S&T work in connection with (A) Bhagalpur - Dumka (SL) - CTR(P) - 13.375 Tkm (B) Jamalpur - Munger & Y-Leg (SL) - CTR(P) - 8.398 Tkm & Azanj - New Farakka (DN) - CTR(P) - 1 Tkm, (C) Mandar Hill - Han…
Ministry of Railways
Divisional Railway Manager s Office Jhaljhalia Malda
Delivers to
Malda, West Bengal
Overview
23 facts from the tenderMinistry of Railways published this works tender on eProcure on 13 Oct 2026, for Malda, West Bengal. The estimated value is ₹9 Cr and the EMD is ₹17.9 L. It closes on 4 Nov 2026, 11:00 am IST. Tender ID 92481337 · Ref MLDT_SNT_26-27_24_OT.
Timeline
- Published13 Oct 2026 · 7:56 pm
- Bidding startsin 5d 3h21 Oct 2026
- Closes4 Nov 2026 · 11:00 am
Bidding
- Bid type
- Open/Advertised
- Contract type
- Works - General · Expenditure
- Tender type
- Open
- Tendering section
- MALDA DIV
- Bidding system
- Single Packet System
- Bidding style
- Single Rate for Tender
- Validity of offer
- 60 days
- Completion period
- 365 Days
- Tender document cost
- None
- JV / consortium
- Not allowed
- Ranking order
- Lowest to Highest
- Expenditure type
- Capital (Works)
- Pre-bid meeting
- None
Buyer
- Inviting authority
- MALDA DIVISION-S AND T/EASTERN RLY
- Organisation type
- Central Govt. Ministry/Department
- Product category
- Railway related Products
- Location
- Malda, West Bengal · the inviting office's place
- Portal location
- Kolkata · as listed on eProcure
- Portal
- eProcure
- Inviting officer
- Sr. DSTE/MLDTMALDA DIVISION-S AND T/EASTERN RLY
Important dates
- Published
- 13 Oct 2026, 7:56 pm IST
- Bidding starts
- 21 Oct 2026
- Closes
- 4 Nov 2026, 11:00 am IST
Declarations by the buyer
- Complies with the Public Procurement (Make in India) Order 2017
- The tender inviting authority confirms this tender does not violate the GFR rules on procurement through GeM
- Bidders from a country sharing a land border with India must be registered with the competent authority
Schedule of work
23 items| Item | Quantity | Railways’ estimated rate | Amount |
|---|---|---|---|
| Schedule A · S&T work in connection with "Bhagalpur - Dumka (SL) - CTR(P) - 13.375 Tkm | |||
| 1Track Circuits | ₹6,79,306.40 | ||
| 2Point Machine | ₹20,80,670 | ||
| 3Trenching & Cable Laying | ₹7,18,127 | ||
| Schedule B · Jamalpur - Munger & Y-Leg (SL) - CTR(P) - 8.398 Tkm & Azimganj - New Farakka (DN) - CTR(P) - 1 Tkm | |||
| 1Track Circuits | ₹5,99,221.40 | ||
| 2Point Machine | ₹10,16,215 | ||
| 3Trenching & Cable Laying | ₹6,50,441 | ||
| Schedule C · Mandar Hill - Hansdiha (SL) - TRR(P) - 21.712 Tkm | |||
| 1Track Circuits | ₹34,15,265 | ||
| 2Point Machine | ₹20,32,430 | ||
| 3Trenching & Cable Laying | ₹17,76,831 | ||
| Schedule D · Bhagalpur - Jamalpur (UP & DN) - TSR(P) - 23.01 Tkm | |||
| 1Trenching & Cable Laying | ₹46,67,901 | ||
| Schedule E · Malda Division - TSR(P) - 9.585 Tkm | |||
| 1Details as under: | ₹22,32,031 | ||
| Schedule F · Bhagalpur - Kiul & Bhagalpur - Dumka - TTR (TWS + WCMSC) - 80 sets (1 in 12 - 77 sets and 1 in 8.5 - 3 sets) | |||
| 1Track Circuits | ₹22,69,464 | ||
| 2Point Machine | ₹1,66,45,360 | ||
| 3Apparatus Case | ₹3,81,620 | ||
| 4Trenching & Cable Laying | ₹1,05,93,629 | ||
| Schedule G · Azimganj - New Farakka - TTR (FS + TWS + WCMSC) - 81 Sets | |||
| 1Track Circuits | ₹22,59,464 | ||
| 2Point Machine | ₹1,68,53,427 | ||
| 3Apparatus Case | ₹4,57,944 | ||
| 4Trenching & Cable Laying | ₹1,07,35,910 | ||
| Schedule H · Hansdiha - Barapalasi (SL) - TRR(P) - 25.640 Tkm | |||
| 1Track Circuits | ₹39,07,545 | ||
| 2Point Machine | ₹30,48,645 | ||
| 3Trenching & Cable Laying | ₹15,74,305 | ||
| Schedule I · Malda Division - TFTR - 9 Tkm | |||
| 1Details as under: | ₹10,97,906 | ||
| Total | ₹8,96,93,657.80 | ||
The total matches the advertised value.
