Browse all bids
GeMOpenGoodsBidCustom item

BRG ASSY DIA 280 X 220 DRG 14035140007 V01 R07 WITH ADD. DRILLING OF BRG CAP DRG 34035840009 R01., BEARING BUSH FINISHED ( DIA 280 X 220) TO DRG. NO. 04035140006 VAR 00 REV 05., BEARING BUSH FINISHED…

Bharat Heavy Electricals Limited (bhel)

Ministry of Heavy Industries and Public Enterprises › Department of Heavy Industry › Hep Bhopal

Delivers to

Bhopal, Madhya Pradesh

Overview

10 facts from the tender

Ministry of Heavy Industries and Public Enterprises published this goods tender on GeM on 13 Oct 2026, for Bhopal, Madhya Pradesh. No EMD is required. It closes on 23 Oct 2026, 5:00 pm IST. Bid number GEM/2026/B/8151492.

Timeline

  1. Published13 Oct 2026 · 12:31 pm
  2. Reverse auctionIf the bid qualifies, after evaluation

Bidding

Bid type
Bid
Evaluation method
Item wise evaluation
Packet type
Two Packet Bid
Reverse auction
Yes, H1-Highest Priced Bid Elimination
Total quantity
28

Buyer

Created by
353_11_02
Location
Bhopal · Madhya Pradesh
Portal
GeM

Important dates

Published
13 Oct 2026, 12:31 pm IST
Closes
23 Oct 2026, 5:00 pm IST

Items & delivery

4 items · 1 delivery location

Delivery location · all items

462022,BHARAT HEAVY ELECTRICAL LTD, PIPLANI

Schedule 1

BRG ASSY DIA 280 X 220 DRG 14035140007 V01 R07 WITH ADD. DRILLING OF BRG CAP DRG 34035840009 R01.

Quantity4 pieces
Schedule
1
Delivery schedule · PDF page 6
G.सं./S.N
o.
परेषती/0रपो>टkग
अिधकार /Consignee
Reporting/Officer
पता/Address>डलीवर अनुसूची /Delivery Schedule अनुबंध
prarambh होने क तारख से >दनJ क सं=या म
/(In number of days from contract
start days)
1Arun Kumar462022,BHARAT HEAVY
ELECTRICAL LTD, PIPLANI
मा ा
/Quanti
ty
2
2
5ारंभ होने क
तारख से
>डलीवर
/Delivery
to start
after
>डलीवर
तक पूर
_____
कर ली जाए
/Delivery to
be
completed
by
90
150
0
5
View PDF · p. 6
Specifications & requirements · 1
ITC on GST
जीएसट उपकर कर Gे>डट /ITC on GST Cess
Schedule 2

BEARING BUSH FINISHED ( DIA 280 X 220) TO DRG. NO. 04035140006 VAR 00 REV 05.

Quantity6 pieces
Schedule
2
Delivery schedule · PDF page 7
G.सं./S.N
o.
परेषती/0रपो>टkग
अिधकार /Consignee
Reporting/Officer
पता/Address>डलीवर अनुसूची /Delivery Schedule अनुबंध
prarambh होने क तारख से >दनJ क सं=या म
/(In number of days from contract
start days)
1Arun Kumar462022,BHARAT HEAVY
ELECTRICAL LTD, PIPLANI
मा ा
/Quanti
ty
4
2
5ारंभ होने क
तारख से
>डलीवर
/Delivery
to start
after
>डलीवर
तक पूर
_____
कर ली जाए
/Delivery to
be
completed
by
90
150
0
5
View PDF · p. 7
Specifications & requirements · 1
ITC on GST
जीएसट उपकर कर Gे>डट /ITC on GST Cess
Schedule 3

BEARING BUSH FINISHED ( DIA 180 X 120) TO DRG. NO. 04035140008 VAR 00 REV 07.

Quantity8 pieces
Schedule
3
Delivery schedule · PDF page 8
G.सं./S.N
o.
परेषती/0रपो>टkग
अिधकार /Consignee
Reporting/Officer
पता/Address>डलीवर अनुसूची /Delivery Schedule अनुबंध
prarambh होने क तारख से >दनJ क सं=या म
/(In number of days from contract
start days)
1Arun Kumar462022,BHARAT HEAVY
ELECTRICAL LTD, PIPLANI
मा ा
/Quanti
ty
4
4
5ारंभ होने क
तारख से
>डलीवर
/Delivery
to start
after
>डलीवर
तक पूर
_____
कर ली जाए
/Delivery to
be
completed
by
90
150
0
5
View PDF · p. 8
Specifications & requirements · 1
ITC on GST
जीएसट उपकर कर Gे>डट /ITC on GST Cess
Schedule 4

BEARING BUSH FINISHED (DIA 180 X 150) TO DRG. NO. 14025840016 VAR 00 REV 06.

