Browse all bids
GeMOpenGoodsReverse auction

Chair Or Bench Or Stool (Handicraft) (V2), Sofa Set Or Couch (Handicraft) (V2), Dressing Table, Modular Table / Meeting Table / Centre Table (V2), Wooden Shelf / Case / Rack / Credenza / Modular Stor…

Indian Army

Ministry of Defence › Department of Military Affairs

Delivers to

Kamrup, Assam

Overview

11 facts from the tender

Ministry of Defence published this goods tender on GeM on 10 Oct 2026, for Kamrup, Assam. The estimated value is ₹14.1 L and the EMD is ₹40,000. It closes on 12 Oct 2026, 6:00 pm IST. Bid number GEM/2026/R/749808.

From the bid document

TimelineBid → reverse auction

  1. Bid published2 Sep 2026
  2. Bid closed21 Sep 2026 · 3:00 pm
  3. RA issued9 Oct 2026
  4. RA ends12 Oct 2026 · 6:00 pm

Bidding

Bid type
Reverse auction
Evaluation method
Total value wise evaluation
Packet type
Two Packet Bid
Reverse auction
Yes, H1-Highest Priced Bid Elimination
Auction for bid
GEM/2026/B/7949255
Total quantity
146

Buyer

Created by
Sbsotez@2019
Location
Kamrup · Assam
Portal
GeM

Important dates

Published
10 Oct 2026, 7:00 pm IST
Closes
12 Oct 2026, 6:00 pm IST

Bid & reverse auction

This reverse auction is the price round of bid GEM/2026/B/7949255. GeM's auction document lists only the auction, so the items, delivery, eligibility and buyer terms below come from the bid document and are marked From the bid document.

Bid document (PDF) Reverse auction document (PDF)

Items & delivery

From the bid document

9 items · Address masked by GeM

Delivery location · all items

***********Kamrup

GeM masks the full address in this document.
Showing 9 of 9
01Chair Or Bench Or Stool (Handicraft) (V2)Quantity26 piecesDelivery30 daysDetailsClose
Delivery
30 days

Specifications & requirements

Specification Name
बड के िलए आवNयक अनुमत मूWय /Bid Requirement (Allowed Values)
Product Category
Chair (Single Seat with Backrest)
No of Seat
1 Seater
Frame/Base Material
Sheesham Wood, Teak Wood
Seat Shape
Square
Scope of Handicraft
Finishing Work Only
Foldable Feature
No
Armrest Availability
No
Cushion Availability
Yes
02Sofa Set Or Couch (Handicraft) (V2)Quantity30 piecesDelivery30 daysDetailsClose
Delivery
30 days

Specifications & requirements

Specification Name
बड के िलए आवNयक अनुमत मूWय /Bid Requirement (Allowed Values)
Number of seats in the Sofa/Couch
1 - seater sofa/couch
Armrest available
Yes
Backrest available
Yes
Number of cushions
0, 1
Material of Sofa/Couch frame
Sheesham Wood
Scope of Handicraft
Finishing Work Only
Upholstery material
Tweed
03Dressing TableQuantity13 piecesDelivery30 daysDetailsClose
Delivery
30 days

Specifications & requirements

Specification Name
बड के िलए आवNयक अनुमत मूWय /Bid Requirement (Allowed Values)
Mode of Supply
Assembled Ready To Use
Design of Dressing table
With drawers and cupboard
Base of dressing table
Rectangular wooden frame
Number of side mirror
1 number
Material specification
Prelaminated particle board of grade II type III of IS 12823/Latest.both side laminated. outer side laminated with shade matching with top shade and fascia shade and having balancing laminate of 0.5mm thick on other side
Material thickness of complete body, Fascia and drawer/cupboard
19.0 (millimeter)
Material thickness for back, partition and drawer/cupboard bottom ± 2mm
12.0 (millimeter)
Mirror side frame material thickness±2mm
25mm
Length of side mirror
1220 mm
Overall height of dressing table ±10mm
1755.0 (millimeter)
Width of dressing table ±10mm
840.0 (millimeter)
Depth of dressing table ±10mm
380.0 (millimeter)
Length of mirror
1220.0 (millimeter)
Specification Name
बड के िलए आवNयक अनुमत मूWय /Bid Requirement (Allowed Values)
Width of mirror
560.0 (millimeter)
Thickness of mirror
8, 10, 12, 14 Or higher (millimeter)
Warranty period in number of years
2, 3 Or higher
Product having BIFMA certification
NO
04Modular Table / Meeting Table / Centre Table (V2)Quantity16 piecesDelivery30 daysDetailsClose
Delivery
30 days