Documents
29 files- PDFNotice inviting tenderviewNitPdf_5571696.pdf (opens in a new tab)
- PDFAdvance Correction Slip 10GCCACSNo.10.pdfNo direct link in the notice; see the notice, page 28
- PDFAdvance Correction Slip 11GCCACSNo.11_compressed.pdfNo direct link in the notice; see the notice, page 28
- PDFChange in BG and BidSecurity FormatChangesinBGFormat.pdfNo direct link in the notice; see the notice, page 29
- PDFE BG DocumentEBGDocument.pdfNo direct link in the notice; see the notice, page 29
- PDFAnnexure AANNEXUREA.pdfNo direct link in the notice; see the notice, page 29
- PDFSelf certificate newREVISED_FORMAT_FOR_CERTIFICATE_28042023.pdfNo direct link in the notice; see the notice, page 29
- PDFAnnexure IVAnnexureIV.pdfNo direct link in the notice; see the notice, page 29
- PDFAnnexure U VIIIAnnexureU-VIII.pdfNo direct link in the notice; see the notice, page 29
- PDFGCC ACSGCCACS.pdfNo direct link in the notice; see the notice, page 29
- PDFAnnexure I Annexure II Annexure IIIAnnexureIAnnexureIIandAnnexureIII.pdfNo direct link in the notice; see the notice, page 29
- PDFAdvance Correction Slip 2GCCACSNo.2.pdfNo direct link in the notice; see the notice, page 29
- PDFAdvance Correction Slip 3GCCACSNo.3.pdfNo direct link in the notice; see the notice, page 29
- PDFAdvance Correction Slip 6GCCACSNo.6.pdfNo direct link in the notice; see the notice, page 29
- PDFAdvance Correction Slip 4GCCACSNo.4.pdfNo direct link in the notice; see the notice, page 29
- PDFAdvance Correction Slip 9GCCACSNo.9.pdfNo direct link in the notice; see the notice, page 29
- PDFAdvance Correction Slip 7GCCACSNo.7.pdfNo direct link in the notice; see the notice, page 29
- PDFTechnical CircularTechnicalcircularNo.123regardingPVCInsulatedRailwaySignallingIndoorSingle_Multicorecable.pdfNo direct link in the notice; see the notice, page 29
- PDFAdvance Correction Slip 8GCCACSNo.8.pdfNo direct link in the notice; see the notice, page 29
- PDFAdvance Correction Slip 1GCCACSNo.1.pdfNo direct link in the notice; see the notice, page 29
- PDFAdvance Correction Slip 5GCCACSNo.5.pdfNo direct link in the notice; see the notice, page 29
- PDFTelecom CircularTele_Cir_9-20231.pdfNo direct link in the notice; see the notice, page 29
- PDFGCC 2022GCC2022_1.pdfNo direct link in the notice; see the notice, page 29
- PDFAnnexure U VIAnnexureU-VI.pdfNo direct link in the notice; see the notice, page 29
- PDFAnnexure U VIIAnnexureU-VII.pdfNo direct link in the notice; see the notice, page 29
- PDFAnnexure UVAnnexureUV_1.pdfNo direct link in the notice; see the notice, page 29
- PDFLetter of CreditLetterofcreditAnnexure-B.pdfNo direct link in the notice; see the notice, page 29
- PDFAnnexure VIB Contractual TurnoverAnnexureVIBContractualTurnoverGCC2022.pdfNo direct link in the notice; see the notice, page 29
- PDFAnnexure-V(A)Annexure-V(A).pdf (opens in a new tab)
Documents to submit
Commercial-Compliance
- Document optional
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
- Document required
Scanned copy -in PDF format- of the details regarding the Association of Railway Officers with the tenderer -for details please refer ANNEXURE-U-V of Coml Compliance.