Quantity10 pieces
Schedule
4
Delivery schedule · PDF page 9
G.सं./S.N
o.
परेषती/0रपो>टkग
अिधकार /Consignee
Reporting/Officer
पता/Address>डलीवर अनुसूची /Delivery Schedule अनुबंध
prarambh होने क तारख से >दनJ क सं=या म
/(In number of days from contract
start days)
1Arun Kumar462022,BHARAT HEAVY
ELECTRICAL LTD, PIPLANI
मा ा
/Quanti
ty
6
4
5ारंभ होने क
तारख से
>डलीवर
/Delivery
to start
after
>डलीवर
तक पूर
_____
कर ली जाए
/Delivery to
be
completed
by
090
5150
View PDF · p. 9
Specifications & requirements · 1
ITC on GST
जीएसट उपकर कर Gे>डट /ITC on GST Cess

Tender documents

Bid files and supporting documents, linked directly from GeM.

Policy & contract references

Documents you must submit

  • Experience Criteria
  • Certificate (Requested in ATC)
  • OEM Authorization Certificate

Eligibility

Experience & turnover exemptions

Exemptions depend on the evidence and conditions specified in the bid.

Preferences & relaxations

  • MSE purchase preference
  • MII preference
  • Class-1/2 local suppliers
  • EMD exemption
  • Inspection required: no

Check each criterion against the tender notice before you bid.

Commercial conditions

EMD
Not required
Performance guarantee
Not required
Offer validity
90 days

Payment terms

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

View PDF · p. 2

Buyer requirements & conditions

Buyer-added conditions from the bid document.

OPTION CLAUSE: The Purchaser reserves the right to increase or decrease the quantity to be ordered up to 25 percent of bid quantity at the time of placement of contract. The purchaser also reserves the right to increase the ordered quantity up to 25% of the contracted quantity during the currency of the contract at the contracted rates. The delivery period of quantity shall commence from the last date of original delivery order and in cases where option clause is exercised during the extended delivery period the additional time shall commence from the last date of extended delivery period. The additional delivery time shall be (Increased quantity ÷ Original quantity) × Original delivery period (in days), subject to minimum of 30 days. If the original delivery period is less than 30 days, the additional time equals the original delivery period. The Purchaser may extend this calculated delivery duration up to the original delivery period while exercising the option clause. Bidders must comply with these terms.

Nominated Inspection Agency: On behalf of the Buyer organization, any one of the following Inspection Agency would be conducting inspection of stores before acceptance: Pre-dispatch Inspection at Seller Premises (applicable only if pre-dispatch inspection clause has been selected in ATC): BY BHEL/TPIA AS PER QAP NO. QA/MT/BOI/030 REV 02 FOR BRG. ASSY. & QA/MT/BOI/036 REV01 FOR BRG. BUSH. Post Receipt Inspection at consignee site before acceptance of stores: By BHEL QC at BHEL Bhopal (Note:both inspection are mandatory).

03

Certificates

View PDF · p. 9

Bidder's offer is liable to be rejected if they don't upload any of the certificates / documents sought in the Bid document, ATC and Corrigendum if any.

Bidders are advised to check applicable GST on their own before quoting. Buyer will not take any responsibility in this regards. GST reimbursement will be as per actuals or as per applicable rates (whichever is lower), subject to the maximum of quoted GST %.

