Gasket Cover Plate, Washer Bonded, Plug Magnetic 3 By 4 BSP, Gasket Fuel Level Sensor, Screw, Step, Filter Assembly Hydraulic Return, Gauge Sight 41mm AF Hexagon Torque 9 10 Nm, Cap Sideshift Stabili…
Indian Army
Ministry of Defence › Department of Military Affairs
Delivers to
Jodhpur, Rajasthan
Overview
10 facts from the tenderMinistry of Defence published this goods tender on GeM on 14 Oct 2026, for Jodhpur, Rajasthan. No EMD is required. It closes on 24 Oct 2026, 2:00 pm IST. Bid number GEM/2026/B/8159846.
Timeline
- Published14 Oct 2026 · 1:30 pm
- Closesin 8d 18h24 Oct 2026 · 2:00 pm
Bidding
- Bid type
- Bid
- Evaluation method
- Total value wise evaluation
- Packet type
- Two Packet Bid
- Reverse auction
- No
- Total quantity
- 326
Buyer
- Created by
- tssbuycon187
- Location
- Jodhpur · Rajasthan
- Portal
- GeM
Important dates
- Published
- 14 Oct 2026, 1:30 pm IST
- Closes
- 24 Oct 2026, 2:00 pm IST
Items & delivery
155 items · Address masked by GeM
***********Jodhpur
GeM masks the full address in this document.01Gasket Cover PlateQuantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
02Washer BondedQuantity6Delivery15 daysDetailsClose
- Delivery
- 15 days
03Plug Magnetic 3 By 4 BSPQuantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
04Gasket Fuel Level SensorQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
05ScrewQuantity6Delivery15 daysDetailsClose
- Delivery
- 15 days
06StepQuantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
07Filter Assembly Hydraulic ReturnQuantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
08Washer BondedQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
09Gauge Sight 41mm AF Hexagon Torque 9 10 NmQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
10Cap Sideshift StabiliserQuantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
11Pin PivotQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
12SpacerQuantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
13Plug LockingQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
14Mounting RubberQuantity3Delivery15 daysDetailsClose
- Delivery
- 15 days
15Mounting ResilientQuantity4Delivery15 daysDetailsClose
- Delivery
- 15 days
16Setscrew M12 X 35mmQuantity5Delivery15 daysDetailsClose
- Delivery
- 15 days
17Grille FrontQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
18JCB LogoQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
19Handle BonnetQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
20Grommet BlindQuantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
21Cable Wire 1000mmQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
22Beading RubberQuantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
23PinQuantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
24Retainer HoseQuantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
25Clip E TypeQuantity12Delivery15 daysDetailsClose
- Delivery
- 15 days
26Fastener DRIVEQuantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
27Key 2.2 MMQuantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
28Decal Power And Eco ModeQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
29DecalQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
30Gaiter Parkbrake LeverQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
31Label RelayQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
32Chart LubricantQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
33GripQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
34Decal Care LinkQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
35Decal WarningQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
36Label FuseQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
37DecalQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
38Plate CompressionQuantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
39Mount RelayQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
40Liner Roof AssemblyQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
41Light InteriorQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
42Liner RoofQuantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
43Liner RoofQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
44Pad FoamQuantity16Delivery15 daysDetailsClose
- Delivery
- 15 days
45CirclipQuantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
46GrommetQuantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
47Screw M6 X 25Quantity16Delivery15 daysDetailsClose
- Delivery
- 15 days
48Rubber Pad 30x20x12Quantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
49Strut Gas DoorQuantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
50BushQuantity8Delivery15 daysDetailsClose
- Delivery
- 15 days
51GrommetQuantity5Delivery15 daysDetailsClose
- Delivery
- 15 days
52Screw GrubQuantity4Delivery15 daysDetailsClose
- Delivery
- 15 days
53GrommetQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
54Catch Window LockbackQuantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
55Screw M5x30 Button HeadQuantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
56Door Seal Left HandQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
57Gasket Door HandleQuantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
58Lock Cover Door Left Hand SideQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
59Strap CheckQuantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
60Door Seal Right HandQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
61Lock Cover Door Right HandQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
62Seal Window Left Hand SideQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
63Handle Righthand M6Quantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
64Rubber WasherQuantity4Delivery15 daysDetailsClose
- Delivery
- 15 days
65Handle Assembly Side Window RHQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
66Handle LefthandQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
67Reflector Reflex WhiteQuantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
68Tape Reflective WhiteQuantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
69Bracket Retainer Left HandQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
70Bracket Retainer Right HandQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
71Window Gasket Right HandQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
72Screw Button HeadQuantity3Delivery15 daysDetailsClose
- Delivery
- 15 days
