Browse all bids
GeMOpenGoodsBidBOQ

Misc and Contingent Expdr

Indian Army

Ministry of Defence › Department of Military Affairs

Delivers to

South West Delhi, Delhi

Overview

10 facts from the tender

Ministry of Defence published this goods tender on GeM on 14 Oct 2026, for South West Delhi, Delhi. No EMD is required. It closes on 24 Oct 2026, 6:00 pm IST. Bid number GEM/2026/B/8161543.

Timeline

  1. Published14 Oct 2026 · 5:16 pm
  2. Reverse auctionIf the bid qualifies, after evaluation

Bidding

Bid type
Bid
Evaluation method
Total value wise evaluation
Packet type
Two Packet Bid
Reverse auction
Yes, 50% Lowest Priced Technically Qualified Bidders
Total quantity
461

Buyer

Created by
coordmil
Location
South West Delhi · Delhi
Portal
GeM

Important dates

Published
14 Oct 2026, 5:16 pm IST
Closes
24 Oct 2026, 6:00 pm IST

Items & delivery

30 items · Address masked by GeM

Delivery location · all items

***********South West delhi

GeM masks the full address in this document.
Showing 30 of 30
01Installation Of Heavy Duty Water Purifier With Capacity Of 40 Ltr Per HrsQuantity1Delivery30 daysDetailsClose
Delivery
30 days

Specifications & requirements

जीएसट पर इनपुट कर Lे;डट /ITC on GST · जीएसट उपकर कर Lे;डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · 0रवस % 5भार के अनुसार जीएसट/GST as per RCM · 0रवस % 5भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक-Zपक 0रवस% 5भार /Optional RCM

NA · NA · Yes · 18% · 9% · 9 (INR) - Per Unit · Yes

02Heavy Duty Water Purifier Water Storage Tank 40 Ltr CapacityQuantity4Delivery30 daysDetailsClose
Delivery
30 days

Specifications & requirements

जीएसट पर इनपुट कर Lे;डट /ITC on GST · जीएसट उपकर कर Lे;डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · 0रवस % 5भार के अनुसार जीएसट/GST as per RCM · 0रवस % 5भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक-Zपक 0रवस% 5भार /Optional RCM

NA · NA · Yes · 18% · 9% · 9 (INR) - Per Unit · Yes

03Heavy Duty Water Purifier Three Yrs Free AMC With Replacement Of Accessories In Every Three MonthsQuantity12Delivery30 daysDetailsClose
Delivery
30 days

Specifications & requirements

जीएसट पर इनपुट कर Lे;डट /ITC on GST · जीएसट उपकर कर Lे;डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · 0रवस % 5भार के अनुसार जीएसट/GST as per RCM · 0रवस % 5भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक-Zपक 0रवस% 5भार /Optional RCM

NA · NA · Yes · 18% · 9% · 9 (INR) - Per Unit · Yes

04Hot And Cold Water DispenserQuantity15Delivery30 daysDetailsClose
Delivery
30 days

Specifications & requirements

जीएसट पर इनपुट कर Lे;डट /ITC on GST · जीएसट उपकर कर Lे;डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · 0रवस % 5भार के अनुसार जीएसट/GST as per RCM · 0रवस % 5भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक-Zपक 0रवस% 5भार /Optional RCM

NA · NA · Yes · 18% · 9% · 9 (INR) - Per Unit · Yes

05Water Bottle For Water DispenserQuantity25Delivery30 daysDetailsClose
Delivery
30 days

Specifications & requirements

जीएसट पर इनपुट कर Lे;डट /ITC on GST · जीएसट उपकर कर Lे;डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · 0रवस % 5भार के अनुसार जीएसट/GST as per RCM · 0रवस % 5भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक-Zपक 0रवस% 5भार /Optional RCM

NA · NA · Yes · 18% · 9% · 9 (INR) - Per Unit · Yes

06Air Purifier FiltersQuantity15Delivery30 daysDetailsClose
Delivery
30 days

Specifications & requirements

जीएसट पर इनपुट कर Lे;डट /ITC on GST · जीएसट उपकर कर Lे;डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · 0रवस % 5भार के अनुसार जीएसट/GST as per RCM · 0रवस % 5भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक-Zपक 0रवस% 5भार /Optional RCM

NA · NA · Yes · 18% · 9% · 9 (INR) - Per Unit · Yes

07Full PlateQuantity36Delivery30 daysDetailsClose
Delivery
30 days

Specifications & requirements

जीएसट पर इनपुट कर Lे;डट /ITC on GST · जीएसट उपकर कर Lे;डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · 0रवस % 5भार के अनुसार जीएसट/GST as per RCM · 0रवस % 5भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक-Zपक 0रवस% 5भार /Optional RCM