05

Buyer Added Bid Specific ATC

View PDF · p. 10

Buyer Added text based ATC clauses [1] Bidders to provide the enclosed duly filled, Signed & sealed copy of PQR form, Checklist form along wit h all supporting documents with offer. Offer of vendors, who fulfil the PQR requirement will only be consid ered for further evaluation. [2] In case of material not offered for inspection during TPIA visit or material rejected during the TPIA inspe ction, payment to TPIA shall be made from the supplier's bill. [3] EARLY DELIVERY IS ACCEPTABLE. MATERIAL TO BE SUPPLIED AS PER DRAWING AND SPECIFICATION & I N SUITABLY PACKED CONDITION IN WOODEN BOX TO AVOID ANY DAMAGE DURING TRANSIT & STORAGE I N BHEL BHOPAL. FOR BID ITEM-01: ALL LOOSE ITEMS LIKE CONNECTORS, INSPECTION GLASS, NUTS & BOL TS, I -BOLT SHALL BE PUT IN SAME BOX WITH THE BEARING. OIL RING SHALL BE SUPPLIED IN ASSEMBLED CONDITION WITH THE BEARINGS. IDENTIFICATION MARK ON PACKING BOX ON FRONT SIDE & ALSO ON BE ARING I.E. ITEM NAME, PO NO & DRG NO., SUPPLIER IDENTIFICATION, ETC. FOR BID ITEM-02 TO ITEM-04: I DENTIFICATION MARK I.E, PO NO, DRG NO, SUPPLIER IDENTIFICATION ON PACKING BOX ON FRONT SIDE & ALSO ON BEARING BUSH.) [4] SPLITTING WILL BE DONE BETWEEN 02 SUPPLIERS AS PER RATIO AS MENTIONED IN THIS GEM BID FOR BID ITEM-02 TO ITEM-04 ONLY, IF OTHER SUPPLIER ACCEPTS L1 PRICE. PRICE MATCH REQUEST SHALL BE GENERATED THROUGH GEM PORTAL TO MATCH L1 PRICE. IF NO ONE BIDDER ACCEPT PRICE MATCH, THEN TOTAL ORDER QUANTITY WILL BE GIVEN TO L1 BIDDER. [5] Offers of vendors who or whose OEM is on our MISCC / Unit / Corporate / Customer level hold or banned / debarred, will not be considered for further evaluation. [6] Please provide duly filled "Local Content Format & Conflict of Interest among bidders / agents format" with sign & seal on your letter head. [7] Payment Terms shall be:- 100% payment in 90 days of receipt (45 days for Micro & Small Manufacturer supplier and 60 days for Medium Manufacturer supplier as registered in UDYAM certificate as per relevant MSME act in force) and subject to acceptance of material and relevant documents at BHEL. (Latest printed UDYAM certificate required). [8] Bidders has to quote price inclusive of GST. [9] As Cess is not applicable to this item, hence it is mandatory to quote Cess rate @ Zero %. [10] Recovery / deductions of amount from supplier:-