73Frame SealantQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
74Pad SupportQuantity3Delivery15 daysDetailsClose
- Delivery
- 15 days
75Seal Rear WindowQuantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
76Seal Top Rail WindowQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
77Loctite 243 As RequiredQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
78Seal Top Corner Left HandQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
79Strut Gas WindowQuantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
80Seal DoorQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
81Latch Left Hand AssemblyQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
82Roller PlasticQuantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
83Seat OperatorQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
84Pipe Cover FrontQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
85Pipe Cover Side Left HandQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
86Cover Pipe FrontQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
87Cover Pipe Side Right HandQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
88Cover Excavator Control LeverQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
89Clamping RingQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
90Cover Inner Fender RightsideQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
91Cover Fuse BoxQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
92Cover Assembly Loader ControlQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
93Decal Dipper 3DX Super ArmyQuantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
94Decal JCB 540 X 169Quantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
95JCB Decal Artwork ArmyQuantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
96Decal 4 X 4 SmallQuantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
97Decal 4 X 4 BigQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
98BandQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
99Bracket Mounting Fire ExtiguisherQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
100Cover Steer ColumnQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
101Joint BallQuantity7Delivery15 daysDetailsClose
- Delivery
- 15 days
102Pin Spring 8mm ClevisQuantity3Delivery15 daysDetailsClose
- Delivery
- 15 days
103Knob Assembly With SwitchQuantity4Delivery15 daysDetailsClose
- Delivery
- 15 days
104BearingQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
105Clip ClevisQuantity3Delivery15 daysDetailsClose
- Delivery
- 15 days
106Joint UniversalQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
107Switch DumpQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
108Gaiter Excavator LeverQuantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
109Capscrew M5Quantity4Delivery15 daysDetailsClose
- Delivery
- 15 days
110Clip SafetyQuantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
111Clevis Left Hand ThreadQuantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
112Shim 0.5mmQuantity3Delivery15 daysDetailsClose
- Delivery
- 15 days
113Shim 1.5mmQuantity3Delivery15 daysDetailsClose
- Delivery
- 15 days
114Lever Parking Brake Red GripQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
115Grommet Blind Noml Dia 20mmQuantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
116Knob With SwitchQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
117Label Gearlever 4SPQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
118Gaiter Gear Lever Non SoundproofedQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
119Clamp Gear Lever GaiterQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
120GaiterQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
121SpringQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
122Throttle Hand KnobQuantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
123Gaiter SingleQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
124Plate Retaining GaiterQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
125Spring TorsionQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
126CouplingQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
127Mount ResilientQuantity4Delivery15 daysDetailsClose
- Delivery
- 15 days
128Washer Medium 7 By 8Quantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
129Washer ThrustQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
130Bearing Taper RollerQuantity5Delivery15 daysDetailsClose
- Delivery
- 15 days
131SealQuantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
132CirclipQuantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
133SealQuantity3Delivery15 daysDetailsClose
- Delivery
- 15 days
134Bearing Needle Roller NK 45 By 30Quantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
135Bearing Roller Double RowQuantity3Delivery15 daysDetailsClose
- Delivery
- 15 days
136SealQuantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
137Bearing RollerQuantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
138Shim KitQuantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
139Kit SpacerQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
140Bearing Taper RollerQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
141Bearing Taper RollerQuantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
142Kit Gear DifferentialQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
143Plug BreatherQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
144Nipple ScrewQuantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
145O RingQuantity4Delivery15 daysDetailsClose
- Delivery
- 15 days
146Kit Set Of Spacers From 12.625 To 14.200 ThickQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
147Plug Magnetic 3 By 4 BSP 14Quantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
148Seal Brake Piston Square SectionQuantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
149Plug Filler 33mm Head See TI GEN245Quantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
150Pin Brake Back OffQuantity6Delivery15 daysDetailsClose
- Delivery
- 15 days
151BreatherQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
152Clip JubileeQuantity2Delivery15 daysDetailsClose
- Delivery
- 15 days
153Bearing LinerQuantity4Delivery15 daysDetailsClose
- Delivery
- 15 days
154Mat EnforcementQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
155Gas Strut 700NQuantity1Delivery15 daysDetailsClose
- Delivery
- 15 days
No matching items. Try another name, code or schedule.
