Browse all bids
GeMOpenGoodsBidBOQ

Mechanical Engineering Lab Equipments

Higher and Techical Education Department Jharkhand

Government Polytechnic Dhanbad

Delivers to

Dhanbad, Jharkhand

Overview

10 facts from the tender

Higher and Techical Education Department Jharkhand published this goods tender on GeM on 14 Oct 2026, for Dhanbad, Jharkhand. The EMD is ₹1.5 L. It closes on 29 Oct 2026, 7:00 pm IST. Bid number GEM/2026/B/8144700.

Timeline

  1. Published14 Oct 2026 · 6:05 pm
  2. Reverse auctionIf the bid qualifies, after evaluation

Bidding

Bid type
Bid
Evaluation method
Total value wise evaluation
Packet type
Two Packet Bid
Reverse auction
Yes, H1-Highest Priced Bid Elimination
Total quantity
19

Buyer

Created by
buyer24.htedj.jh@gembuyer.in
Location
Dhanbad · Jharkhand
Portal
GeM

Important dates

Published
14 Oct 2026, 6:05 pm IST
Closes
29 Oct 2026, 7:00 pm IST

Items & delivery

19 items · 1 delivery location

Delivery location · all items

828130,PO B POLYTECHNIC, BHULI ROAD,

Showing 19 of 19
01Universal Governor Apparatus Wat Porter Proell HartnellQuantity1Delivery30 daysDetailsClose
Delivery
30 days
02Fire Tube Boiler Model Cochran Lancashire Cut SectionQuantity1Delivery30 daysDetailsClose
Delivery
30 days
03Water Tube Boiler Model Babcock And Wilcox Cut SectionQuantity1Delivery30 daysDetailsClose
Delivery
30 days
04GEAR TRAIN MODELSQuantity1Delivery30 daysDetailsClose
Delivery
30 days
05Flywheel Apparatus Flywheel Energy And Moment Of Inertia ApparatusQuantity1Delivery30 daysDetailsClose
Delivery
30 days
06Motorized Gyroscope Apparatus Gyroscopic Couple ApparatusQuantity1Delivery30 daysDetailsClose
Delivery
30 days
07DIGITAL BRINELL TESTING MACHINEQuantity1Delivery30 daysDetailsClose
Delivery
30 days
08JOMINY END QUENCH TESTING APPARATUSQuantity1Delivery30 daysDetailsClose
Delivery
30 days
09SPECIMEN MOUNTING PRESS HOT COLDQuantity1Delivery30 daysDetailsClose
Delivery
30 days
10WATER COOLER TEST RIGQuantity1Delivery30 daysDetailsClose
Delivery
30 days
11SPLIT AIR CONDITIONING TEST RIGQuantity1Delivery30 daysDetailsClose
Delivery
30 days
12WINDOW AIR CONDITIONING TEST RIGQuantity1Delivery30 daysDetailsClose
Delivery
30 days
13WATER TO WATER HEAT PUMPQuantity1Delivery30 daysDetailsClose
Delivery
30 days
14ELECTROLUX REFRIGERATORQuantity1Delivery30 daysDetailsClose
Delivery
30 days
15CENTRIFUGAL PUMP TEST RIGQuantity1Delivery30 daysDetailsClose
Delivery
30 days
16RECIPROCATING PUMP TEST RIGQuantity1Delivery30 daysDetailsClose
Delivery
30 days
17CLOSED CIRCUIT MULTI STAGE CENTRIFUGAL PUMP TEST RIGQuantity1Delivery30 daysDetailsClose
Delivery
30 days
18ROTAMETER TEST RIGQuantity1Delivery30 daysDetailsClose
Delivery
30 days
19PITOT TUBE APPARATUSQuantity1Delivery30 daysDetailsClose
Delivery
30 days

Tender documents

Bid files and supporting documents, linked directly from GeM.

Policy & contract references

Documents you must submit

  • Experience Criteria
  • Past Performance
  • Bidder Turnover
  • Certificate (Requested in ATC)
  • OEM Authorization Certificate
  • OEM Annual Turnover
Show all 8
  • Additional Doc 1 (Requested in ATC)
  • Compliance of BoQ specification and supporting document

Eligibility

Experience

3 years

Min. turnover

₹25 L

a year, 3-year average

OEM turnover

₹2 Cr

Past performance

80%

of the bid quantity

Experience & turnover exemptions

Exemptions depend on the evidence and conditions specified in the bid.

Preferences & relaxations

  • MSE purchase preference: no
  • MII preference: no
  • EMD exemption: no
  • Inspection required: no

Check each criterion against the tender notice before you bid.