  • (a)Any amount on account of recovery from consignor / supplier under any condition shall be liable to be adjusted against any amount payable to the consignor/supplier against bills.
  • (b)For any deficiency in supplies where deduction is involved, an amount as decided by BHEL, shall be de ducted from supplier’s bills. ( c ) If it is not possible to recover the dues available from the same contract or dues are insufficient to me et the recoverable amount, balance amount shall be recovered from any money(s) payable to Supplier/Ve ndor under any contract with other Units of BHEL including recovery from security deposits or any other de posit available in the form of security instruments of any kind against Security deposit or EMD. [11] Treatment of cases regarding conflict of interest:- The bidder notes that a conflict of interest would said to have occurred in the tender process and executio n of the resultant contract, in case of any of the following situations:
  • (a)If its personnel have a close personal, financial, or business relationship with any personnel of BHEL wh o are directly or indirectly related to the procurement or execution process of the contract, which can affec t the decision of BHEL directly or indirectly.
  • (b)The bidder (or his allied firm) provided services for the need assessment/ procurement planning of the Tender process in which it is participating. ( c ) Procurement of goods directly from the manufacturers/ suppliers shall be preferred. However, if the O EM/ Principal insists on engaging the services of an agent, such agent shall not be allowed to represent mo re than one manufacturer/ supplier in the same tender. Moreover, either the agent could bid on behalf of th e manufacturer/ supplier or the manufacturer/ supplier could bid directly but not both. In case bids are rec eived from both the manufacturer/ supplier and the agent, bid received from the agent shall be ignored. H owever, this shall not debar more than one Authorized distributor (with/ or without the OEM). from quoting equipment manufactured by an Original Equipment Manufacturer (OEM) in procurements under a Propriet ary Article Certificate.
  • (d)A bidder participates in more than one bid in this tender process. Participation in any capacity by a Bid der (including the participation of a Bidder as a partner/ JV member or sub-contractor in another bid or vice versa) in more than one bid shall result in the disqualification of all bids in which he is a party. However, th is does not limit the participation of an entity as a sub-contractor in more than one bid if he is not bidding i ndependently in his own name or as a member of a JV. The Bidder shall declare that they have read and understood the above aspects, and the bidder confirms t hat such conflict of interest does not exist and undertakes that they will not enter into any illegal or undisc losed agreement or understanding, whether formal or informal with other Bidder(s), in this regard. This ap plies in particular to prices, specifications, certifications, subsidiary contracts, submission or non- submission of bids or any other actions to restrict competitiveness or to introduce cartelization in the biddi ng process. In case, the Bidder is found having indulged in above activities, the same will be considered as a violation of the tender conditions, and suitable action shall be taken by BHEL as per extant policies/ guid elines. [12] Breach of contract, Remedies and Termination:- The following shall amount to breach of contract:
  • I.Non-supply of material/ non-completion of work by the Supplier/Vendor within scheduled delivery/ compl etion period as per contract or as extended from time to time. II. The Supplier/Vendor fails to perform as per the activity schedule and there are sufficient reasons even b efore expiry of the delivery/ completion period to justify that supplies shall be inordinately delayed beyond contractual delivery/ completion period. III. The Supplier/Vendor delivers equipment/ material not of the contracted quality. IV. The Supplier/Vendor fails to replace the defective equipment/ material/ component as per guarantee cl ause. V. Withdrawal from or abandonment of the work by the Supplier/Vendor before completion as per co ntract. VI. Assignment, transfer, subletting of Contract by the Supplier/Vendor without BHEL’s written permission r esulting in termination of Contract or part thereof by BHEL. VII. Non-compliance to any contractual condition or any other default attributable to Supplier/Vendor. VIII. Any other reason(s) attributable to Vendor towards failure of performance of contract. In case of breach of contract, BHEL shall have the right to terminate the Purchase Order/ Contract either in whole or in part thereof without any compensation to the Supplier/Vendor. IX. Any of the declarations furnished by the contractor at the time of bidding and/ or entering into the cont ract for supply are found untruthful and such declarations were of a nature that could have resulted in non -award of contract to the contractor or could expose BHEL and/ or Owner to adverse consequences, financi al or otherwise.
  • X.Supplier/Vendor is convicted of any offence involving corrupt business practices, antinational activities o r any such offence that compromises the business ethics of BHEL, in violation of the Integrity Pact entered into with BHEL has the potential to harm the overall business of BHEL/ Owner. Note-Once BHEL considers that a breach of contract has occurred on the part of Supplier/Vendor, BHEL sha ll notify the Supplier/Vendor by way of notice in this regard. Contractor shall be given an opportunity to re ctify the reasons causing the breach of contract within a period of 14 days. In case the contractor fails to remedy the breach, as mentioned in the notice, to the satisfaction of BHEL, B HEL shall have the right to take recourse to any of the remedial actions available to it under the relevant p rovisions of contract. Remedies in case of Breach of Contract.
  • i)Wherein the period as stipulated in the notice issued under clause 14.1 has expired and Supplier/Vendor has failed to remedy the breach, BHEL will have the right to terminate the contract on the ground of "Brea ch of Contract" without any further notice to contractor. ii) Upon termination of contract, BHEL shall be entitled to recover an amount equivalent to 10% of the Cont ract Value for the damages on account of breach of contract committed by the Supplier/Vendor. This amou nt shall be recovered by way of encashing the security instruments like performance bank guarantee etc a vailable with BHEL against the said contract. In case the value of the security instruments available is less than 10% of the contract value, the balance amount shall be recovered from other financial remedies (i.e. available bills of the Supplier/Vendor, retention amount, from the money due to the Supplier/Vendor etc. wi th BHEL) or the other legal remedies shall be pursued. iii) wherever the value of security instruments like performance bank guarantee available with BHEL again st the said contract is 10% of the contract value or more, such security instruments to the extent of 10% c ontract value will be encashed. In case no security instruments are available or the value of the security instruments available is less than 10% of the contract value, the 10% of the contract value or the balance amount, as the case may be, will b e recovered in all or any of the following manners: iv) In case the amount recovered under sub clause (a) above is not sufficient to fulfil the amount recoverab le then; a demand notice to deposit the balance amount within 30 days shall be issued to Supplier/Vendor.
  • v)If Supplier/Vendor fails to deposit the balance amount within the period as prescribed in demand notice, following action shall be taken for recovery of the balance amount:
  • a.from dues available in the form of Bills payable to defaulted Supplier/Vendor against the same contract.
  • b.If it is not possible to recover the dues available from the same contract or dues are insufficient to meet the recoverable amount, balance amount shall be recovered from any money(s) payable to Supplier/Vend or under any contract with other Units of BHEL including recovery from security deposits or any other depo sit available in the form of security instruments of any kind against Security deposit or EMD.
  • c.In-case recoveries are not possible with any of the above available options, Legal action shall be initiate d for recovery against defaulted supplier/Vendor. vii) It is an agreed term of contract that this amount shall be a genuine pre-estimate of damages that BHE L would incur in completion of balance contractual obligation of the contract through any other agency and BHEL will not be required to furnish any other evidence to the Supplier/Vendor for the purpose of estimatio n of damages. viii) In addition to the above, imposition of liquidated damages, debarment, termination, de -scoping, short-closure, etc., shall be applied as per provisions of the contract. Note: 1) The defaulting Supplier/Vendor shall not be eligible for participation in any of the future enquiries floate d by BHEL to complete the balance work. The defaulting contractor shall mean and include:
  • (a)In case defaulted Supplier/Vendor is the Sole Proprietorship Firm, any Sole Proprietorship Firm owned b y same Sole Proprietor.
  • (b)In case defaulted Supplier/Vendor is The Partnership Firm, any firm comprising of same partners/ some of the same partners; or sole proprietorship firm owned by any partner(s) as a sole proprietor. [13] "In respect of procurement of goods or services from Micro, Small and Medium enterprises (MSMEs), t he settlement of invoice shall be only through any of the TReDS platform ( (i.e RXIL, Ml xchange, lnvoicema rt, KReDX, C2FO), authorised by the Reserve Bank of India. Such MSME suppliers to select their preferred T ReDS platform before award of contract so that the data is captured in the Order /Contract database of the Unit. They also will have the option to change the TReDS platform from the drop down menu on Suvidha p ortal of BHEL, at the time of invoice submission. Wherever the Trade Receivable is accepted by BHEL, the same shall be validated by the Unit on the respe ctive TReDS platform selected by the supplier. The routing of invoices through the TReDS platform shall not be construed as mandating discounting of su ch invoices and the MSMEs supplier shall have the option to avail or not avail financing or discounting of its receivables on the TReDS platform. In case discounting is not availed by the supplier on TReDS, the trade receivables will be paid through TRe DS as per the payment timelines indicated in the contract." .