NA · NA · Yes · 18% · 9% · 9 (INR) - Per Unit · Yes

08Quarter PlateQuantity72Delivery30 daysDetailsClose
Delivery
30 days

Specifications & requirements

जीएसट पर इनपुट कर Lे;डट /ITC on GST · जीएसट उपकर कर Lे;डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · 0रवस % 5भार के अनुसार जीएसट/GST as per RCM · 0रवस % 5भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक-Zपक 0रवस% 5भार /Optional RCM

NA · NA · Yes · 18% · 9% · 9 (INR) - Per Unit · Yes

09BowlQuantity36Delivery30 daysDetailsClose
Delivery
30 days

Specifications & requirements

जीएसट पर इनपुट कर Lे;डट /ITC on GST · जीएसट उपकर कर Lे;डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · 0रवस % 5भार के अनुसार जीएसट/GST as per RCM · 0रवस % 5भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक-Zपक 0रवस% 5भार /Optional RCM

NA · NA · Yes · 18% · 9% · 9 (INR) - Per Unit · Yes

10Donga With LidQuantity12Delivery30 daysDetailsClose
Delivery
30 days

Specifications & requirements

जीएसट पर इनपुट कर Lे;डट /ITC on GST · जीएसट उपकर कर Lे;डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · 0रवस % 5भार के अनुसार जीएसट/GST as per RCM · 0रवस % 5भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक-Zपक 0रवस% 5भार /Optional RCM

जीएसट पर इनपुट कर Lे;डट /ITC on GST · जीएसट उपकर कर Lे;डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · 0रवस % 5भार के अनुसार जीएसट/GST as per RCM · 0रवस % 5भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक-Zपक 0रवस% 5भार /Optional RCM

NA · NA · Yes · 18% · 9% · 9 (INR) - Per Unit · Yes

11Table Server For TeaQuantity10Delivery30 daysDetailsClose
Delivery
30 days

Specifications & requirements

जीएसट पर इनपुट कर Lे;डट /ITC on GST · जीएसट उपकर कर Lे;डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · 0रवस % 5भार के अनुसार जीएसट/GST as per RCM · 0रवस % 5भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक-Zपक 0रवस% 5भार /Optional RCM

NA · NA · Yes · 18% · 9% · 9 (INR) - Per Unit · Yes

12Serving SpoonQuantity12Delivery30 daysDetailsClose
Delivery
30 days

Specifications & requirements

जीएसट पर इनपुट कर Lे;डट /ITC on GST · जीएसट उपकर कर Lे;डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · 0रवस % 5भार के अनुसार जीएसट/GST as per RCM · 0रवस % 5भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक-Zपक 0रवस% 5भार /Optional RCM

NA · NA · Yes · 18% · 9% · 9 (INR) - Per Unit · Yes

13Tea SpoonQuantity30Delivery30 daysDetailsClose
Delivery
30 days

Specifications & requirements

जीएसट पर इनपुट कर Lे;डट /ITC on GST · जीएसट उपकर कर Lे;डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · 0रवस % 5भार के अनुसार जीएसट/GST as per RCM · 0रवस % 5भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक-Zपक 0रवस% 5भार /Optional RCM

NA · NA · Yes · 18% · 9% · 9 (INR) - Per Unit · Yes

14Table SpoonQuantity30Delivery30 daysDetailsClose
Delivery
30 days

Specifications & requirements

जीएसट पर इनपुट कर Lे;डट /ITC on GST · जीएसट उपकर कर Lे;डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · 0रवस % 5भार के अनुसार जीएसट/GST as per RCM · 0रवस % 5भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक-Zपक 0रवस% 5भार /Optional RCM

जीएसट पर इनपुट कर Lे;डट /ITC on GST · जीएसट उपकर कर Lे;डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · 0रवस % 5भार के अनुसार जीएसट/GST as per RCM · 0रवस % 5भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक-Zपक 0रवस% 5भार /Optional RCM

NA · NA · Yes · 18% · 9% · 9 (INR) - Per Unit · Yes

15Dessert KnifeQuantity30Delivery30 daysDetailsClose
Delivery
30 days

Specifications & requirements

जीएसट पर इनपुट कर Lे;डट /ITC on GST · जीएसट उपकर कर Lे;डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · 0रवस % 5भार के अनुसार जीएसट/GST as per RCM · 0रवस % 5भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक-Zपक 0रवस% 5भार /Optional RCM