Commercial conditions

EMD
₹150,000
Performance guarantee
3% for 36 months
Offer validity
90 days

Payment terms

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

View PDF · p. 3

Buyer requirements & conditions

Buyer-added conditions from the bid document.

OPTION CLAUSE: The Purchaser reserves the right to increase or decrease the quantity to be ordered up to 25 percent of bid quantity at the time of placement of contract. The purchaser also reserves the right to increase the ordered quantity up to 25% of the contracted quantity during the currency of the contract at the contracted rates. The delivery period of quantity shall commence from the last date of original delivery order and in cases where option clause is exercised during the extended delivery period the additional time shall commence from the last date of extended delivery period. The additional delivery time shall be (Increased quantity ÷ Original quantity) × Original delivery period (in days), subject to minimum of 30 days. If the original delivery period is less than 30 days, the additional time equals the original delivery period. The Purchaser may extend this calculated delivery duration up to the original delivery period while exercising the option clause. Bidders must comply with these terms.

Bidder financial standing: The bidder should not be under liquidation, court receivership or similar proceedings, should not be bankrupt. Bidder to upload undertaking to this effect with bid.

Actual delivery (and Installation & Commissioning (if covered in scope of supply)) is to be done at following address GOVERNMENT POLYTECHNIC DHANBAD P.O. B. POLYTECHNIC DHANBAD DHANBAD-828130 JHARKHAND .

Bidders shall quote only those products (Part of Service delivery) in the bid which are not obsolete in the market and has at least 3 years residual market life i.e. the offered product shall not be declared end-of- life by the OEM before this period.

05

Scope of Supply

View PDF · p. 14

Scope of supply (Bid price to include all cost components) : Supply Installation Testing Commissioning of Goods and Training of operators and providing Statutory Clearances required (if any)

  • 6.Turnover Bidder Turn Over Criteria: The minimum average annual financial turnover of the bidder during the last three years, ending on 31st March of the previous financial year, should be as indicated in the bid document. Documentary evidence in the form of certified Audited Balance Sheets of relevant periods or a certificate from the Chartered Accountant / Cost Accountant indicating the turnover details for the relevant period shall be uploaded with the bid. In case the date of constitution / incorporation of the bidder is less than 3 year old, the average turnover in respect of the completed financial years after the date of constitution shall be taken into account for this criteria.
  • 7.Turnover OEM Turn Over Criteria: The minimum average annual financial turnover of the OEM of the offered product during the last three years, ending on 31st March of the previous financial year, should be as indicated in the bid document. Documentary evidence in the form of certified Audited Balance Sheets of relevant periods or a certificate from the Chartered Accountant / Cost Accountant indicating the turnover details for the relevant period shall be uploaded with the bid. In case the date of constitution / incorporation of the OEM is less than 3 year old, the average turnover in respect of the completed financial years after the date of constitution shall be taken into account for this criteria. In case of bunch bids, the OEM of CATEGORY RELATED TO primary product having highest bid value should meet this criterion.
08

Certificates

View PDF · p. 15

ISO 9001: The bidder or the OEM of the offered products must have ISO 9001 certification.

09

Certificates

View PDF · p. 15

Material Test Certificate Should Be Sent Along with The Supply. The Material Will Be Checked by Buyer’s Lab & the Results of the Lab will be the Sole Criteria for Acceptance of the Item.

10

Certificates

View PDF · p. 15

Bidder's offer is liable to be rejected if they don't upload any of the certificates / documents sought in the Bid document, ATC and Corrigendum if any.

Warranty period of the supplied products shall be 3 years from the date of final acceptance of goods or after completion of installation, commissioning & testing of goods (if included in the scope of supply), at consignee location. OEM Warranty certificates must be submitted by Successful Bidder at the time of delivery of Goods. The seller should guarantee the rectification of goods in case of any break down during the guarantee period. Seller should have well established Installation, Commissioning, Training, Troubleshooting and Maintenance Service group in INDIA for attending the after sales service. Details of Service Centres near consignee destinations are to be uploaded along with the bid.

Data Sheet of the product(s) offered in the bid, are to be uploaded along with the bid documents. Buyers can match and verify the Data Sheet with the product specifications offered. In case of any unexplained mismatch of technical parameters, the bid is liable for rejection.

13

Buyer Added Bid Specific ATC

View PDF · p. 15

Buyer uploaded ATC document Click here to view the file.

Similar open tenders

Soonest first

Search similar in the explorerFind this tender in the explorer

Open on GeM