Browse all bids
GeMOpenGoodsBidBOQ

Fittings512627019

Mangalore Refinery & Petrochemicals Limited

Ministry of Petroleum and Natural Gas › Materials Department › Refinery Division-mangalore Refinery & Petrochemicals Ltd, Kuthethoor,mangal…

Delivers to

Dakshina Kannada, Karnataka

Overview

10 facts from the tender

Ministry of Petroleum and Natural Gas published this goods tender on GeM on 14 Oct 2026, for Dakshina Kannada, Karnataka. No EMD is required. It closes on 24 Oct 2026, 7:00 pm IST. Bid number GEM/2026/B/8161817.

Timeline

  1. Published14 Oct 2026 · 6:03 pm

Bidding

Bid type
Bid
Evaluation method
Total value wise evaluation
Packet type
Two Packet Bid
Reverse auction
No
Total quantity
430

Buyer

Created by
PSTALIN_PROJECTS
Location
Dakshina Kannada · Karnataka
Portal
GeM

Important dates

Published
14 Oct 2026, 6:03 pm IST
Closes
24 Oct 2026, 7:00 pm IST

Items & delivery

39 items · 1 delivery location

Delivery location · all items

575030,Kuthethoor via Katipalla, Mangalore

Showing 39 of 39
01REDUCER_Size-2 Inch X 1 And Half Inch NB, Concentric_Spec_B5AQuantity2Delivery30 daysDetailsClose
Delivery
30 days
02REDUCER_Size-1 And Half Inch X 1 Inch NB_Spec_A1KQuantity2Delivery30 daysDetailsClose
Delivery
30 days
03REDUCER_Size-2 Inch X 1 Inch NB_ASTM A 234_Spec_A3AQuantity4Delivery30 daysDetailsClose
Delivery
30 days
04REDUCER_Size-2 Inch X 1 Inch NB_ASTM A 105_Spec_J3AQuantity2Delivery30 daysDetailsClose
Delivery
30 days
05ELBOW 90 Degree_Size - 10 Inch NB_Spec A3AQuantity10Delivery30 daysDetailsClose
Delivery
30 days
06ELBOW 90 Degree_Size - 6 Inch NB_Spec A3AQuantity10Delivery30 daysDetailsClose
Delivery
30 days
07ELBOW 90 Degree_Size - 2 Inch NB_Grade Of Material-ASTM A 234 Gr.WPB , SMLS, Sch.80_Spec B5AQuantity15Delivery30 daysDetailsClose
Delivery
30 days
08ELBOW 90 Degree_Size - 1 Inch NB_Grade Of Material-ASTM A 105, SW_Spec A3AQuantity20Delivery30 daysDetailsClose
Delivery
30 days
09ELBOW 90 Degree_Size - 1 Inch NB_Grade Of Material-ASTM A 105_Galv_Spec J3AQuantity20Delivery30 daysDetailsClose
Delivery
30 days
10ELBOW 90 Degree_Size - 1 Inch NB_Grade Of Material- ASTM A 182 SS 304, SW_Spec A1KQuantity10Delivery30 daysDetailsClose
Delivery
30 days
11ELBOW 90 Degree_Size - 2 Inch NB_Grade Of Material-ASTM A 234 Gr.WPB , SMLS, Sch.40_Spec A2AQuantity8Delivery30 daysDetailsClose
Delivery
30 days
12ELBOW 45 Degree_Size - 6 Inch NB_Spec A3AQuantity2Delivery30 daysDetailsClose
Delivery
30 days
13ELBOW 45 Degree_Size - 2 Inch NB_Grade Of Material-ASTM A 234 Gr.WPB , Sch. XS_Spec B5AQuantity14Delivery30 daysDetailsClose
Delivery
30 days
14ELBOW 45 Degree_Size - 1 Inch NB_Grade Of Material-ASTM A 105, SW_Spec A3AQuantity10Delivery30 daysDetailsClose
Delivery
30 days
15ELBOW 45 Degree_Size - 1 Inch NB_Grade Of Material-ASTM A 105 Galv,SW_Spec J3AQuantity2Delivery30 daysDetailsClose
Delivery
30 days
16ELBOW 45 Degree_Size - 1 Inch NB_Grade Of Material- ASTM A 182, SS 304, SW_Spec A1KQuantity2Delivery30 daysDetailsClose
Delivery
30 days
17ELBOW 45 Degree_Size - 2 Inch NB_Grade Of Material-ASTM A 234 Gr.WPB , Sch. 40_Spec A2AQuantity2Delivery30 daysDetailsClose