- Document required
Scanned copy -in PDF format- of the details of the works the tenderer presently in hand during the last three years -for details please refer ANNEXURE-IV Coml Compliance.
- Document required
Scanned copy -in PDF format- of the details of the List of the Arbitration cases of the tenderer during last 5 years -for details please refer ANNEXURE-U-VI of Coml Compliance.
- Document required
Scanned copy -in PDF format- of the details of the List of the Court cases of the tenderer during last 5 years -for details please refer ANNEXURE-U-VII of Coml Compliance.
- Document required
Scanned copy of the NEFT in PDF format as per Annexure - U-VIII of of Coml Compliance.
Show all 12
Technical-Compliances
- Document required
Scanned copy -in PDF format- of the details of the works completed by the firm, during the last three years -for details please refer ANNEXURE-I of Tech Compliances.
- Document required
Scanned copy -in PDF format- of the details of plants and machinery with the tenderer -for details please refer ANNEXURE- II of Tech Compliance.
- Document required
Scanned copy -in PDF format- of the details of personal and organisation of the tenderer -for details please refer ANNEXURE- III of Tech Compliance.
- Document required
Scanned copy -in PDF format- of the complete address of the firm in PDF format, to which the all correspondences shall be made by the railway.
- Document optional
Scanned copy -in PDF format- of any other letters/documents etc. -If agency intends to submit.
Custom
- Document required
The tenderer shall clearly specify whether the tender is submitted on his own (Proprietary Firm) or on behalf of a Partnership Firm / Company / Joint Venture (JV) / Registered Society /Registered Trust / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc. The tenderer(s) shall enclose the attested copies of the constitution of their concern, and copy of PAN Card along with their tender.
Eligibility
Special Financial Criteria
- Document required
- As per item no 10.0 of GCC 2022 and Advance Correction Slip No.1 to 11 of Indian Railways Standard General Conditions of Contract, April' 2022 (Copy attached in download section) - Supporting Document Mandatory.
- Submit requisite information as per Annexure-VIB, along with copy of Audited Balance Sheets - duly certified by CA / Certificate from CA duly supported by Audited Balance sheet is mandatorily.
Special Technical Criteria
- Document required
- As per item no 10.0 of GCC 2022 and Advance Correction Slip No.1 to 11 of Indian Railways Standard General Conditions of Contract, April' 2022 (Copy attached in download section) - Supporting Document Mandatory.
- Submit requisite information as per Annexure-VIB, along with copy of Audited Balance Sheets - duly certified by CA / Certificate from CA duly supported by Audited Balance sheet is mandatorily.
- Document required
Definition Of Similar Work Panel Interlocking OR Route Relay Interlocking OR Electronic Interlocking OR IBH OR Automatic Signaling OR LC gate interlocking or AFTC OR SSDAC OR MSDAC.
Partnership firm/Joint Venture (JV) / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc.
Please submit a certificate in the prescribed format (please download the format from the link given below). Non submission of the certificate, or submission of certificate either not properly filled in, or in a format other than the prescribed format shall lead to summary rejection of your offer. ( Click here to download the Format of Self Certification)
Check each criterion against the tender notice before you bid.
Commercial conditions
- EMD
- ₹1,793,900
- Tender fee
- None
Terms & conditions
29 conditionsGeneral Instructions
In case
- the office is closed due to any reason or
- any one of opening official is on leave or out from Head Quarter, on the stipulated date & time of opening of the tender, whatsoever the tender will be Opened on the next working day on which both opening officials are present at Head Quarter.
The Railway reserves the right to verify all statements, information and documents submitted by the bidder in his tender offer, and the bidder shall, when so required by the Railway, make available all such information, evidence and documents as may be necessary for such verification. Any such verification or lack of such verification,by the railway shall not relieve the bidder of its obligations or liabilities hereunder nor will it affect any rights of the railway thereunder.