NA · NA · Yes · 18% · 9% · 9 (INR) - Per Unit · Yes

16Medium Serving TongQuantity12Delivery30 daysDetailsClose
Delivery
30 days

Specifications & requirements

जीएसट पर इनपुट कर Lे;डट /ITC on GST · जीएसट उपकर कर Lे;डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · 0रवस % 5भार के अनुसार जीएसट/GST as per RCM · 0रवस % 5भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक-Zपक 0रवस% 5भार /Optional RCM

NA · NA · Yes · 18% · 9% · 9 (INR) - Per Unit · Yes

17Salad ForkQuantity12Delivery30 daysDetailsClose
Delivery
30 days

Specifications & requirements

जीएसट पर इनपुट कर Lे;डट /ITC on GST · जीएसट उपकर कर Lे;डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · 0रवस % 5भार के अनुसार जीएसट/GST as per RCM · 0रवस % 5भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक-Zपक 0रवस% 5भार /Optional RCM

NA · NA · Yes · 18% · 9% · 9 (INR) - Per Unit · Yes

18Fruit ForkQuantity12Delivery30 daysDetailsClose
Delivery
30 days

Specifications & requirements

जीएसट पर इनपुट कर Lे;डट /ITC on GST · जीएसट उपकर कर Lे;डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · 0रवस % 5भार के अनुसार जीएसट/GST as per RCM · 0रवस % 5भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक-Zपक 0रवस% 5भार /Optional RCM

जीएसट पर इनपुट कर Lे;डट /ITC on GST · जीएसट उपकर कर Lे;डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · 0रवस % 5भार के अनुसार जीएसट/GST as per RCM · 0रवस % 5भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक-Zपक 0रवस% 5भार /Optional RCM

NA · NA · Yes · 18% · 9% · 9 (INR) - Per Unit · Yes

19Small Serving TrayQuantity5Delivery30 daysDetailsClose
Delivery
30 days

Specifications & requirements

जीएसट पर इनपुट कर Lे;डट /ITC on GST · जीएसट उपकर कर Lे;डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · 0रवस % 5भार के अनुसार जीएसट/GST as per RCM · 0रवस % 5भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक-Zपक 0रवस% 5भार /Optional RCM

NA · NA · Yes · 18% · 9% · 9 (INR) - Per Unit · Yes

20Medium Serving TrayQuantity5Delivery30 daysDetailsClose
Delivery
30 days

Specifications & requirements

जीएसट पर इनपुट कर Lे;डट /ITC on GST · जीएसट उपकर कर Lे;डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · 0रवस % 5भार के अनुसार जीएसट/GST as per RCM · 0रवस % 5भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक-Zपक 0रवस% 5भार /Optional RCM

NA · NA · Yes · 18% · 9% · 9 (INR) - Per Unit · Yes

21Large Serving TrayQuantity2Delivery30 daysDetailsClose
Delivery
30 days

Specifications & requirements

जीएसट पर इनपुट कर Lे;डट /ITC on GST · जीएसट उपकर कर Lे;डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · 0रवस % 5भार के अनुसार जीएसट/GST as per RCM · 0रवस % 5भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक-Zपक 0रवस% 5भार /Optional RCM

NA · NA · Yes · 18% · 9% · 9 (INR) - Per Unit · Yes

22Tea StrainerQuantity5Delivery30 daysDetailsClose
Delivery
30 days

Specifications & requirements

जीएसट पर इनपुट कर Lे;डट /ITC on GST · जीएसट उपकर कर Lे;डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · 0रवस % 5भार के अनुसार जीएसट/GST as per RCM · 0रवस % 5भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक-Zपक 0रवस% 5भार /Optional RCM

जीएसट पर इनपुट कर Lे;डट /ITC on GST · जीएसट उपकर कर Lे;डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · 0रवस % 5भार के अनुसार जीएसट/GST as per RCM · 0रवस % 5भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक-Zपक 0रवस% 5भार /Optional RCM

NA · NA · Yes · 18% · 9% · 9 (INR) - Per Unit · Yes

23Napkin StandQuantity5Delivery30 daysDetailsClose
Delivery
30 days

Specifications & requirements

जीएसट पर इनपुट कर Lे;डट /ITC on GST · जीएसट उपकर कर Lे;डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · 0रवस % 5भार के अनुसार जीएसट/GST as per RCM · 0रवस % 5भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक-Zपक 0रवस% 5भार /Optional RCM

NA · NA · Yes · 18% · 9% · 9 (INR) - Per Unit · Yes

24Induction PlateQuantity2Delivery30 daysDetailsClose
Delivery
30 days

Specifications & requirements

जीएसट पर इनपुट कर Lे;डट /ITC on GST · जीएसट उपकर कर Lे;डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · 0रवस % 5भार के अनुसार जीएसट/GST as per RCM · 0रवस % 5भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक-Zपक 0रवस% 5भार /Optional RCM