Specifications & requirements

Specification Name
बड के िलए आवNयक अनुमत मूWय /Bid Requirement (Allowed Values)
Table Top Material Type
Particle Board, MDF Board, Marine Ply, BWP Ply, MR (Moisture Resistant) Ply Or higher
Availability of Table top edge
Yes
Shape of Table Top (For Circle and Square, Length and Depth must be same)
Rectangle
Width of Table Top (Tolerance ±50 mm)
1200 mm
Depth of Table Top (Tolerance ± 50 mm)
600 mm
Height of Table Top Adjustable
No
Material Type in Table Understructure
Wooden/Engineer Wood Understructure
Specification Name
बड के िलए आवNयक अनुमत मूWय /Bid Requirement (Allowed Values)
Support Type in Table Understructure
Leg
Material of Table Understructure
Particle Board, MDF Board, Marine Ply, MR (Moisture Resistant) Ply, BWP Ply Or higher
Table Understructure Metal Legs Cross Section (Approx)
NA
Thickness of Metal Legs Cross Section
NA
Thickness of Wooden Leg
18 mm
Availability of modesty panel
No
Availability of Pedestal/Storage Unit
Yes
05Modular Table / Meeting Table / Centre Table (V2)Quantity30 piecesDelivery30 daysDetailsClose
Delivery
30 days

Specifications & requirements

Specification Name
बड के िलए आवNयक अनुमत मूWय /Bid Requirement (Allowed Values)
Table Top Material Type
MDF Board, Marine Ply, BWP Ply, MR (Moisture Resistant) Ply Or higher
Availability of Table top edge
Yes
Shape of Table Top (For Circle and Square, Length and Depth must be same)
Rectangle
Width of Table Top (Tolerance ±50 mm)
1500 mm
Specification Name
बड के िलए आवNयक अनुमत मूWय /Bid Requirement (Allowed Values)
Depth of Table Top (Tolerance ± 50 mm)
900 mm
Height of Table Top Adjustable
No
Material Type in Table Understructure
Wooden/Engineer Wood Understructure
Support Type in Table Understructure
Leg
Material of Table Understructure
MDF Board, Marine Ply, MR (Moisture Resistant) Ply, BWP Ply Or higher
Table Understructure Metal Legs Cross Section (Approx)
NA
Thickness of Metal Legs Cross Section
NA
Thickness of Wooden Leg/Gable (Tolerance ±2 mm)
25 mm
Availability of modesty panel
No
Availability of Pedestal/Storage Unit
No
06Wooden Shelf / Case / Rack / Credenza / Modular Storage (V2)Quantity1 piecesDelivery30 daysDetailsClose
Delivery
30 days

Specifications & requirements

Specification Name
बड के िलए आवNयक अनुमत मूWय /Bid Requirement (Allowed Values)
Type of Product
Case or Storage Unit (unit with door)
Specification Name
बड के िलए आवNयक अनुमत मूWय /Bid Requirement (Allowed Values)
Mounting Positioning of Product
Floor Standing
Availability of Doors
Yes
Availability of Drawers
Yes
Availability of Locks
No
Type of lock
NA
Overall Height of Unit (in mm)
700 - 750
Overall Width of Unit (in mm)
1000 - 1050, 1050 - 1100, 1150 - 1200
Depth of Unit (in mm)
500 - 550
Material of Top Section
Particle Board, MDF Board, Marine Ply, MR (Moisture Resistant) Ply, BWP Ply Or higher
Availability of Cushion in Top Section
No
Material of Bottom Section
Particle Board, MDF Board, Marine Ply, MR (Moisture Resistant) Ply, BWP Ply Or higher
Availability of legs/stand
No
Type of Sides Section
Gable / Sheet
Availability of Back Section
Yes
07Modular Table / Meeting Table / Centre Table (V2)Quantity15 piecesDelivery30 daysDetailsClose
Delivery
30 days

