open tenders

Soonest first

Search similar in the explorerFind this tender in the explorer

Open on GeM