NA · NA · Yes · 18% · 9% · 9 (INR) - Per Unit · Yes

25Crystal GlassQuantity10Delivery30 daysDetailsClose
Delivery
30 days

Specifications & requirements

जीएसट पर इनपुट कर Lे;डट /ITC on GST · जीएसट उपकर कर Lे;डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · 0रवस % 5भार के अनुसार जीएसट/GST as per RCM · 0रवस % 5भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक-Zपक 0रवस% 5भार /Optional RCM

NA · NA · Yes · 18% · 9% · 9 (INR) - Per Unit · Yes

26Borosil Glass MediumQuantity10Delivery30 daysDetailsClose
Delivery
30 days

Specifications & requirements

जीएसट पर इनपुट कर Lे;डट /ITC on GST · जीएसट उपकर कर Lे;डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · 0रवस % 5भार के अनुसार जीएसट/GST as per RCM · 0रवस % 5भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक-Zपक 0रवस% 5भार /Optional RCM

जीएसट पर इनपुट कर Lे;डट /ITC on GST · जीएसट उपकर कर Lे;डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · 0रवस % 5भार के अनुसार जीएसट/GST as per RCM · 0रवस % 5भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक-Zपक 0रवस% 5भार /Optional RCM

NA · NA · Yes · 18% · 9% · 9 (INR) - Per Unit · Yes

27Glass Water BottleQuantity15Delivery30 daysDetailsClose
Delivery
30 days

Specifications & requirements

जीएसट पर इनपुट कर Lे;डट /ITC on GST · जीएसट उपकर कर Lे;डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · 0रवस % 5भार के अनुसार जीएसट/GST as per RCM · 0रवस % 5भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक-Zपक 0रवस% 5भार /Optional RCM

NA · NA · Yes · 18% · 9% · 9 (INR) - Per Unit · Yes

28VIP Tea SetQuantity2Delivery30 daysDetailsClose
Delivery
30 days

Specifications & requirements

जीएसट पर इनपुट कर Lे;डट /ITC on GST · जीएसट उपकर कर Lे;डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · 0रवस % 5भार के अनुसार जीएसट/GST as per RCM · 0रवस % 5भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक-Zपक 0रवस% 5भार /Optional RCM

NA · NA · Yes · 18% · 9% · 9 (INR) - Per Unit · Yes

29Pad Locks 5 Lever For StoresQuantity12Delivery30 daysDetailsClose
Delivery
30 days

Specifications & requirements

जीएसट पर इनपुट कर Lे;डट /ITC on GST · जीएसट उपकर कर Lे;डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · 0रवस % 5भार के अनुसार जीएसट/GST as per RCM · 0रवस % 5भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक-Zपक 0रवस% 5भार /Optional RCM

NA · NA · Yes · 18% · 9% · 9 (INR) - Per Unit · Yes

30Pad Locks 7 Lever For StoresQuantity12Delivery30 daysDetailsClose
Delivery
30 days

Specifications & requirements

जीएसट पर इनपुट कर Lे;डट /ITC on GST · जीएसट उपकर कर Lे;डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · 0रवस % 5भार के अनुसार जीएसट/GST as per RCM · 0रवस % 5भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक-Zपक 0रवस% 5भार /Optional RCM

जीएसट पर इनपुट कर Lे;डट /ITC on GST · जीएसट उपकर कर Lे;डट /ITC on GST Cess · लागू आरसीएम/R CM Applicabl e · 0रवस % 5भार के अनुसार जीएसट/GST as per RCM · 0रवस % 5भार के अनुसार जीएसट उपकार 1 /GST Cess 1 as per RCM · GST Cess 2 as per RCM · वैक-Zपक 0रवस% 5भार /Optional RCM

NA · NA · Yes · 18% · 9% · 9 (INR) - Per Unit · Yes

Tender documents

Documents you must submit

  • Experience Criteria
  • Past Performance
  • Bidder Turnover
  • Certificate (Requested in ATC)
  • OEM Authorization Certificate
  • OEM Annual Turnover

Eligibility

Experience

2 years

Past performance

10%

of the bid quantity

Experience & turnover exemptions

Micro & small enterprises (MSE)

Complete exemption
Exemption conditions

Yes | Complete

View PDF · p. 2

Exemptions depend on the evidence and conditions specified in the bid.

Preferences & relaxations

  • MSE purchase preference
  • MII preference
  • Class-1/2 local suppliers
  • EMD exemption
  • Inspection required: no

Check each criterion against the tender notice before you bid.