Warranty period of the supplied products shall be 1 years from the date of final acceptance of goods or after completion of installation, commissioning & testing of goods (if included in the scope of supply), at consignee location. OEM Warranty certificates must be submitted by Successful Bidder at the time of delivery of Goods. The seller should guarantee the rectification of goods in case of any break down during the guarantee period. Seller should have well established Installation, Commissioning, Training, Troubleshooting and Maintenance Service group in INDIA for attending the after sales service. Details of Service Centres near consignee destinations are to be uploaded along with the bid.

07

Certificates

View PDF · p. 13

Material Test Certificate Should Be Sent Along with The Supply. The Material Will Be Checked by Buyer’s Lab & the Results of the Lab will be the Sole Criteria for Acceptance of the Item.

08

Scope of Supply

View PDF · p. 13

Scope of supply (Bid price to include all cost components) : Only supply of Goods

Without prejudice to Buyer’s right to price adjustment by way of discount or any other right or remedy available to Buyer, Buyer may terminate the Contract or any part thereof by a written notice to the Seller, if:

  • i)The Seller fails to comply with any material term of the Contract. ii) The Seller informs Buyer of its inability to deliver the Material(s) or any part thereof within the stipulated Delivery Period or such inability otherwise becomes apparent. iii) The Seller fails to deliver the Material(s) or any part thereof within the stipulated Delivery Period and/or to replace/rectify any rejected or defective Material(s) promptly. iv) The Seller becomes bankrupt or goes into liquidation.
  • v)The Seller makes a general assignment for the benefit of creditors. vi) A receiver is appointed for any substantial property owned by the Seller. vii) The Seller has misrepresented to Buyer, acting on which misrepresentation Buyer has placed the Purchase Order on the Seller.

While generating invoice in GeM portal, the seller must upload scanned copy of GST invoice and the screenshot of GST portal confirming payment of GST.

Similar open tenders

Soonest first

Search similar in the explorerFind this tender in the explorer

Open on GeM