Tender documents
Bid files and supporting documents, linked directly from GeM.
- Bid documentOpen
Full bid details and conditions
- Specification DocumentOpen
Applies to items 1–155
- BOQ Detail DocumentOpen
Applies to items 1–155
Policy & contract references
Documents you must submit
- Experience Criteria
- Certificate (Requested in ATC)
- Compliance of BoQ specification and supporting document
Eligibility
Experience & turnover exemptions
Startups
No exemptionExemption conditions
Exemptions depend on the evidence and conditions specified in the bid.
Preferences & relaxations
- MSE purchase preference
- EMD exemption
- MII preference: no
- Inspection required: no
Check each criterion against the tender notice before you bid.
Commercial conditions
- EMD
- Not required
- Performance guarantee
- Not required
- Offer validity
- 30 days
Buyer requirements & conditions
Buyer-added conditions from the bid document.
OPTION CLAUSE: The Purchaser reserves the right to increase or decrease the quantity to be ordered up to 25 percent of bid quantity at the time of placement of contract. The purchaser also reserves the right to increase the ordered quantity up to 25% of the contracted quantity during the currency of the contract at the contracted rates. The delivery period of quantity shall commence from the last date of original delivery order and in cases where option clause is exercised during the extended delivery period the additional time shall commence from the last date of extended delivery period. The additional delivery time shall be (Increased quantity ÷ Original quantity) × Original delivery period (in days), subject to minimum of 30 days. If the original delivery period is less than 30 days, the additional time equals the original delivery period. The Purchaser may extend this calculated delivery duration up to the original delivery period while exercising the option clause. Bidders must comply with these terms.
Bidder's offer is liable to be rejected if they don't upload any of the certificates / documents sought in the Bid document, ATC and Corrigendum if any.
- 3.Sample Clause After award of contract – Successful Bidder shall have to get advance sample approved from buyer before bulk manufacturing / starting bulk supplies. Successful Bidder shall submit 1 samples for Buyer's approval, within 5 days of award of contract. Buyer shall, as per contract specifications framework, either approve the advance sample or will provide complete list of modification required in the sample within 5 days of receipt of advance sample. Seller shall be required to ensure supply as per approved sample with modifications as communicated by Buyer. If there is delay from buyer side in approval of advance sample – the delivery period shall be refixed without LD for the period of delay in sample approval. In case, the sample is found to have major deviations / not conforming to the Contract specifications, the buyer at its discretion may call for fresh samples for approval before allowing bulk supplies or may terminate the contract after notifying the deviations to the seller. Unless otherwise provided in the contract, all samples required for test shall be supplied by the contractor free of cost. Where under the contract, the contractor is required to submit an advance sample, any expenses incurred by the contractor on or in connection with the production of stores in bulk, before the sample has been approved unconditionally shall be borne by the Seller and he shall not claim any compensation in the event of such sample being found unacceptable by the Buyer / Consignee.
- 4.Sample Clause For clothing and allied items, if pre-dispatch Inspection clause has been selected in the Bid, the Inspection Agency shall forward sample from the accepted lot duly identified/ sealed by it, as Reference Sample to each consignee (one reference sample per consignee) for comparing the lot received at consignee end with such reference sample. Such reference samples will be treated as part of supplied quantity from the lot and cost shall be borne by the Buyer.
Similar open tenders
Soonest first- 16h 56mleftPurchase of SparesMinistry of Defence · Closes 16 Oct 2026
- 1 dayleftAlluminium Round Bar 25 Mm, ALLUMINIUM E SECTION 25X12X6M, ALLUMINIUM TUBE DIA 8MM, ALUMI…Labour and Employment Department Gujarat · Closes 17 Oct 2026
- 4 daysleft26PKOC003Ministry of Defence · Closes 20 Oct 2026
- 5 daysleftPLANT SPAREMinistry of Defence · Closes 21 Oct 2026
- 5 daysleftProcurement of operational spares for cummins make Fire Water Engines at BR COTMinistry of Petroleum and Natural Gas · Closes 21 Oct 2026
- 10 daysleftPurchase of SparesMinistry of Defence · Closes 26 Oct 2026
- 18 daysleftPROC OF MT SPARESMinistry of Defence · Closes 2 Nov 2026
- 18 daysleftPROC OF MT SPAREMinistry of Defence · Closes 2 Nov 2026
Search similar in the explorerFind this tender in the explorer