Specifications & requirements

Specification Name
बड के िलए आवNयक अनुमत मूWय /Bid Requirement (Allowed Values)
Table Top Material Type
Particle Board, MDF Board, Marine Ply, BWP Ply, MR (Moisture Resistant) Ply, Glass Or higher
Availability of Table top edge
Yes
Shape of Table Top (For Circle and Square, Length and Depth must be same)
Rectangle
Width of Table Top (Tolerance ±50 mm)
1200 mm
Depth of Table Top (Tolerance ± 50 mm)
900 mm
Height of Table Top Adjustable
No
Material Type in Table Understructure
Wooden/Engineer Wood Understructure
Support Type in Table Understructure
Gable
Material of Table Understructure
Particle Board, MDF Board, Marine Ply, MR (Moisture Resistant) Ply, BWP Ply Or higher
Table Understructure Metal Legs Cross Section (Approx)
NA
Thickness of Metal Legs Cross Section
NA
Thickness of Wooden Leg/Gable (Tolerance ±2 mm)
18 mm
Availability of modesty panel
Yes
Availability of Pedestal/Storage Unit
Yes
Type of Pedestal/Storage Unit
Fixed (Storage unit attached to table)
Positioning of Fixed Pedestal/Storage Unit
One Side
08Modular Table / Meeting Table / Centre Table (V2)Quantity8 piecesDelivery30 daysDetailsClose
Delivery
30 days

Specifications & requirements

Specification Name
बड के िलए आवNयक अनुमत मूWय /Bid Requirement (Allowed Values)
Table Top Material Type
MDF Board, Marine Ply, BWP Ply, MR (Moisture Resistant) Ply Or higher
Availability of Table top edge
Yes
Shape of Table Top (For Circle and Square, Length and Depth must be same)
Rectangle
Width of Table Top (Tolerance ±50 mm)
1800 mm
Depth of Table Top (Tolerance ± 50 mm)
900 mm
Height of Table Top Adjustable
No
Material Type in Table Understructure
Wooden/Engineer Wood Understructure
Support Type in Table Understructure
Gable
Material of Table Understructure
MDF Board, Marine Ply, MR (Moisture Resistant) Ply, BWP Ply Or higher
Table Understructure Metal Legs Cross Section (Approx)
NA
Thickness of Metal Legs Cross Section
NA
Thickness of Wooden Leg/Gable (Tolerance ±2 mm)
45 mm
Availability of modesty panel
Yes
Availability of Pedestal/Storage Unit
Yes
09Modular Table / Meeting Table / Centre Table (V2)Quantity7 piecesDelivery30 daysDetailsClose
Delivery
30 days

Specifications & requirements

Specification Name
बड के िलए आवNयक अनुमत मूWय /Bid Requirement (Allowed Values)
Table Top Material Type
Particle Board, MDF Board, Marine Ply, BWP Ply, MR (Moisture Resistant) Ply Or higher
Thickness of Table Top (Tolerance ±5 mm)
18 mm
Availability of Table top edge
No
Table Top Edges
NA
Shape of Table Top (For Circle and Square, Length and Depth must be same)
Rectangle
Width of Table Top (Tolerance ±50 mm)
750 mm
Depth of Table Top (Tolerance ± 50 mm)
600 mm
Height of Table Top Adjustable
No
Standard Height of Work Top/Minimum Height of Height Adjustable Work Top (Tolerance ± 20 mm)
750 mm
Maximum Height of Work Top (Tolerance ± 20 mm)
NA
Colour Family of Table Top
Brown
Material Type in Table Understructure
Metal Understructure
Support Type in Table Understructure
Leg
Material of Table Understructure
Mild Steel, Aluminium Or higher
Table Understructure Metal Legs Cross Section (Approx)
40 x 40 mm
Specification Name
बड के िलए आवNयक अनुमत मूWय /Bid Requirement (Allowed Values)
Thickness of Metal Legs Cross Section
0.8 mm, 1.6 mm
Thickness of Wooden Leg/Gable (Tolerance ±2 mm)
NA
Colour Family of Table Understructure
White
Availability of modesty panel
No
Material Type of Modesty Panel
NA
Length of Modesty Panel
NA
Height of Modesty Panel from Table Top
NA
Colour Family of Modesty Panel
NA
Availability of Pedestal/Storage Unit
No
Type of Pedestal/Storage Unit
NA
Positioning of Fixed Pedestal/Storage Unit
NA
Number of closed storage compartments
NA

C.सं./S.N o. · Document Title · Description · Sरवस %9भार के अनुसार जीएसट/Applicable i.r.o. Items

1 · Chair Dining MAP Offrs View · Chair dining offrs, MAP pattern as per E in C E6 MAP drawing on the subject · Chair Or Bench Or Stool (Handicraft) (V2)(26)

Tender documents

Bid files and supporting documents, linked directly from GeM.