In case of any wrong information submitted by tenderer, the contract shall be terminated, Earnest Money Deposit (EMD), Performance Guarantee (PG) and Security Deposit (SD) of contract forfeited and agency barred for doing business on entire Indian Railways for 5 (five) years.
Each page of the copy of documents/certificates in support of credentials, submitted by the tenderer, shall be self-attested/digitally signed by the tenderer or authorized representative of the tendering firm. Self-attestation shall include signature, stamp and date (on each page).
Special Conditions
After inspection, all the supplying materials shall be supplied to SSE/SIG/MLDT's Store along with the inspection report and challan.
Materials for execution of the work, which will be supplied by the Railway, as well as those, which will be supplied by the Contractor, will be supplied from the SSE/SIG/MLDT's Store. The contractor will have to transport them to the site of work at their own cost.
TERMS OF PAYMENT
- For all items involving supply in the rate schedule, 90% of the rate quoted in the rate schedule shall be paid to the contractor as on account bills only on receipt of the materials in good condition at the stores of concerned Inspector/s. (ii) For all items involving either installation only or supply and installation or supply and installation and commissioning, 90% of the rate quoted in the rate schedule shall be paid to the contractor as on account bills only on production of certificate by the Site Engineer that relevant portion of installation has been completed.
- The tenderer/s should note that payment against proof of dispatch of materials can be considered but will be restricted to 90% of rate schedule against Each supply item.
- The balance 10% of the rate quoted against Each item shall be paid on completion of the installation / erection and on issue of the completion certificate by the authorized Railway official/representative on submission of Final Bill in Railway Format along with Measurement Book duly measured by site Supervisor. (iv) The completion certificate shall be issued by the Engineer only when he has accepted the works wholly after full satisfaction. The payment shall be released on production of valid GST certificate. No advance payment will be made.
- Income Tax with surcharge, GST as applicable will be deducted from the bill as per rule.
For all type of Digging and trenching work should be done as per Railway Board circular (Telecom Circular No. 09/2023) avaliable in document section. No
For all type of PVC INSULATED RAILWAY SIGNALLING INDOOR SINGLE CORE CABLE / PVC INSULATED RAILWAY SIGNALLING INDOOR MULTI CORE CABLE regarding work should be done as per Railway Board Circular (Technical Circular No. 123, No. SG.94/0/Vol.XIX, dtd.09.11.2024) available in document section.
Deployment of Qualified Engineer/s at Work Sites by the Contractor are as under:- Value upto Rs. 2 Crore: 01 Diploma Holder & Value Rs. 2 - 10 Crore: 01 Degree Holder + 01 Diploma Holder.
Show all 29
The major equipments and accesseries should be of invariably same make installed on a section of at least an SSE level as per PCSTE/ER/KKK's letter no. SG.284/1/0, dt.11.06.2025.
Contractor is to abide by the provisions of Payment of Wages act & Minimum Wages act in terms of clause 54 and 55 of Indian Railways General Condition of Contract. In order to ensure the same, an application has been developed and hosted on website 'www.shramikkalyan.indianrailways.gov.in' Contractor shall register his firm/company etc. and upload requisite details of labour and their payment in this portal. These details shall be available in public domain. The Registration/ updation of Portal shall be done as under:
(a) Contractor shall apply for onetime registration of his company/firm ctc. in the Shramikkalyan portal with requisite details subsequent to issue of Letter of Acceptance. Engineer shall approve the contractor's registration on the portal within 7 days of receipt of such request.
- Contractor once approved by any Engineer, can create password with login ID (PAN NO.) for subsequent use of portal for all LOAs issued in his favour.
- The contractor once registered on the portal, shall provide details of his Letter of Acceptances (LOA) / Contract Agreements on shramikkalyan portal within 15 days of issue of any LOA for approval of concerned engineer. Engineer shall update (if required) and approve the details of LOA filled by contractor within 7 days of receipt of such request.
(d) After approval of LOA by Engineer, contractor shall fill the salient details of contract labours engaged in the contract and ensure updating of each wage payment to them on shramikkalyan portal on monthly basis.
(e) It shall be mandatory upon the contractor to ensure correct and prompt uploading of all salient details of engaged contractual labour & payments made thereof after each wage period.