Delivery
30 days
18FLANGES_Size- 6 Inch NB_Grade Of Material-ASTM A 105, Class 150_Spec_A3AQuantity10Delivery30 daysDetailsClose
Delivery
30 days
19FLANGES_Size- 2 Inch NB_Grade Of Material-ASTM A 105, Class 150_Spec_A3AQuantity6Delivery30 daysDetailsClose
Delivery
30 days
20FLANGES_Size- 2 Inch NB_Grade Of Material-ASTM A 105, Class 300_Spec_B5AQuantity6Delivery30 daysDetailsClose
Delivery
30 days
21FLANGES_Size- 1 And Half Inch NB_Grade Of Material-ASTM A 105, Class 300_Spec_B5AQuantity6Delivery30 daysDetailsClose
Delivery
30 days
22FLANGES_Size- 1 Inch NB_Grade Of Material-ASTM A 182 SS 304, Class 150_Spec_A1KQuantity6Delivery30 daysDetailsClose
Delivery
30 days
23FLANGES_Size- 1 Inch NB_GALV_Grade Of Material-ASTM A 105_GALV_ Class 150_Spec_J3AQuantity6Delivery30 daysDetailsClose
Delivery
30 days
24FLANGES_Size- 2 Inch NB_Grade Of Material-ASTM A 105, Class 150_Spec_A2AQuantity6Delivery30 daysDetailsClose
Delivery
30 days
25FLANGES_Size- 0.75 Inch NB_Grade Of Material-ASTM A 105, Class 300_Spec_B5AQuantity20Delivery30 daysDetailsClose
Delivery
30 days
26Spectacle Blind_Size-2 Inch NB, Grade Of Material-ASTM A 105 , Class 300_Spec_B5AQuantity2Delivery30 daysDetailsClose
Delivery
30 days
27BLIND FLANGES_Size- 6 Inch NB_Grade Of Material-ASTM A 105, Class 150_A3AQuantity2Delivery30 daysDetailsClose
Delivery
30 days
28BLIND FLANGES_Size- 0.75 Inch NB_Grade Of Material-ASTM A 105 , Class 300_B5AQuantity20Delivery30 daysDetailsClose
Delivery
30 days
29SOCKET_Size- 0.75 Inch NB_Grade Of Material-ASTM A 105, SW_Spec_A3AQuantity20Delivery30 daysDetailsClose
Delivery
30 days
30SOCKET_Size-1 Inch NB_Grade Of Material-ASTM A 105, SW_Spec_A3AQuantity100Delivery30 daysDetailsClose
Delivery
30 days
31SOCKET_Size-1 And Half Inch Inch NB_Grade Of Material-ASTM A 105, SW_Spec_A3AQuantity10Delivery30 daysDetailsClose
Delivery
30 days
32SOCKET_Size- 0.75 Inch NB_Grade Of Material-ASTM A 182, SS304, SW_Spec_A1KQuantity10Delivery30 daysDetailsClose
Delivery
30 days
33SOCKET_Size-1 Inch NB_Grade Of Material-ASTM A 182, SS304, SW_Spec_A1KQuantity25Delivery30 daysDetailsClose
Delivery
30 days
34SOCKET_Size-1 And Half Inch NB_Grade Of Material-ASTM A 182, SS304, SW_Spec_A1KQuantity5Delivery30 daysDetailsClose
Delivery
30 days
35UNEQUAL TEE_BRANCH CONNECTION_Size-1 Inch X 0.75 Inch NB_Grade Of Material- ASTM A 105, SW_Spec_B5AQuantity10Delivery30 daysDetailsClose
Delivery
30 days
36UNEQUAL TEE_BRANCH CONNECTION_Size-1 And Half Inch X 0.75 Inch NB_Grade Of Material-ASTM A 105, SW_Spec_B5AQuantity5Delivery30 daysDetailsClose
Delivery
30 days
37HALF COUPLING_Size- 0.75 Inch NB_Grade Of Material-ASTM A 105, SW_Spec_B5AQuantity10Delivery30 daysDetailsClose
Delivery
30 days
38HALF COUPLING_Size- 1 Inch NB_Grade Of Material-ASTM A 105, SW_Spec_B5AQuantity5Delivery30 daysDetailsClose
Delivery
30 days
39HALF COUPLING_Size- 0.75 Inch NB SOCKET_Grade Of Material-ASTM A 182, SS304, SW_Spec_A1KQuantity5Delivery30 daysDetailsClose
Delivery
30 days

Tender documents

Bid files and supporting documents, linked directly from GeM.