Policy & contract references

Documents you must submit

  • Experience Criteria
  • Past Performance
  • Bidder Turnover
  • Certificate (Requested in ATC)
  • OEM Authorization Certificate
  • OEM Annual Turnover
Show all 8
  • Additional Doc 1 (Requested in ATC)
  • Compliance of BoQ specification and supporting document

Eligibility

From the bid and reverse-auction documents

Experience

3 years

Min. turnover

₹7 L

a year, 3-year average

OEM turnover

₹56 L

Past performance

50%

of the bid quantity

Experience & turnover exemptions

Micro & small enterprises (MSE)

No exemption
From the reverse auction
Exemption conditions

Exemptions depend on the evidence and conditions specified in the bid.

Preferences & relaxations

From the bid document

  • MSE purchase preference
  • MII preference
  • Class-1/2 local suppliers
  • EMD exemption: no
  • Inspection required: no

Check each criterion against the tender notice before you bid.

Commercial conditions

From the bid document

EMD
₹40,000
Performance guarantee
5% for 12 months
Offer validity
90 days

Reverse auction extension

From the reverse auction

If any seller submits the offer price during last 15 minutes of RA end time, then RA will be automatically extended for next 15 minutes from the last participation time. There is no limit on such RA extension cycle.

View PDF · p. 1

Buyer requirements & conditions

Buyer-added conditions from the bid and the reverse-auction documents.

From the bid document

Actual delivery (and Installation & Commissioning (if covered in scope of supply)) is to be done at following address BSO Yard Rangia GE Rangiya Rangia assam 785 001 .

Bidder financial standing: The bidder should not be under liquidation, court receivership or similar proceedings, should not be bankrupt. Bidder to upload undertaking to this effect with bid.

Bidders shall quote only those products (Part of Service delivery) in the bid which are not obsolete in the market and has at least 5 years residual market life i.e. the offered product shall not be declared end-of- life by the OEM before this period.

Bidders are advised to check applicable GST on their own before quoting. Buyer will not take any responsibility in this regards. GST reimbursement will be as per actuals or as per applicable rates (whichever is lower), subject to the maximum of quoted GST %.

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

  • a.Copy of PAN Card.
  • b.Copy of GSTIN.
  • c.Copy of Cancelled Cheque.
  • d.Copy of EFT Mandate duly certified by Bank.

Data Sheet of the product(s) offered in the bid, are to be uploaded along with the bid documents. Buyers can match and verify the Data Sheet with the product specifications offered. In case of any unexplained mismatch of technical parameters, the bid is liable for rejection.

Experience Criteria: The Bidder or its OEM {themselves or through reseller(s)} should have regularly, manufactured and supplied same or similar Category Products to any Central / State Govt Organization / PSU for 3 years before the bid opening date. Copies of relevant contracts to be submitted along with bid in support of having supplied some quantity during each of the year. In case of bunch bids, the primary product having highest value should meet this criterion.

Manufacturer Authorization:Wherever Authorised Distributors/service providers are submitting the bid, Authorisation Form /Certificate with OEM/Original Service Provider details such as name, designation, address, e-mail Id and Phone No. required to be furnished along with the bid

OPTION CLAUSE: The Purchaser reserves the right to increase or decrease the quantity to be ordered up to 50 percent of bid quantity at the time of placement of contract. The purchaser also reserves the right to increase the ordered quantity up to 50% of the contracted quantity during the currency of the contract at the contracted rates. The delivery period of quantity shall commence from the last date of original delivery order and in cases where option clause is exercised during the extended delivery period the additional time shall commence from the last date of extended delivery period. The additional delivery time shall be (Increased quantity ÷ Original quantity) × Original delivery period (in days), subject to minimum of 30 days. If the original delivery period is less than 30 days, the additional time equals the original delivery period. The Purchaser may extend this calculated delivery duration up to the original delivery period while exercising the option clause. Bidders must comply with these terms.

While generating invoice in GeM portal, the seller must upload scanned copy of GST invoice and the screenshot of GST portal confirming payment of GST.

  • 1.The Seller shall not assign the Contract in whole or part without obtaining the prior written consent of buyer.
  • 2.The Seller shall not sub-contract the Contract in whole or part to any entity without obtaining the prior written consent of buyer.
  • 3.The Seller shall, notwithstanding the consent and assignment/sub-contract, remain jointly and severally liable and responsible to buyer together with the assignee/ sub-contractor, for and in respect of the due performance of the Contract and the Sellers obligations there under.