Commercial conditions

EMD
Not required
Performance guarantee
Not required
Offer validity
30 days

Buyer requirements & conditions

Buyer-added conditions from the bid document.

OPTION CLAUSE: The Purchaser reserves the right to increase or decrease the quantity to be ordered up to 25 percent of bid quantity at the time of placement of contract. The purchaser also reserves the right to increase the ordered quantity up to 25% of the contracted quantity during the currency of the contract at the contracted rates. The delivery period of quantity shall commence from the last date of original delivery order and in cases where option clause is exercised during the extended delivery period the additional time shall commence from the last date of extended delivery period. The additional delivery time shall be (Increased quantity ÷ Original quantity) × Original delivery period (in days), subject to minimum of 30 days. If the original delivery period is less than 30 days, the additional time equals the original delivery period. The Purchaser may extend this calculated delivery duration up to the original delivery period while exercising the option clause. Bidders must comply with these terms.

While generating invoice in GeM portal, the seller must upload scanned copy of GST invoice and the screenshot of GST portal confirming payment of GST.

WORLD BANK TERMS AND CONDITIONS: Special Terms and Conditions as defined by world bank at click here will also be applicable. APPLICABLE ONLY IN CASE OF WORLD BANK FUNDED PROJECTS.

After award of contract – Successful Bidder shall have to get Detailed Design Drawings approved from buyer before starting fabrication. Successful Bidder shall submit Detailed Design Drawings for Buyer's approval, within 5 days of award of contract. Buyer shall, either approve the drawings or will provide complete list of modification required in the drawings within 5 days. Seller shall be required to ensure supply as per approved Drawings with modifications as communicated by Buyer. If there is delay from buyer side in approval of drawing– the delivery period shall be refixed without LD for the period of delay in approval of Drawing.

Actual delivery (and Installation & Commissioning (if covered in scope of supply)) is to be done at following address As per Terms and Conditons and BID documents As per Terms and Conditons and BID documents As per Terms and Conditons and BID documents As per Terms and Conditons and BID documents As per Terms and Conditons and BID documents .

Bidder financial standing: The bidder should not be under liquidation, court receivership or similar proceedings, should not be bankrupt. Bidder to upload undertaking to this effect with bid.

Bidders shall quote only those products (Part of Service delivery) in the bid which are not obsolete in the market and has at least 5 years residual market life i.e. the offered product shall not be declared end-of- life by the OEM before this period.

Bidders are advised to check applicable GST on their own before quoting. Buyer will not take any responsibility in this regards. GST reimbursement will be as per actuals or as per applicable rates (whichever is lower), subject to the maximum of quoted GST %.

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

  • a.Copy of PAN Card.
  • b.Copy of GSTIN.
  • c.Copy of Cancelled Cheque.
  • d.Copy of EFT Mandate duly certified by Bank.

Consortium: In case of Contracts, wherein the seller alone does not have necessary expertise, the seller can form consortium with other sellers for submission of the bid, with one of the consortium company as leader. However, each and every member of the consortium shall be equally responsible for the complete execution of the project contract. An undertaking to this effect is to be uploaded with bid.

Data Sheet of the product(s) offered in the bid, are to be uploaded along with the bid documents. Buyers can match and verify the Data Sheet with the product specifications offered. In case of any unexplained mismatch of technical parameters, the bid is liable for rejection.

End User Certificate: Wherever Bidders are insisting for End User Certificate from the Buyer, same shall be provided in Buyer’s standard format only.

Experience Criteria: The Bidder or its OEM {themselves or through reseller(s)} should have regularly, manufactured and supplied same or similar Category Products to any Central / State Govt Organization / PSU for 3 years before the bid opening date. Copies of relevant contracts to be submitted along with bid in support of having supplied some quantity during each of the year. In case of bunch bids, the primary product having highest value should meet this criterion.

For hazardous chemical/item, all precautionary measure as per regulation from the point of transportation/ handling/ storage/ safety/ health/ environment to be undertaken/ specified before dispatch. During dispatch, proper symbol for the hazard/ MSDS/ Batch No./ date of manufacturing/ Gross Weight/ Net Weight/ shelf Life etc are to be written/ printed/ pasted on the body of the packing.

