IRON ROLLER BARRICADES
***********Budgam
GeM masks the full address in this document.- Delivery
- 45 days
Indian Air Force
Ministry of Defence › Department of Military Affairs
Delivers to
Budgam, Jammu and Kashmir
Ministry of Defence published this goods tender on GeM on 2 Oct 2026, for Budgam, Jammu and Kashmir. The EMD is ₹1.3 L. It was withdrawn on 7 Oct 2026, before its 13 Oct 2026 deadline. Bid number GEM/2026/B/8110893.
This bid was withdrawn from GeM before its deadline (Tenderlelo found it gone on 7 Oct 2026): the buyer cancelled or pulled it, so it no longer takes offers. The portal page may still open.
1 item · Address masked by GeM
***********Budgam
GeM masks the full address in this document.No matching items. Try another name, code or schedule.
Bid files and supporting documents, linked directly from GeM.
Full bid details and conditions
Applies to item 1
Experience
2 years
Min. turnover
₹10 L
a year, 3-year average
OEM turnover
₹50 L
Past performance
80%
of the bid quantity
Yes | Partial | Experience - 1 year (s)
View PDF · p. 2Yes | Partial | Experience - 1 year (s)
View PDF · p. 2Exemptions depend on the evidence and conditions specified in the bid.
Check each criterion against the tender notice before you bid.
Buyer-added conditions from the bid document.
OPTION CLAUSE: The Purchaser reserves the right to increase or decrease the quantity to be ordered up to 25 percent of bid quantity at the time of placement of contract. The purchaser also reserves the right to increase the ordered quantity up to 25% of the contracted quantity during the currency of the contract at the contracted rates. The delivery period of quantity shall commence from the last date of original delivery order and in cases where option clause is exercised during the extended delivery period the additional time shall commence from the last date of extended delivery period. The additional delivery time shall be (Increased quantity ÷ Original quantity) × Original delivery period (in days), subject to minimum of 30 days. If the original delivery period is less than 30 days, the additional time equals the original delivery period. The Purchaser may extend this calculated delivery duration up to the original delivery period while exercising the option clause. Bidders must comply with these terms.
Actual delivery (and Installation & Commissioning (if covered in scope of supply)) is to be done at following address AOC 1WG,AF AIR FORCE STATION SRINAGAR JAMMU AND KASHMIR PIN 190007 .
Bidders shall quote only those products (Part of Service delivery) in the bid which are not obsolete in the market and has at least 2 years residual market life i.e. the offered product shall not be declared end-of- life by the OEM before this period.
Bidder shall submit the following documents along with their bid for Vendor Code Creation:
Experience Criteria: The Bidder or its OEM {themselves or through reseller(s)} should have regularly, manufactured and supplied same or similar Category Products to any Central / State Govt Organization / PSU for 2 years before the bid opening date. Copies of relevant contracts to be submitted along with bid in support of having supplied some quantity during each of the year. In case of bunch bids, the primary product having highest value should meet this criterion.
Installation, Commissioning, Testing, Configuration, Training (if any - which ever is applicable as per scope of supply) is to be carried out by OEM / OEM Certified resource or OEM authorised Reseller.
Manufacturer Authorization:Wherever Authorised Distributors/service providers are submitting the bid, Authorisation Form /Certificate with OEM/Original Service Provider details such as name, designation, address, e-mail Id and Phone No. required to be furnished along with the bid
Shelf Life: The Product/Spare parts to be supplied as part of the services must have minimum 8 Shelf Life. On the date of supply, minimum 30/11/2026 usable shelf life should be available / balance.
While generating invoice in GeM portal, the seller must upload scanned copy of GST invoice and the screenshot of GST portal confirming payment of GST.
Scope of supply (Bid price to include all cost components) : Supply Installation Testing and Commissioning of Goods
Availability of Service Centres: Bidder/OEM must have a Functional Service Centre in the State of each Consignee's Location in case of carry-in warranty. (Not applicable in case of goods having on-site warranty). If service center is not already there at the time of bidding, successful bidder / OEM shall have to establish one within 30 days of award of contract. Payment shall be released only after submission of documentary evidence of having Functional Service Centre.
Dedicated /toll Free Telephone No. for Service Support : BIDDER/OEM must have Dedicated/toll Free Telephone No. for Service Support.
ISO 9001: The bidder or the OEM of the offered products must have ISO 9001 certification.
Bidder's offer is liable to be rejected if they don't upload any of the certificates / documents sought in the Bid document, ATC and Corrigendum if any.
Material Test Certificate Should Be Sent Along with The Supply. The Material Will Be Checked by Buyer’s Lab & the Results of the Lab will be the Sole Criteria for Acceptance of the Item.
The bidder is required to upload, along with the bid, all relevant certificates such as BIS licence, type test certificate, approval certificates and other certificates as prescribed in the Product Specification given in the bid document.
Warranty period of the supplied products shall be 5 years from the date of final acceptance of goods or after completion of installation, commissioning & testing of goods (if included in the scope of supply), at consignee location. OEM Warranty certificates must be submitted by Successful Bidder at the time of delivery of Goods. The seller should guarantee the rectification of goods in case of any break down during the guarantee period. Seller should have well established Installation, Commissioning, Training, Troubleshooting and Maintenance Service group in INDIA for attending the after sales service. Details of Service Centres near consignee destinations are to be uploaded along with the bid.
Successful bidder will have to ensure that adequate number of dedicated technical service personals / engineers are designated / deployed for attending to the Service Request in a time bound manner and for ensuring Timely Servicing / rectification of defects during warranty period, as per Service level agreement indicated in the relevant clause of the bid.
Timely Servicing / rectification of defects during warranty period: After having been notified of the defects / service requirement during warranty period, Seller has to complete the required Service / Rectification within 7 days time limit. If the Seller fails to complete service / rectification with defined time limit, a penalty of 0.5% of Unit Price of the product shall be charged as penalty for each week of delay from the seller. Seller can deposit the penalty with the Buyer directly else the Buyer shall have a right to recover all such penalty amount from the Performance Security (PBG).Cumulative Penalty cannot exceed more than 10% of the total contract value after which the Buyer shall have the right to get the service / rectification done from alternate sources at the risk and cost of the Seller besides forfeiture of PBG. Seller shall be liable to re-imberse the cost of such service / rectification to the Buyer.
Buyer uploaded ATC document Click here to view the file.
Search similar in the explorerFind this tender in the explorer