Without prejudice to Buyer’s right to price adjustment by way of discount or any other right or remedy available to Buyer, Buyer may terminate the Contract or any part thereof by a written notice to the Seller, if:

  • i)The Seller fails to comply with any material term of the Contract. ii) The Seller informs Buyer of its inability to deliver the Material(s) or any part thereof within the stipulated Delivery Period or such inability otherwise becomes apparent. iii) The Seller fails to deliver the Material(s) or any part thereof within the stipulated Delivery Period and/or to replace/rectify any rejected or defective Material(s) promptly. iv) The Seller becomes bankrupt or goes into liquidation.
  • v)The Seller makes a general assignment for the benefit of creditors. vi) A receiver is appointed for any substantial property owned by the Seller. vii) The Seller has misrepresented to Buyer, acting on which misrepresentation Buyer has placed the Purchase Order on the Seller.
13

Scope of Supply

View PDF · p. 17

Scope of supply (Bid price to include all cost components) : Only supply of Goods

  • 14.Turnover Bidder Turn Over Criteria: The minimum average annual financial turnover of the bidder during the last three years, ending on 31st March of the previous financial year, should be as indicated in the bid document. Documentary evidence in the form of certified Audited Balance Sheets of relevant periods or a certificate from the Chartered Accountant / Cost Accountant indicating the turnover details for the relevant period shall be uploaded with the bid. In case the date of constitution / incorporation of the bidder is less than 3 year old, the average turnover in respect of the completed financial years after the date of constitution shall be taken into account for this criteria.
  • 15.Turnover OEM Turn Over Criteria: The minimum average annual financial turnover of the OEM of the offered product during the last three years, ending on 31st March of the previous financial year, should be as indicated in the bid document. Documentary evidence in the form of certified Audited Balance Sheets of relevant periods or a certificate from the Chartered Accountant / Cost Accountant indicating the turnover details for the relevant period shall be uploaded with the bid. In case the date of constitution / incorporation of the OEM is less than 3 year old, the average turnover in respect of the completed financial years after the date of constitution shall be taken into account for this criteria. In case of bunch bids, the OEM of CATEGORY RELATED TO primary product having highest bid value should meet this criterion.

Timely Servicing / rectification of defects during warranty period: After having been notified of the defects / service requirement during warranty period, Seller has to complete the required Service / Rectification within 7 days time limit. If the Seller fails to complete service / rectification with defined time limit, a penalty of 0.5% of Unit Price of the product shall be charged as penalty for each week of delay from the seller. Seller can deposit the penalty with the Buyer directly else the Buyer shall have a right to recover all such penalty amount from the Performance Security (PBG).Cumulative Penalty cannot exceed more than 10% of the total contract value after which the Buyer shall have the right to get the service / rectification done from alternate sources at the risk and cost of the Seller besides forfeiture of PBG. Seller shall be liable to re-imberse the cost of such service / rectification to the Buyer.

17

Certificates

View PDF · p. 18

Bidder's offer is liable to be rejected if they don't upload any of the certificates / documents sought in the Bid document, ATC and Corrigendum if any.

18

Certificates

View PDF · p. 18

To be eligible for award of contract, Bidder / OEM must possess following Certificates / Test Reports on the date of bid opening (to be uploaded with bid): All certificates as laid down in the bid documents .

  • 19.Sample Clause After award of contract – Successful Bidder shall have to get advance sample approved from buyer before bulk manufacturing / starting bulk supplies. Successful Bidder shall submit 1 samples for Buyer's approval, within 7 days of award of contract. Buyer shall, as per contract specifications framework, either approve the advance sample or will provide complete list of modification required in the sample within 7 days of receipt of advance sample. Seller shall be required to ensure supply as per approved sample with modifications as communicated by Buyer. If there is delay from buyer side in approval of advance sample – the delivery period shall be refixed without LD for the period of delay in sample approval. In case, the sample is found to have major deviations / not conforming to the Contract specifications, the buyer at its discretion may call for fresh samples for approval before allowing bulk supplies or may terminate the contract after notifying the deviations to the seller. Unless otherwise provided in the contract, all samples required for test shall be supplied by the contractor free of cost. Where under the contract, the contractor is required to submit an advance sample, any expenses incurred by the contractor on or in connection with the production of stores in bulk, before the sample has been approved unconditionally shall be borne by the Seller and he shall not claim any compensation in the event of such sample being found unacceptable by the Buyer / Consignee.
  • 20.Past Project Experience Proof for Past Experience and Project Experience clause: For fulfilling the experience criteria any one of the following documents may be considered as valid proof for meeting the experience criteria:a. Contract copy along with Invoice(s) with self-certification by the bidder that service/supplies against the invoices have been executed.b. Execution certificate by client with contract value.c. Any other document in support of contract execution like Third Party Inspection release note, etc.Proof for Past Experience and Project Experience clause: For fulfilling the experience criteria any one of the following documents may be considered as valid proof for meeting the experience criteria:a. Contract copy along with Invoice(s) with self-certification by the bidder that service/supplies against the invoices have been executed.b. Execution certificate by client with contract value.c. Any other document in support of contract execution like Third Party Inspection release note, etc.
  • 21.Past Project Experience The Bidder / OEM {themselves or through reseller(s)}, should have executed project for supply and installation / commissioning of same or similar Category Products during preceding 3 financial years (i.e. current year and three previous financial years) as on opening of bid, as per following criteria:
  • (i)Single order of at least 35% of estimated bid value; or
  • (ii)Two orders of at least 20% each of estimated bid value; or
  • (iii)Three orders of at least 15% each of estimated bid value. Satisfactory Performance certificate issued by respective Buyer Organization for the above Orders should be uploaded with bid. In case of bunch bids, the Category related to primary product having highest bid value should meet this criterion
22