Policy & contract references

Documents you must submit

  • Experience Criteria
  • Certificate (Requested in ATC)
  • OEM Authorization Certificate
  • Additional Doc 1 (Requested in ATC)
  • Additional Doc 2 (Requested in ATC)

Eligibility

Experience & turnover exemptions

Exemptions depend on the evidence and conditions specified in the bid.

Preferences & relaxations

  • MSE purchase preference
  • MII preference
  • Class-1/2 local suppliers
  • EMD exemption
  • Inspection required: no

Check each criterion against the tender notice before you bid.

Commercial conditions

EMD
Not required
Performance guarantee
5% for 21 months
Offer validity
120 days

Payment terms

Payments shall be made to the Seller within 10 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

View PDF · p. 4

Buyer requirements & conditions

Buyer-added conditions from the bid document.

OPTION CLAUSE: The Purchaser reserves the right to increase or decrease the quantity to be ordered up to 25 percent of bid quantity at the time of placement of contract. The purchaser also reserves the right to increase the ordered quantity up to 25% of the contracted quantity during the currency of the contract at the contracted rates. The delivery period of quantity shall commence from the last date of original delivery order and in cases where option clause is exercised during the extended delivery period the additional time shall commence from the last date of extended delivery period. The additional delivery time shall be (Increased quantity ÷ Original quantity) × Original delivery period (in days), subject to minimum of 30 days. If the original delivery period is less than 30 days, the additional time equals the original delivery period. The Purchaser may extend this calculated delivery duration up to the original delivery period while exercising the option clause. Bidders must comply with these terms.

02

Buyer Added Bid Specific ATC

View PDF · p. 26

Buyer Added text based ATC clauses 1.0 BID QUALIFICATION CRITERIA (BQC)- Technical Criteria 1.1 The bidder shall be either

  • a)Indian manufacturer of Carbon Steel (CS) Pipe fittings/ Stainless Steel (SS) pipe fittings su pplied to any industries;

(OR)

  • b)Authorized Agent/Authorized Dealer/Channel Partner of manufacturer of Carbon Steel
  • (CS)Pipe fittings/ Stainless Steel (SS) pipe fittings supplied to any Industries.

(OR)