HIRING OF SECURITY MANPOWER:

  • 1.Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
  • 2.The wages payable to personnel deployed is as per Ministry of Labour & Employment Minimum wages notification / DGR guideline and wages will be revised accordingly.
  • 3.All guards deployed by the contractor should be Ex-servicemen and not below Medical category ‘B’ and Character not below ‘Very Good who have served in the Army/Navy/Air force and have unblemished record of service besides being mentally and physically fit. Security agency should preferably deploy 70% guards with Infantry background. The personnel thus deployed should be trained in first aid and fire fighting and should be fully conversant with various fire fighting equipment’s, their use and proper maintenance. If the date of discharge is more than Two (02) years from the date of deployment, their medical fitness certificate and Police verification will be carried out by the agency at no additional cost to Buyer prior to their deployment.
  • 4.Contractor shall be required to obtain requisite labour license at his own cost from the appropriate Licensing Authority, before undertaking contract work. Contractor shall provide proper identification cards for his employees to be deputed by him for Work/Services, duly signed by the contractor or authorized person on behalf of contractor. Also the contractor should obtain entry passes from Security Dept. for his employees.

Installation, Commissioning, Testing, Configuration, Training (if any - which ever is applicable as per scope of supply) is to be carried out by OEM / OEM Certified resource or OEM authorised Reseller.

Malicious Code Certificate: The seller should upload following certificate in the bid:-

  • (a)This is to certify that the Hardware and the Software being offered, as part of the contract, does not contain Embedded Malicious code that would activate procedures to :-
  • (i)Inhibit the desires and designed function of the equipment.
  • (ii)Cause physical damage to the user or equipment during the exploitation.
  • (iii)Tap information resident or transient in the equipment/network.
  • (b)The firm will be considered to be in breach of the procurement contract, in case physical damage, loss of information or infringements related to copyright and Intellectual Property Right (IPRs) are caused due to activation of any such malicious code in embedded software.

Manufacturer Authorization:Wherever Authorised Distributors/service providers are submitting the bid, Authorisation Form /Certificate with OEM/Original Service Provider details such as name, designation, address, e-mail Id and Phone No. required to be furnished along with the bid

Non return of Hard Disk: As per Buyer organization’s Security Policy,Faulty Hard Disk of Servers/Desktop Computers/ Laptops etc. will not be returned back to the OEM/supplier against warranty replacement.

Supplier shall ensure that the Invoice is raised in the name of Consignee with GSTIN of Consignee only.

The Buyer has an existing set up / inventory of similar products. The offered / supplied product must be compatible with existing system. The bidder has to ensure Compatibility of the supplied items or shall have to include in the supply the necessary hardware / software to make them compatible at no extra cost to the buyer. The details of items with which compatibility is required are as under: As per Terms and Conditons and BID documents

  • 1.The Seller shall not assign the Contract in whole or part without obtaining the prior written consent of buyer.
  • 2.The Seller shall not sub-contract the Contract in whole or part to any entity without obtaining the prior written consent of buyer.
  • 3.The Seller shall, notwithstanding the consent and assignment/sub-contract, remain jointly and severally liable and responsible to buyer together with the assignee/ sub-contractor, for and in respect of the due performance of the Contract and the Sellers obligations there under.

Without prejudice to Buyer’s right to price adjustment by way of discount or any other right or remedy available to Buyer, Buyer may terminate the Contract or any part thereof by a written notice to the Seller, if:

  • i)The Seller fails to comply with any material term of the Contract. ii) The Seller informs Buyer of its inability to deliver the Material(s) or any part thereof within the stipulated Delivery Period or such inability otherwise becomes apparent. iii) The Seller fails to deliver the Material(s) or any part thereof within the stipulated Delivery Period and/or to replace/rectify any rejected or defective Material(s) promptly. iv) The Seller becomes bankrupt or goes into liquidation.
  • v)The Seller makes a general assignment for the benefit of creditors. vi) A receiver is appointed for any substantial property owned by the Seller. vii) The Seller has misrepresented to Buyer, acting on which misrepresentation Buyer has placed the Purchase Order on the Seller.

IMPORTED PRODUCTS: In case of imported products, OEM or Authorized Seller of OEM should have a registered office in India to provide after sales service support in India. The certificate to this effect should be submitted.

Nominated Inspection Agency: On behalf of the Buyer organization, any one of the following Inspection Agency would be conducting inspection of stores before acceptance: Pre-dispatch Inspection at Seller Premises (applicable only if pre-dispatch inspection clause has been selected in ATC): As per Terms and Conditons and BID documents Post Receipt Inspection at consignee site before acceptance of stores: As per Terms and Conditons and BID documents

