Browse all bids
GeMOpenGoodsBidBOQ

PROCUREMENT OF AC SPARE

Indian Coast Guard

Ministry of Defence › Department of Defence

Delivers to

South Andaman, Andaman and Nicobar Islands

Overview

10 facts from the tender

Ministry of Defence published this goods tender on GeM on 10 Oct 2026, for South Andaman, Andaman and Nicobar Islands. No EMD is required. It closes on 20 Oct 2026, 9:00 pm IST. Bid number GEM/2026/B/8141221.

Timeline

  1. Published10 Oct 2026 · 8:44 pm
  2. Reverse auctionIf the bid qualifies, after evaluation

Bidding

Bid type
Bid
Evaluation method
Total value wise evaluation
Packet type
Two Packet Bid
Reverse auction
Yes, H1-Highest Priced Bid Elimination
Total quantity
59

Buyer

Created by
gunnerhutbay
Location
South Andaman · Andaman and Nicobar Islands
Portal
GeM

Important dates

Published
10 Oct 2026, 8:44 pm IST
Closes
20 Oct 2026, 9:00 pm IST

Items & delivery

22 items · Address masked by GeM

Delivery location · all items

***********South Andaman

GeM masks the full address in this document.
Showing 22 of 22
01Temperature ThermometerQuantity6Delivery45 daysDetailsClose
Delivery
45 days
02Drier CoreQuantity1Delivery45 daysDetailsClose
Delivery
45 days
03ATU V BeltQuantity2Delivery45 daysDetailsClose
Delivery
45 days
04Condenser End Cover GasketQuantity4Delivery45 daysDetailsClose
Delivery
45 days
05Zinc Anode With Brass CapQuantity4Delivery45 daysDetailsClose
Delivery
45 days
06Vibration Mounting For ATUQuantity6Delivery45 daysDetailsClose
Delivery
45 days
07Vibration EliminatorQuantity1Delivery45 daysDetailsClose
Delivery
45 days
08Vibration EliminatorQuantity1Delivery45 daysDetailsClose
Delivery
45 days
09Compressor OilQuantity6Delivery45 daysDetailsClose
Delivery
45 days
10Suction Pressure GuageQuantity2Delivery45 daysDetailsClose
Delivery
45 days
11Discharge Pressure GuageQuantity2Delivery45 daysDetailsClose
Delivery
45 days
12POSV Valve With CoilQuantity1Delivery45 daysDetailsClose
Delivery
45 days
13ATU Cooling ThermostatQuantity1Delivery45 daysDetailsClose
Delivery
45 days
14AHU Blower Bearing With Sleeve And Locking ArrangingQuantity2Delivery45 daysDetailsClose
Delivery
45 days
15High Pressure Cut OutQuantity2Delivery45 daysDetailsClose
Delivery
45 days
16Water Flow SwitchQuantity2Delivery45 daysDetailsClose
Delivery
45 days
17Expansion ValveQuantity1Delivery45 daysDetailsClose
Delivery
45 days
18Angle ValveQuantity4Delivery45 daysDetailsClose
Delivery
45 days
19Hand Shut Off Valve 3 By 8Quantity3Delivery45 daysDetailsClose
Delivery
45 days
20Angle Valve 5 By 8Quantity4Delivery45 daysDetailsClose
Delivery
45 days
21Low Pressure Cut Out SwitchQuantity2Delivery45 daysDetailsClose
Delivery
45 days
22Condenser Safety ValveQuantity2Delivery45 daysDetailsClose
Delivery
45 days

Tender documents

Bid files and supporting documents, linked directly from GeM.

Policy & contract references

Documents you must submit

  • Experience Criteria
  • Past Performance
  • Bidder Turnover
  • Certificate (Requested in ATC)
  • OEM Annual Turnover

Eligibility

Experience

1 year

Min. turnover

₹2 L

a year, 3-year average

OEM turnover

₹2 L

Past performance

40%

of the bid quantity

Experience & turnover exemptions

Micro & small enterprises (MSE)

Complete exemption
Exemption conditions

Yes | Complete

View PDF · p. 5

Exemptions depend on the evidence and conditions specified in the bid.

Preferences & relaxations

  • MSE purchase preference
  • EMD exemption
  • MII preference: no
  • Inspection required: no

Check each criterion against the tender notice before you bid.

Commercial conditions

EMD
Not required
Performance guarantee
3% for 14 months
Offer validity
180 days

Buyer requirements & conditions

Buyer-added conditions from the bid document.

OPTION CLAUSE: The Purchaser reserves the right to increase or decrease the quantity to be ordered up to 25 percent of bid quantity at the time of placement of contract. The purchaser also reserves the right to increase the ordered quantity up to 25% of the contracted quantity during the currency of the contract at the contracted rates. The delivery period of quantity shall commence from the last date of original delivery order and in cases where option clause is exercised during the extended delivery period the additional time shall commence from the last date of extended delivery period. The additional delivery time shall be (Increased quantity ÷ Original quantity) × Original delivery period (in days), subject to minimum of 30 days. If the original delivery period is less than 30 days, the additional time equals the original delivery period. The Purchaser may extend this calculated delivery duration up to the original delivery period while exercising the option clause. Bidders must comply with these terms.

02

Scope of Supply

View PDF · p. 18

Scope of supply (Bid price to include all cost components) : Only supply of Goods

Warranty period of the supplied products shall be 2 years from the date of final acceptance of goods or after completion of installation, commissioning & testing of goods (if included in the scope of supply), at consignee location. OEM Warranty certificates must be submitted by Successful Bidder at the time of delivery of Goods. The seller should guarantee the rectification of goods in case of any break down during the guarantee period. Seller should have well established Installation, Commissioning, Training, Troubleshooting and Maintenance Service group in INDIA for attending the after sales service. Details of Service Centres near consignee destinations are to be uploaded along with the bid.

04

Buyer Added Bid Specific ATC

View PDF · p. 19

Buyer Added text based ATC clauses

  • (1)Items required as the specification mentioned in bid document.
  • (2)The ordered quantity of the item should be delivered at the Consignee address (Vijay Nagar, Hut Bay, L ittle Andaman-744207) with in the scheduled date of delivery and no extension of DP for whatsoever reaso ns shall be considered or entertained. Partial or non supply of the item within the stipulated delivery date will lead to cancellation of the contract besides raising of incident on the GeM portal.
  • (3)Bidders must upload their undertaking for bid compliance/Terms and Conditions.
  • (4). Mandatory site visit participation in this bid is subject to a mandatory on site visit. All bidders must visi t and inspect the site before submitting their bid. Only those bidders who have completed the on site visit shall be eligible to participate in the bidding process.Bidders shall submit the site visit certificate duly sign ed by the autorised representative of the user department along with the bid. .
05

Buyer Added Bid Specific ATC

View PDF · p. 19

Buyer uploaded ATC document Click here to view the file.

Similar open tenders

Soonest first

Search similar in the explorerFind this tender in the explorer

Open on GeM