Intending Tenderer must understand the work before quoting. The submission of tender shall be deemed to have been done after careful study and examination of all papers as well as work site and understanding the implication thereof.
Quoted rates will be inclusive of all type of taxes, duties and carrying cost involved in and concerned with the work.
Minimum one year guarantee and standard guarantee of minimum period as per Schedule / RDSO Specification of different items, shall be ensured for all supplying instrument, materials and workmanship of the work from the date of completion of work. During the guarantee period tenderer will be responsible for any repair/ replacement of any defective material or defective installation free of cost.
Care should be taken to avoid damage to existing gears during the work. Any damages to the Railway property shall be made good by the contractor in his own cost.
The work will be done under supervision of Sr.DSTE/MLDT or his authorized representative and disconnection will be issued by the authorised Rly. person if required.
After completion of the work authourised representative of Sr.DSTE/MLDT will certify the quality and quantity of the work.
Material inspection authority, if not mentioned otherwise, will be decided by Sr.DSTE/ER/MLDT. All the cost of inspection shall be borne by the contractor.
In case of emergency, the competent authority may change the site of work (If Rly. desires so).
All the tools and other testing equipments for installation, programming and commissioning of the system should be arranged by the tenderer at his cost. No
The tenderer has to submit sufficient credential related to the above work along with tender papers.
The Contractor & his supervisors must take proper precaution during working in station area such as platform, foot over bridge to prevent any interference with existing Rly. system & passengers.
PROVIDED always that where any of the provisions, instructions, terms & Conditions in the General Condition of Contract-2022 with latest amendments cannot be reconciled to or repugnant to any of the provision, instructions, terms and conditions in the tender, the GCC 2022 (with latest amendments) shall prevail.
Technical-Compliances
All Payments to the agency -including the refund of the EarnestMoney -EMD- of the unsuccessful bidder- will be remitted through NEFT. The Tenderer is required to declare Bank details and A/C No. etc in NEFT form.
Bidder declarations (22)
Undertakings
I/ We have visited the works site and I / We am / are aware of the site conditions.
WHEREAS the President of India acting through the Eastern Railway administration and their authorised officers has invited e-tenders for the above-mentioned work vide tender notice mentioned in the NIT Notice Inviting Tender published in the website.
AND WHEREAS I/We, have read the above NIT Notice Inviting Tender for e- tender, General instructions, Special Conditions-General, all special conditions and have purchased this e-tender document, have carefully read and understood the same, have visited the site and have satisfied myself/ourselves as to the nature of the work and site conditions before filling this e-tender.
AND WHEREAS my/our address for all communications hereinafter shall be considered as official and shall be made in the address, email Id and Mobile phone and other phone nos. given in the portal of IREPS while registering as tenderer for e-tender. In case of any change in this concerned officer of railway will be informed.
AND WHEREAS I/We state that in the event of this e-tender being unsuccessful, the aforesaid earnest money deposited by me/us may be refunded to me/us through NEFT / by a crossed cheque on the Reserve Bank of India at Kolkata.
AND WHEREAS I/We hereby sign this e-tender document digitally by virtue of the legal authorities vested with me/us to enter into commitment on behalf of the tenderer, documentary support whereof is enclosed herewith.
AND WHEREAS I/We have read and understood this e-tender document and agree to abide by the various terms and conditions contained therein. I/We also agree to keep the offer open for acceptance for a period of 60 days from the date fixed for opening of the same and in default hereof, I/We will be liable for forfeiture of my/our earnest money.
Now, therefore I/We hereby submit this e-tender and offer to do the work for the Eastern Railway at the rates quoted in the schedule through online and hereby bind myself/ourselves to complete the work in all respects within the stipulated period of completion from the date of issue of the letter of acceptance of this tender.
And I/We agree to abide by the General Conditions of Contract 2022 editions and the Unified Standard Schedule of Rates Labour Materials of 2011 edition issued by the Eastern Railway, read with all correction slips issued thereto from time to time, and to carry out the works according to the special conditions and specifications of materials and works as laid hereunder in various chapters of this e-tender document.