Inspection of Stores by Inspection Authority of buyer or their authorised Inspecting officers / empanelled inspection agency or their representatives An independent third party Professional Inspection Body can help buyer in mitigating buyer's risk with pre-dispatch/post-dispatch inspection in order to ensure that equipment, components , solutions and documentation conform to contractual requirements. If an institutional buyer like Defense , Railways and MHA etc desires to appoint / nominate their own inspection authority / empanelled inspection agency for inspection of stores to be supplied against the contract , buyer can select this clause indicating cost of inspection in term of percentage which is 0100 %. As per the contractual provisions / law , the buyer has a right before payment or acceptance to inspect goods at any reasonable place as indicated in contract and time and in any reasonable manner. When the seller is required or authorized to send the goods to the buyer, the inspection may be after their arrival. Expenses of inspection should be borne by the buyer but may be recovered from the seller if the goods do not conform to contractual specification and are rejected. Initially seller may pay for inspection charges as applicable and get the same reimbursed from buyer if store complies to contractual specification etc , on production of payment receipt issued by inspection agency as applicable. Seller/OEM shall send a notice in writing / e-mail to the Inspecting officer / inspection agency specifying the place where inspection is offered and the Inspecting officer shall on receipt of such notice notify to the seller the date and time when the stores would be inspected. The seller shall, at his own expenses, afford to the Inspecting officer , all reasonable facilities and such accommodation as may be necessary for satisfying himself that the stores are being and or have been manufactured in accordance with the technical particulars governing the supply . The decision of the purchaser/inspection authority regarding acceptance / rejection of consignment shall be final and binding on the seller. The Seller shall provide, without any extra charge, all materials, tools, labour and assistance of every kind which the Inspecting officer may demand of him for any test, and examination, other than special or independent test, which he shall require to be made on the seller's premises and the seller shall bear and pay all costs attendant thereon. The seller shall also provide , and deliver for test, free of charge, at such place other than his premises as the Inspecting officer may specify such material or stores as he may require for tests for which seller does not have the facilities or for special/ independent tests. In the event of rejection of stores or any part thereof by the Inspecting officer basis testing outside owing to lack of test facility at sellers premises ,the seller shall, on demand, pay to the buyer the costs incurred in the inspection and/or test. Cost of test shall be assessed at the rate charged by the Laboratory to private persons for similar work. Inspector shall have the right to put all the stores or materials forming part of the same or any part thereof to such tests as he may like fit and proper as per QAP/governing specification . The seller shall not be entitled to object on any ground whatsoever to the method of testing adopted by the Inspecting officer .. Unless otherwise provided for in the contract, the quantity of the stores or materials expended in test will be borne by seller . Inspecting officer is the Final Authority to Certify Performance / accept the consignment . The Inspecting officer’s decision as regards the rejection shall be final and binding on the seller. The seller shall if so required at his own expense mark or permit the Inspecing officer to mark all the approved stores with a recognised Government or purchaser's mark.

Pre-dispatch inspection at Seller premises (Fee/Charges to be borne by the BUYER): Before dispatch, the goods will be inspected by Buyer / Consignee or their Authorized Representative or by Nominated External Inspection Agency (independently or jointly with Buyer or Consignee as decided by the Buyer) at Seller premises (or at designated place for inspection as declared / communicated by the seller) for their compliance to the contract specifications. Fee/Charges taken by the External inspection Agency and any external laboratories testing charges shall be borne by the Buyer. For in-house testing, the Sellers will provide necessary facilities free of cost. Seller shall notify the Buyer through e-mail about readiness of goods for pre-dispatch inspection and Buyer will notify the Seller about the Authorized Representative/ Nominated External Inspection Agency and the date for testing. The goods would be dispatched to consignee only after clearance in pre-dispatch inspection. Consignee's right of rejection as per GTC in respect of the goods finally received at his location shall in no way be limited or waived by reason of the goods having previously been inspected, tested and passed by Buyer/ Consignee or its Nominated External Inspection Agency prior to the goods' shipment. While bidding, the sellers should take into account 7 days for inspection from the date of email offering the goods for inspection. Any delay in inspection beyond 7 days shall be on the part of the buyer and shall be regularised without Liquidated Damages. When there is requirement of submission the advance sample, the seller shall inform the buyer promptly through emails about the date of submission of sample to the buyer nominated Inspection agency.

Testing of Sample: The testing of advance sample and bulk sample during PDI will be carried at the designated AHSP labs.When testing facilities are not available, the facilities of Govt labs/NABL/Accredited labs will be utilized. The testing charges outside the designated AHSP labs to be borne by seller's.