  • c)Supplier/Vendor/Agency/firms not having authorisation from manufacturer but havin g experience in the supply of Carbon Steel (CS) Pipe fittings/ Stainless Steel (SS) pipe fittings to Petrochemical /Refinery Projects within India. 1.2 The bidder should have successfully executed (**) one purchase order for t he Supply of Carbon Steel (CS) Pipe fittings/Stainless Steel (SS) pip e fittings for a value not less than Rs. 3.0 Lakhs (excluding GST) in the l ast 7 years period ending the last day of the month previous to the one in w hich this tender is floated. Relevant PO Copy and Invoice Copy/ Lorry Receipt (LR) copy/ Completion Certificate/satisfactory Performance certificate/Payment advice against t he invoice/ Third party inspection certificate release note as a document ary evidence supporting the execution of this order to be attached along with technical bid. Note-1: (**) (i) In case more than one contract is emanating against one tender, al l such individual contracts are to be considered as single contract for evalu ation of credential of a bidder for meeting their experience criteria. (**) (ii) Further in case of rate contract, cumulative value of all release orders emanating from one rate contract shall be considered as single cont ract for evaluation of credential of a bidder for meeting their experience cri teria. Note 2:
  • (i)A Job executed by a Bidder for its own plant/ projects cannot be consid ered as experience for the purpose of meeting requirement of BEC of th e tender. However, jobs executed for Subsidiary/ Fellow subsidiary / Hol ding company will be considered as experience for the purpose of meeti ng BEC subject to submission of tax paid invoice (s) duly certified by St atutory Auditor of the Bidder towards payments of statutory tax in supp ort of the job executed for Subsidiary /Fellow subsidiary / Holding compa ny. Such Bidders to submit these documents in addition to the documen ts specified to meet BEC.
  • (ii)A job completed by the bidder as a sub-contractor can be accepted ag ainst the submission of the following documents in support of meeting B EC.
  • (a)Copy of work order along with the schedule of rates by main co ntractor.
  • (b)Copies of completion certificates from the end user/Owner/PMC and also from the main contractor. The completion certificate shal l have details like work order no/date, brief scope of work, ordere d & executed value of job, completion date etc., However, in case bidder is not able to furnish the completion certi ficates from the end user/Owner/PMC in his name then completio n certificate issued in the name of main contractor shall also cons idered as a proof of completion. Documents Required: BEC Clause no. Description Documents required for qualification Technical criteria - Documents Required 1.0 Experience criteria Documents in supp ort of clause no. 1. 1 &1.2 under tech nical criteria
  • (i)Relevant PO Copy and Invoice Copy/ Lorry Receipt (LR) copy/ Completion Ce rtificate/satisfactory Performance certif icate/Payment advice against the invoi ce/ Third party inspection certificate rel ease note as a documentary evidence supporting the execution of this order t o be attached along with technical bid Note: The completion certificate shall have det ails like work order number & date, brief s cope of work, ordered & executed value o f job, completion date etc.
  • (ii)In absence of complete details in the com pletion certificate as required to meet BE C, other supporting documents like owner /consultant certified final/pre final bill to b e submitted which will also be treated as part of completion certificate. 1.0 Note 2 (i) Jobs executed f or Subsidiary / Fello w subsidiary / Holdi ng company Tax paid invoice(s) duly certified by statutory auditor of the bidder towards payments of sta tutory tax in support of the job executed for S ubsidiary / Fellow subsidiary /Holding compan
  • y.1.0 Note 2 (ii) Sub-Contractor As mentioned in cl. Note 2 (ii) above. Note:
  • a.Bidders are required to submit all such past experience(s) (PTR) meeting the BEC along with relevant supporting documents in the first instance itself, along with the bid.
  • b.Any other documents for meeting the BEC requirements shall be submitted along with Techno Commercial Bid (Part-I) Accordingly, only such past experience(s) shall be considered for qualificat ion, details of which are provided in the bid by the bidder and subsequentl y no additional past experience (PTR) shall be sought from the bidder. Note 1:
  • a)Relaxation to MSE/ Start-up bidder: MSE: In line with the Government policy, qualified Micro and Small Scale Enterprises (MSEs) will be given relaxation up to 15% on prior exper ience. (For example, if BQC value applicable to other than MSE bidders is R
  • s.100/-, the same shall be Rs. 85/- for MSE bidders). Start Up: No relaxation in the prior Turnover and & experience criteria f or Startups for this tender due to Public Safety, Health, Critical Safety, Op erations & equipment etc.
  • b)Holiday / Negative listing: The bidder should not be under blac klist/Holiday list of MRPL or Ministry of Petroleum & Natural Gas (Mo PNG) or should not have been debarred by orders issued by DoE. Th e Bidder should submit an undertaking to this effect along with the technical bid.
  • c)Bidders are required to submit all such past experience(s) ( PTR) meeting the BQC (Cl. No 1.0 above) along with relevant supporting documents in the first instance itself, along with t he bid. However, MRPL/MECON reserves the right to seek any additional supporting documents for meeting the BQC for onl y those past experiences (PTR) submitted along with the bid by email/portal. Accordingly, only such past experience(s) sh all be considered for qualification, details of which are provid ed in the bid by the bidder and subsequently no additional p ast experience (PTR) shall be sought from the bidder.
  • d)Joint venture/ Consortium bids shall not be permitted for th is tender
  • e)Procurement from A Bidder Which Shares a Land Border wit h India Compliance of Restrictions under Rule 144 (xi) of GFR 2017 as per DOE Order (Public Procurement No.4) dated 23.02.2023 (as ame nded from time to time) –Refer GeM GTC. Undertaking (format attached) with respect to Compliance of Restri ctions for Countries which share land border with India – as stipulat ed by Govt. of India.
  • f)In absence of requisite documents MRPL//MECON reserve th e right to reject the bid without making any reference to the bidder. .
03

Buyer Added Bid Specific ATC

View PDF · p. 30

Buyer uploaded ATC document Click here to view the file.

Similar open tenders

Soonest first

Search similar in the explorerFind this tender in the explorer

Open on GeM