And I/We have understood and accept the stipulation that full value of the earnest money shall stand forfeited without prejudice to any other right or remedies if: 1. I/We do not execute the contract documents, in case my/our tender is accepted, within seven days after receipt of notice issued by the Railway that such documents are ready, o r 2 . I/we do not commence the work, in case my/our e-tender is accepted, within fifteen days after receipt of orders to that effect.
And until a formal agreement is executed, acceptance of this tender shall constitute a binding contract between us subject to modifications as may be mutually agreed between us and indicated in the letter of acceptance of my/our offer for this work.
And I/We agree to produce the details of the uploaded documents whenever demanded for verification on written request at any point of time of the tender and contract within 7 days.
Certifications
I/we the tenderer (s) am/are signing this document after carefully reading the contents.
I/We the tenderer(s) also accept all the conditions of the tender and have signed all the pages in confirmation thereof.
I/we hereby declare that I/we have downloaded the tender documents from Indian Railway website www.ireps.gov.in . I/we have verified the content of the document from the website and there is no addition, no deletion or no alteration to the content of the tender document. In case of any discrepancy noticed at any stage i.e. evaluation of tenders, execution of work or final payment of the contract, the master copy available with the railway Administration shall be final and binding upon me/us.
I/we declare and certify that I/we have not made any misleading or false representation in the forms, statements and attachments in proof of the qualification requirements.
I/We also understand that my/our offer will be evaluated based on the documents/credentials submitted along with the offer and same shall be binding upon me/us.
I/We declare that the information and documents submitted along with the tender by me/us are correct and I/we are fully responsible for the correctness of the information and documents, submitted by us.
I/we certify that I/we the tenderer(s) is/are not blacklisted or debarred by Railways or any other Ministry / Department of Govt. of India from participation in tender on the date of submission of bids, either in individual capacity or as a HUF/ member of the partnership firm/LLP/JV/Society/Trust.
I/we understand that if the contents of the certificate submitted by us are found to be forged/false at any time during process for evaluation of tenders, it shall lead to forfeiture of the Bid Security and may also lead to any other action provided in the contract including banning of business for a period of upto two year. Further, I/we and all my/our constituents understand that my/our offer shall be summarily rejected.
I/we also understand that if the contents of the certificate submitted by us are found to be false/forged at any time after the award of the contract, it will lead to termination of the contract, along with forfeiture of Bid Security/Security Deposit and Performance guarantee and may also lead to any other action provided in the contract including banning of business for a period of upto two year.
I/We have read the clause regarding restriction on procurement from a bidder of a country which shares a land border with India and certify that I am/We are not from such a country or, if from such a country, have been registered with the competent Authority. I/We hereby certify that I/we fulfil all the requirements in this regard and am/are eligible to be considered (evidence of valid registration by the competent authority is enclosed)
Similar open tenders
Soonest first- 15h 40mleftA.OHE work in connection with Sitamarhi(SMI)-Raxaul(RXL) Section- ADX Yd.-TRR(P) in passe…Ministry of Railways · Closes 16 Oct 2026
- 18h 40mleftY-Leg-Maynaguri Road -New Changrabandha(SL)-TSR(P)-19.700 Tkm (SnT Associated work).Ministry of Railways · Closes 16 Oct 2026
- 10 daysleftOpen e-tender for Complete Track Renewal/Through Sleeper Renewal work of 53.9 TKM with ow…Ministry of Railways · Closes 26 Oct 2026
- 13 daysleftInfringement removal and other associated S&T work for (i) Bangaon-Ranaghat section, in c…Ministry of Railways · Closes 29 Oct 2026
- 14 daysleftElectrical (TRD) work in connection with 1) TSR(P) work in CKW-DMGN-MRHT (SL) section, 2)…Ministry of Railways · Closes 30 Oct 2026
- 19 daysleftElectrical TRD portion of works in connection with 1) Daund - Wadi TFTR-3.00km. 2) Solapu…Ministry of Railways · Closes 4 Nov 2026
- 19 daysleftTelecom work in Construction office at Bhagalpur for improving connectivity and providing…Ministry of Railways · Closes 4 Nov 2026
- 19 daysleftSingle-tender in connection with rehabilitation of track at Km. 256/23-27 in between New…Ministry of Railways · Closes 4 Nov 2026
Search similar in the explorerFind this tender in the explorer