  • 31.Sample Clause After award of contract – Successful Bidder shall have to get advance sample approved from buyer before bulk manufacturing / starting bulk supplies. Successful Bidder shall submit 10 samples for Buyer's approval, within 10 days of award of contract. Buyer shall, as per contract specifications framework, either approve the advance sample or will provide complete list of modification required in the sample within 10 days of receipt of advance sample. Seller shall be required to ensure supply as per approved sample with modifications as communicated by Buyer. If there is delay from buyer side in approval of advance sample – the delivery period shall be refixed without LD for the period of delay in sample approval. In case, the sample is found to have major deviations / not conforming to the Contract specifications, the buyer at its discretion may call for fresh samples for approval before allowing bulk supplies or may terminate the contract after notifying the deviations to the seller. Unless otherwise provided in the contract, all samples required for test shall be supplied by the contractor free of cost. Where under the contract, the contractor is required to submit an advance sample, any expenses incurred by the contractor on or in connection with the production of stores in bulk, before the sample has been approved unconditionally shall be borne by the Seller and he shall not claim any compensation in the event of such sample being found unacceptable by the Buyer / Consignee.
  • 32.Sample Clause For clothing and allied items, if pre-dispatch Inspection clause has been selected in the Bid, the Inspection Agency shall forward sample from the accepted lot duly identified/ sealed by it, as Reference Sample to each consignee (one reference sample per consignee) for comparing the lot received at consignee end with such reference sample. Such reference samples will be treated as part of supplied quantity from the lot and cost shall be borne by the Buyer.

Bidder / OEM has to give an undertaking that after expiry of warranty period, it will provide AMC Service for next 5 years for the offered products at the rate not more than 10 % of contract price per annum. Buyer reserves the right to enter into an AMC agreement ( covering preventive maintenance and servicing)with the Successful Bidder / OEM after expiry of the Warranty period at rate as mentioned above and the payment for the AMC charges would be made Monthly after rendering of the AMC Services of the relevant AMC period. Performance Security of the successful bidder shall be forfeited if it fails to accept the AMC contract when called upon by the buyer. The original Performance Security of contract will be returned only after submission and verification of AMC Performance Security for 10% of total AMC value valid up to AMC period plus 2 months (if there is no other claim). (Undertaking of acceptance to be uploaded with bid).

Bidder / OEM has to give an undertaking that after expiry of warranty period, it will provide Comprehensive Maintenance Service for next 5 years for the offered products at the rate not more than 20 % of contract price per annum. Buyer reserves the right to enter into a CMC agreement with the Successful Bidder / OEM after expiry of the Warranty period at above mentioned rate and the payment for the CMC charges would be made Monthly after rendering of the CMC Services of the relevant CMC period. Performance Security of the successful bidder shall be forfeited if it fails to accept the CMC contract when called upon by the buyer. CMC would include cost of 500 (Upload the undertaking). The original Performance Security of contract will be returned only after submission and verification of AMC Performance Security for 10% of total CMC value valid up to CMC period plus 2 months (if there is no other claim).

Warranty period of the supplied products shall be 5 years from the date of final acceptance of goods or after completion of installation, commissioning & testing of goods (if included in the scope of supply), at consignee location. OEM Warranty certificates must be submitted by Successful Bidder at the time of delivery of Goods. The seller should guarantee the rectification of goods in case of any break down during the guarantee period. Seller should have well established Installation, Commissioning, Training, Troubleshooting and Maintenance Service group in INDIA for attending the after sales service. Details of Service Centres near consignee destinations are to be uploaded along with the bid.

Over and above the normal Warranty terms as per GeM GTC, the successful bidder / OEM shall have to provide Comprehensive Warranty during the entire Standard warranty period as per contract. : The comprehensive warranty shall be covering the following scope As per Terms and Conditons and BID documents (Upload an undertaking with the bid confirming compliance by the bidder if Bidder is taking onus of this compliance. In case OEM is taking onus of this compliance, OEM undertaking is to be uploaded along with Bidder undertaking)

Successful bidder will have to ensure that adequate number of dedicated technical service personals / engineers are designated / deployed for attending to the Service Request in a time bound manner and for ensuring Timely Servicing / rectification of defects during warranty period, as per Service level agreement indicated in the relevant clause of the bid.

Timely Servicing / rectification of defects during warranty period: After having been notified of the defects / service requirement during warranty period, Seller has to complete the required Service / Rectification within 15 days time limit. If the Seller fails to complete service / rectification with defined time limit, a penalty of 0.5% of Unit Price of the product shall be charged as penalty for each week of delay from the seller. Seller can deposit the penalty with the Buyer directly else the Buyer shall have a right to recover all such penalty amount from the Performance Security (PBG).Cumulative Penalty cannot exceed more than 10% of the total contract value after which the Buyer shall have the right to get the service / rectification done from alternate sources at the risk and cost of the Seller besides forfeiture of PBG. Seller shall be liable to re-imberse the cost of such service / rectification to the Buyer.

Similar open tenders

Soonest first

Search similar in the explorerFind this tender in the explorer

Open on GeM