Forms of EMD and PBG

View PDF · p. 19

Bidders can also submit the EMD with Account Payee Demand Draft in favour of CWE Tezpur payable at Tezpur . Bidder has to upload scanned copy / proof of the DD along with bid and has to ensure delivery of hardcopy to the Buyer within 5 days of Bid End date / Bid Opening date.

23

Forms of EMD and PBG

View PDF · p. 19

Bidders can also submit the EMD with Fixed Deposit Receipt made out or pledged in the name of A/C CWE Tezpur . The bank should certify on it that the deposit can be withdrawn only on the demand or with the sanction of the pledgee. For release of EMD, the FDR will be released in the favour of the bidder by the Buyer after making endorsement on the back of the FDR duly signed and stamped along with covering letter. Bidder has to upload scanned copy/ proof of the FDR along with bid and has to ensure delivery of hardcopy to the Buyer within 5 days of Bid End date/ Bid Opening date

24

Forms of EMD and PBG

View PDF · p. 19

Bidders can also submit the EMD with Banker’s Cheque in favour of CWE Tezpur payable at Tezpur . Bidder has to upload scanned copy / proof of the BC along with bid and has to ensure delivery of hardcopy to the Buyer within 5 days of Bid End date / Bid Opening date.

25

Forms of EMD and PBG

View PDF · p. 19

Successful Bidder can submit the Performance Security in the form of Account Payee Demand Draft also (besides PBG which is allowed as per GeM GTC). DD should be made in favour of CWE Tezpur payable at Tezpur . After award of contract, Successful Bidder can upload scanned copy of the DD in place of PBG and has to ensure delivery of hard copy to the original DD to the Buyer within 15 days of award of contract.

26

Forms of EMD and PBG

View PDF · p. 19

Successful Bidder can submit the Performance Security in the form of Fixed Deposit Receipt also (besides PBG which is allowed as per GeM GTC). FDR should be made out or pledged in the name of CWE Tezpur A/C (Name of the Seller). The bank should certify on it that the deposit can be withdrawn only on the demand or with the sanction of the pledgee. For release of Security Deposit, the FDR will be released in favour of bidder by the Buyer after making endorsement on the back of the FDR duly signed and stamped along with covering letter. Successful Bidder has to upload scanned copy of the FDR document in place of PBG and has to ensure delivery of hard copy of Original FDR to the Buyer within 15 days of award of contract.

27

Buyer Added Bid Specific ATC

View PDF · p. 20

Buyer Added text based ATC clauses The items being procured are specific to the MES and while the filters cover the broad specifications, but th e exact products require refinement of the filters. The bidders are required to mandatorily attend the pre-b id meeting organised by the Buyer to explain the specific requirements of the bid and the items required. All documents as asked for, must be loaded in the specific slot for uploading the same. If bidders load a ra ndom set of documents in all the upload slots then they will be summarily rejected. Liaison is required to be carried out with the consignee on the product (sample) bein g offered and the user modifications/ approval reqd .

28

Buyer Added Bid Specific ATC

View PDF · p. 20

Buyer uploaded ATC document Click here to view the file.

From the reverse auction

Reverse auction — offer validity

View PDF · p. 1

Participation by the bidder in RA process would be considered as their consent for extension in offer validity by 30 days by the date of RA initiation.

Similar open tenders

Soonest first

Search similar in the explorerFind this tender in the explorer

Open on GeM